Home›Energy Storage›M13116›Evidence
Topic/Matter Intersection

Topic:"Energy Storage" in M13116

Matter: Northeast Power Coordinating Council (NPCC) - Third Quarter 2026 for Approval of Revised Regional Reliability Criteria
1 passage 1 document

Energy Storage across all matters →

N-1Application 1 passage
2.0 Minimizing the Impact of Events p. pp. 44-46
hority or Transmission Operator. Request assistance if required. - 4.3.2 Manually shed firm load until transmission loading and voltage return to acceptable values at all known problem locations. - 4.3.3 Open or close tie lines as required...

AI summary The text outlines procedures for managing power system emergencies, including manual load shedding, adjusting tie lines, and issuing NERC Energy Emergency Alerts. It emphasizes the role of Balancing Authorities in controlling frequency and capacity shortages, while adhering to NPCC and NERC standards.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →