N-1Report
6 passages
ustomers. A summary of the 14 anticipated system additions and retirements is set out below in Figure 6. 15 16 Figure 6: Additions and Retirements as in the 10-Year System Outlook Resource Plan 17 Winter Additions Retirements • New wind ad...
AI summary The document outlines anticipated additions and retirements in the 10-Year System Outlook Resource Plan, focusing on new wind additions and battery storage from 2024 to 2027, along with the retirement of the Lingan 2 facility in 2025/2026.
Winter Additions Retirements • Battery Storage (Installed capacity: 10MW; firm capacity: 8MW) • Combustion turbine (50 MW) • Combustion turbines (200 MW) • New wind additions (Installed capacity 200 MW, firm 20 MW based on marginal ELCC 20...
AI summary The document outlines additions and retirements of energy generation and storage assets from 2027 to 2031, including battery storage, combustion turbines, wind additions, and coal-to-gas conversions, with specific capacity figures and retirements of older facilities.
marginal ELCC 2030/2031 of 10%) • Battery Storage (Installed capacity: 60MW; firm capacity: 23MW) • Reciprocating engine (20 MW) 2031/2032 • New wind additions (Installed capacity 200 MW, firm 20 MW based on marginal ELCC of 10%) • Combust...
AI summary The document outlines planned resource additions for the years 2030/2031 to 2032/2033, including battery storage, reciprocating engines, wind additions, and combustion turbines. It notes that many of these resources are in the development stage, and timing adjustments may occur.
18 24 21 22 24 24 5 6 7 7 Lingan 424 Cycles Service 3,495 2,632 3,101 1,651 2,607 1,191 176 182 247 222 Hours Capacity Factor 32 10 1 4 2 0 0 0 0 0 (%) Point Unit 9 8 4 6 3 0 0 0 0 0 Aconi Cycles Service 3,289 1,015 160 488 226 0 0 0 0 0 H...
AI summary The text includes a table with data on service cycles, hours, and capacity factors for Lingan and Aconi units. It notes that Lingan units will operate on HFO from 2030-2033 and references Section 3.2.4. The document is part of a 2023 10-Year System Outlook and was filed on June 30, 2023.
0.45 11S-303 Solar 15-Jan-22 GIA Executed N/A 12-T 597 07-May-21 Queens 36 36 50W Wind 31-Aug-23 FAC Complete NRIS 13-T 647 6-Oct-21 Cumberland 1.5 1.5 37N Tidal 31-Dec-23 GIA in progress NRIS 14-D 653 19-Jan-22 Halifax 0.09 0.09 24H-406 S...
AI summary The text presents a list of projects with details such as project numbers, locations, capacities, technologies, dates, and statuses. These projects include solar, wind, tidal, and battery installations across various regions in Nova Scotia, with statuses ranging from 'GIA Executed' to 'SIS in progress'.
20-T 671 05-Aug-22 Halifax 88.96 88.96 L-6004 Wind 28-Feb-26 SIS in progress NRIS SIS in progress NRIS 21-T 669 04-Aug-22 Cumberland 99 99 L-6613 Wind 31-Dec-25 Wind SIS in progress NRIS 22-T 668 03-Aug-22 Antigonish 94.4 94.4 L-7003 01-De...
AI summary The text presents a list of energy projects with details such as project numbers, dates, locations, capacities, and statuses, including SIS in progress and NRIS. These projects include wind and solar energy installations, as well as battery storage.
N-2NSPI (NSUARB) RIR-1 to RIR-12 - Redacted
4 passages
2023 10-Year System Outlook Report (NSUARB M11221) NSPI Responses to NSUARB Information Requests NON-CONFIDENTIAL 1 Request IR-7: 2 3 On page 44 of 59, NS Power provided ELCC values used in the 10-year System Outlook 4 report for various r...
AI summary NSPI explains that battery storage's effective load carrying capacity (ELCC) diminishes as penetration increases, citing the 2019 Capacity Study. This is due to their energy-limited nature, with ELCC dropping from 85% for 30 MW to 38% for 200 MW battery resources.
2023 10-Year System Outlook Report (NSUARB M11221) NSPI Responses to NSUARB Information Requests NON-CONFIDENTIAL 1 2 As displayed on the chart, at 200 MW of installed 4-hour battery storage on the Nova Scotia 3 System, the marginal ELCC i...
AI summary The document discusses NSPI's response to NSUARB information requests regarding the 2023 10-Year System Outlook Report. It highlights the Effective Load Carrying Capacity (ELCC) of a 200 MW 4-hour battery storage portfolio, noting a marginal ELCC of 35% and an overall average ELCC of 55% (110 MW). Adding a diversity credit from pairing with wind increases the firm contribution to 114 MW, as per the Capacity Study.
2023 10-Year System Outlook Report (NSUARB M11221) NSPI Responses to NSUARB Information Requests NON-CONFIDENTIAL 1 (e) Construction is currently anticipated to begin in 2025 and conclude in 2027. 2 3 (f) NS Power expects to file a capital...
AI summary NSPI outlines plans for a Reliability Tie project with construction starting in 2025 and concluding in 2027, with a capital application expected in Q3 2024. The Government of Canada announced a $130 million investment to install batteries across Nova Scotia, supporting clean energy and coal plant closures.
sure of coal-fired power plants, delivering cleaner air for Nova 9 Scotians. With this investment, Nova Scotia will have one of the largest battery 10 systems in North America. 11 12 (a) What is the status of this funding announcement? Has...
AI summary NS Power reports conditional approval of the SREP funding for battery storage projects, pending regulatory approval. The company plans to file a capital application in Q4 2023 for three battery installations, currently in SIS/FAC stages of interconnection. Projects are listed as IR 662, 664, and 697 on NS Power's OASIS site.
91323NSUARB (NSPI) IR-1 to IR-12
3 passages
Document: 305605 (P-194) Date Filed: Sept. 22, 2023 NSUARB (NS Power) Page 2 of 4 1 2 Request IR-7: 3 On page 44 of 59, NS Power provided ELCC values used in the 10-year System Outlook report 4 for various renewable resources, except for b...
AI summary The document contains regulatory requests (IR-7 to IR-10) seeking explanations on capacity contribution values for renewable resources, battery storage, hydro, and the Reliability Tie. Questions focus on ELCC values, capacity reduction trends, and studies for hybrid resource combinations.
Document: 305605 (P-194) Date Filed: Sept. 22, 2023 NSUARB (NS Power) Page 3 of 4 1 was received on July 21, 2010. In IR-10, it was noted that virtually no progress has 2 been made with this project since both the 2013 and 2014 SO Reports...
AI summary The document contains questions regarding the status of a Right-of-Way (ROW) acquisition, the Reliability Tie project's progress (including system studies, environmental compliance, and intertie agreements), and a Canadian government funding announcement for battery installations. Nova Scotia Power (NSP) is asked to explain delays and provide updates on project timelines and regulatory filings.
this investment, Nova Scotia will have one of the largest battery systems in North 28 America. 29 30 a) What is the status of this funding announcement? Has NS Power accessed the $130 31 million investment? Please elaborate. 32 b) What is...
AI summary The text includes two questions regarding Nova Scotia Power's $130 million investment in battery systems and the status of four battery storage projects. The document is filed by NSUARB (NS Power) on Sept. 22, 2023, as part of a regulatory proceeding.