N-1Application - Redacted 1 passage
Annual Peak of ATL 2,347,983 Annual Energy Requirement of ATL 10,656,168,727 p. p. 37
Annual Peak of ATL 2,347,983 Annual Energy Requirement of ATL 10,656,168,727 System Coincident Load Factor 51.81% Hydro Plant Wind Plant $ $ 752,403 $ 153,864 $ 752,403 $ 153,864 $ - - $ $ - $ - $ (389,810) $ 389,810 $ (79,715) $ 79,715 $...

AI summary The document provides technical load data for the Annual Total Load (ATL), including an annual peak of 2,347,983 and an annual energy requirement of 10,656,168,727. It includes a detailed table of system coincident load factors and energy requirements across various generation sources, including Hydro, Wind, LM6000, Gas Turbine, Batteries, and Radial to Generation Transmission.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →