N-1Application 1 passage
5.1.2 Frequency Deviation p. p. 46
5.1.2 Frequency Deviation When a large frequency excursion occurs during normal operations, Balancing Authority areas connected synchronously to the Eastern Interconnection shall continue to operate in the tie line bias area control mode u...

AI summary This section outlines the procedures for managing frequency deviation and area control error (ACE) in the Eastern Interconnection. It specifies conditions under which the tie line bias area control mode should be suspended and alternative strategies implemented, including load shedding in cases of sustained negative ACE.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →