N-2NSPI (NSEB) RIR 1 to 5
7 passages
DER coordination today is therefore manual, sequential, retrospective, and conducted through various vendor-specific tools which are not integrated with distribution operations. While this option for DER management may remain effective whi...
AI summary The current coordination of distributed energy resources (DER) is manual and fragmented, using non-integrated tools. As DER adoption increases, a robust and automated system is needed to manage distribution system impacts effectively.
19 Asset Description Power / Energy Location / Related Substation Project Residential battery 134 batteries, 133 in Per Unit: 5 kW N/A Smart Grid storage customer homes and AC power, 13.5- Assets are Nova Scotia one for signal and 18 kWh e...
AI summary The document outlines residential and commercial battery storage systems, solar photovoltaic installations with smart inverters, and grid-connected battery energy storage systems (BESS) across various locations in Nova Scotia. These assets are part of a Smart Grid project, with some related to a specific proceeding (M09519). The DERMS solution supports integration with aggregator platforms, though specific platforms are not confirmed.
Qualitative Assessment Criteria Assessment Rationale Strategic Fit ●●● HIGH A capable DERMS enables objectives such as real-time visibility, control, and optimization of DERs. It is also foundational for several initiatives included in the...
AI summary The document evaluates the strategic fit, benefits, cost favourability, and risk management of implementing a DERMS. It highlights the importance of DERMS for grid reliability, operational efficiency, and DER integration, while noting that implementation can be costly and complex, though prior experience and external funding may help mitigate these challenges.
Enabling - Limited customer awareness or understanding of DERs and programs - Existing compensation mechanisms may not align with the full value that DERs provide across generation and T&D systems - Limited coordination between stakeholder...
AI summary The text highlights challenges in enabling distributed energy resources (DERs), including limited customer awareness, misaligned incentives, regulatory uncertainty, and lack of coordination in deployment and integration across generation and transmission and distribution (T&D) systems.
Planning Strategies - Integrated Resource Plans (IRPs) : Evaluation of both supply and demand side resources, grid requirements and long-term requirements/action plans to meet grid needs - Distribution System Plans (DSPs) : Utility DSPs ty...
AI summary The text outlines planning and enabling strategies for integrating distributed energy resources (DERs) into the grid. It discusses Integrated Resource Plans (IRPs), Distribution System Plans (DSPs), multi-stakeholder coordination, time-varying rates, demand response programs, competitive procurement, utility-owned DERs, and value-based compensation mechanisms for DERs.
NSPI's Progress - 2020 IRP completed with annual action plan updates. - IRP set a target of 75 MW of DR capacity by 2035 and modelled DERs - DR programs including smart thermostats, EV chargers, BESS - TVR programs (TOU, CPP, TOD rate) - U...
AI summary NSPI has made progress in its Integrated Resource Plan (IRP), including setting a 75 MW DR capacity target by 2035, implementing DR programs, deploying AMI, and piloting DERMs through SGNS.
Integration Strategies - AMI: PGE currently has AMI 1.0 meters installed. In its latest DSP, PGE plans to transition to AMI Next Gen, with plans for 20% of the system to be updated by 2028, and a full system update following that. - DERMs:...
AI summary PGE is implementing integration strategies for its grid, including upgrading to AMI Next Gen meters, deploying an Enterprise DERMs platform, implementing advanced ADMS functions, and utilizing a Distributed Generation Evaluation Map to assess hosting capacity.