Matter: Nova Scotia Power Inc. - 10-Year System Outlook Report - 2024
4 passages 4 documents

Energy Usage Patterns across all matters →

N-3NSPI (NSUARB) RIR-1 - RIR-18 1 passage
Section 2
in the 2024 Load Forecast. 24 25 Please refer to SBA IR-1 for a comparison of the 2024 Load Forecast to the “Current Policy 26 and Trends” forecast used in the 2022 Evergreen IRP. Date Filed: September 19, 2024 NSPI (NSUARB) IR-1 Page 1 of...

AI summary The text references the 2024 Load Forecast and directs readers to SBA IR-1 for comparative analysis with the 2022 Evergreen IRP. It also mentions NSPI's responses to NSUARB information requests and cites document M11764 as the 2024 10-Year System Outlook Report.

N-6Rebuttal Evidence - NSPI 1 passage
Section 8
1 Nevertheless, the SBA summarized four issues “for additional consideration by NSPI and the 2 Board”, noting that “these risks do not require immediate changes to the System Outlook”. They 3 are as follows. 4 5 2.1 Delays in Resource Deve...

AI summary The SBA highlights risks from delays in resource development and increased load growth, noting these do not require immediate changes to the System Outlook. NSPI asserts project timelines remain on track for 2030, with updates reported annually. The SBA emphasizes the need for timely supply planning adjustments due to updated load forecasts.

96453Board Letter re: Accepted as filed 1 passage
Section 3
h the Board’s 2023 ACE Plan Decision (M11017), NS Power filed The Path to 2030 report, providing detailed and specific information on how the Company will achieve its 2030 obligations. NS Power stated that Evergreen IRP scenario CE1-E1-R2,...

AI summary NS Power's 2030 Clean Power Plan and The Path to 2030 report outline strategies using the Evergreen IRP scenario CE1-E1-R2 and a new intertie project. The SBA approved the System Outlook as consistent with planning processes, noting increased system peak demand and energy forecasts.

96453Board Letter re: Accepted as filed 1 passage
Section 3
h the Board’s 2023 ACE Plan Decision (M11017), NS Power filed The Path to 2030 report, providing detailed and specific information on how the Company will achieve its 2030 obligations. NS Power stated that Evergreen IRP scenario CE1-E1-R2,...

AI summary NS Power's 2030 obligations are outlined in The Path to 2030 report, using the Evergreen IRP scenario CE1-E1-R2 and the 2030 Clean Power Plan. The 2024 10-Year SO Report incorporates this scenario, which assumes no Atlantic Loop and includes a 345 kV intertie (Reliability Tie) by 2028. The SBA affirmed the System Outlook's alignment with planning processes and known policies.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →