Dispatch of Non-Thermal Resources
Dispatch of Non-Thermal Resources System load data is passed in the form of a typical 168-hour weekly load shape to the GAF from the LF A Module. Then, the dispatch of non-thermal resources is performed in the following order: - 1. The tra...
AI summary The document outlines the process for dispatching non-thermal resources in energy systems, including the handling of load data, hydro generation, transactions, pumped storage hydro, and direct load control devices. After non-thermal resources are dispatched, thermal generating units serve the remaining load.