Matter: P-886 Nova Scotia Power Inc. (NSPI) Rate Application 2007
40 passages 17 documents

Environmental Compliance across all matters →

N-1-aNotice of Application and Direct Evidence - NSPI - REDACTED (Large File - 59 MB) 2 passages
27 2.4.2 Fuels Forecast
27 2.4.2 Fuels Forecast 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 28 29 30 Fuel costs include the cost of solid fuels, oil, natural gas and purchased power, offset by the net proceeds from export energy sales and...

AI summary The document discusses NSPI's 2007 fuel forecast, including an increase in net electricity demand and associated fuel costs. It notes that 90% of NSPI's generation will come from fossil fuels and mentions compliance with an annual sulphur dioxide emission cap. The recent credit downgrade by S&P is not factored into 2007 costs, but may impact long-term fuel procurement.

Preamble
14 18 19 20 21 22 29 30 31 27 28 The data in the table demonstrates that "A"-rated T&D companies have a projected median debt-to-total capital ratio of about 55 percent (which implies a total equity ratio of 45 percent). This capitalizatio...

AI summary The text discusses the financial and business risks faced by Nova Scotia Power Inc. (NSPI), highlighting its higher debt-to-capital ratio compared to other utilities, increased environmental compliance costs, and the absence of a fuel adjustment clause. These factors contribute to a higher business risk score and lower credit ratings for NSPI compared to other Canadian utilities.

N-1-aAppendix J - Proposed Regulation Changes 1 passage
7 .2.1 Permits and Inspections
7 .2.1 Permits and Inspections Permits and inspections will normally be of three types: - a) Regular Permits and Inspections - b) Annual Permits and Inspections - c) Special Permits and Inspections

AI summary The document identifies the three primary categories of permits and inspections required for the project: Regular Permits and Inspections, Annual Permits and Inspections, and Special Permits and Inspections.

N-2-bRIRs 77 to 84 - NSUARB to NSPI - REDACTED (Large File - 35 MB) 5 passages
Other Income
Other Income During 2005, Nova Scotia Power received a payment of $10.5 million, less $2.5 million of associated costs, from a gas supplier as part of renegotiation of certain contractual matters. In accordance with ratemaking regulations...

AI summary Nova Scotia Power Inc. (NSPI) reports on its 2005 financial performance and 2006 outlook. Key points include a $10.5 million payment from a gas supplier, the use of the taxes-payable method for income tax accounting, and the management of a $146.7 million regulatory asset for disallowed pre-2003 taxes. NSPI anticipates lower electricity load in 2006 due to weather and industrial shutdowns, while forecasting higher fuel costs due to commodity prices and environmental regulations.

Capital Resources
Capital Resources Capital expenditures amounted to $104.5 million in 2005 (2004- $145 million), of which approximately $20 million relates to the installation of environmental technology (electrostatic precipitators) at Tufts Cove generati...

AI summary The document provides a summary of capital expenditures for the year 2005, noting a decrease from the $145 million spent in 2004 to $104.5 million. A significant portion of this spending, approximately $20 million, was specifically allocated to the installation of environmental technology, specifically electrostatic precipitators, at the Tufts Cove generating station.

Corporate Environmental Governance
Corporate Environmental Governance NSPI is committed to operating in a manner that is respectful and protective of the environment, and in full compliance with legal requirements and company policy. NSPI has implemented this policy through...

AI summary Nova Scotia Power Inc. (NSPI) outlines its commitment to environmental protection through the implementation of an Environmental Management System (EMS). The EMS facilitates proactive risk identification, such as strategies to prevent oil leaks in hydro operations and initiatives to reduce associated environmental costs. Compliance is verified via an environmental audit program. Oversight is provided by the Emera Board of Directors' Environmental, Safety and Security Committee, the Emera Executive, and an Environmental Council composed of senior leadership.

Atmospheric Emissions
Atmospheric Emissions Beginning in 2005 and continuing through the end of the decade, Air Quality Regulations under the Nova Scotia Environment Act require reductions of sulphur dioxide (S02), oxides of nitrogen (NOx) and mercury emitted f...

AI summary Nova Scotia Power Inc. (NSPI) is outlining its efforts to comply with the Nova Scotia Environment Act's Air Quality Regulations and the Kyoto Protocol. The company reports meeting its 2005 emissions limits and highlights specific investments, including $20 million for electrostatic precipitator upgrades and a $177 million proposal for sulphur dioxide and NOx reduction at the Lingan plant. Additionally, NSPI is expanding its renewable energy supply through IPP contracts and proposing $5 million annually for customer energy efficiency programs.

REGULATED STATEMENT OF EARNINGS
REGULATED STATEMENT OF EARNINGS Quarter-to-Date Actual September Quarter-to-Date Budget September Quarter-to-Date Variance September Year-to-Date Actual Year-to-Date Budget Year-to-Date Variance Full Year Budget Prior YTD Actual Curr/Prior...

AI summary The document presents a Regulated Statement of Earnings for Nova Scotia Power Inc. (NSPI), detailing actual versus budgeted expenditures for various operational and management categories. Key areas include Executive Management, Project Management, Environmental Planning & Monitoring (specifically for Ambient Air and Renewable Energy), and Plant Operations at facilities such as Lingan, Pt. Aconi, and Tufts Cove. The data tracks variances for the September quarter-to-date and year-to-date periods against full-year budgets.

N-2-bRIR 76 - NSUARB to NSPI - REDACTED (Large File - 46 MB) 6 passages
Corporate Environmental Governance
Corporate Environmental Governance Emera is committed to operating in a manner that is respectful and protective of the environment, and in full compliance with legal requirements and company pol icy. Emera and its wholly-owned subsidiarie...

AI summary Emera outlines its commitment to environmental protection through the implementation of Environmental Management Systems (EMS) across its wholly-owned subsidiaries. The company utilizes these systems to proactively identify and manage environmental risks, such as preventing oil leaks in hydro operations. Governance of these initiatives is overseen by the Board of Directors' Environmental, Safety and Security Committee, the Emera executive, and a dedicated Environmental Council. Compliance is further verified through a systematic environmental audit program.

Atmospheric Emissions
Atmospheric Emissions Beginning in 2005 and continuing through the end of the decade, Air Qua lity Regu lations under the Nova Scotia Environment Act require reductions of sulphur dioxide (S02), oxides of nitrogen (NOx) and mercury em itte...

AI summary The text outlines Nova Scotia Power Inc.'s (NSPI) efforts to comply with provincial Air Quality Regulations and the Kyoto Protocol. It highlights specific investments made or planned between 2002 and 2006, including $20 million for particulate emission upgrades at Tufts Cove, a proposed $177 million project for sulphur dioxide and NOx reductions at Lingan, and contracts for 100 MW of renewable energy. Additionally, NSPI proposed a $5 million annual investment for customer energy efficiency programs based on feedback from the 2004 Customer Energy Forum.

Where We Are, and Where We Are Going
Where We Are, and Where We Are Going Emera is comm itted to operating in a manner that is respectful and protective of the environment, and in full compliance with regulatory and legal requirements. In our business, air emissions assoc iat...

AI summary Emera outlines its commitment to environmental protection and regulatory compliance, specifically addressing air emissions associated with electricity generation. The text serves as an introduction to the company's historical performance regarding emissions and its forward-looking strategies to reduce these impacts for customers and stakeholders.

Sulphur Dioxide
Sulphur Dioxide Sulphur dioxide (S02) contributes to acid rain and smog. It results from the combustion of sulphur found naturally in most fossil fueis. Since 1995, Nova Scotia Power's so2 emissions have been capped at 145,000 tonnes. The...

AI summary The text discusses Nova Scotia Power's (NSPI) efforts to manage sulphur dioxide (SO2) emissions, which contribute to acid rain and smog. NSPI has historically met emission caps by utilizing lower sulphur fuels. To comply with the Nova Scotia Energy Strategy's requirement for a further 25% reduction in the SO2 emissions cap effective in 2010, NSPI proposed a $172 million investment in environmental technology at its Lingan generating station.

Oxides of Nitrogen
Oxides of Nitrogen Oxides of nitrogen (NOx) comprise severa l different combinations of oxygen and nitrogen, both found in the air. NOx contributes to acid rain and smog, is a key component in the development of ground level ozone, and is...

AI summary The text discusses the environmental impact of Oxides of Nitrogen (NOx), specifically their role in creating acid rain, smog, and ground-level ozone through fossil fuel combustion. It highlights the Nova Scotia Energy Strategy's requirement to reduce NOx emissions to a cap of 21,360 tonnes by 2009. Nova Scotia Power Inc. (NSPI) intends to comply with these regulations by installing low-NOx combustion firing systems, specifically seeking approval for a $5 million investment at the Lingan generating station.

Mercury
Mercury Mercury emissions from power generation result from naturally occurring mercury found in most fossi l fuels. NSPI's mercury emissions have been steadily decreasing since 2000 through the use of lower mercury fuels. The first mercur...

AI summary Nova Scotia Power Inc. (NSPI) reports that its mercury emissions from power generation have consistently decreased since 2000 due to the use of lower mercury fuels. While the current mercury limit was established in 2005 as part of the Nova Scotia Energy Strategy—capping annual emissions at 168 kg—NSPI is currently evaluating technological and operational options to significantly reduce mercury output in anticipation of stricter national emission limits expected by 2010.

N-2-dRIRs 1 to 46 - CME to NSPI - REDACTED (Large File - 18 MB) 1 passage
Rationale
nerate approximately 90%-95% of Emera's consolidated assets and cash flow. Although Emera's nonregulated businesses do not materially influence the ratings at present, they have a higher risk profile. Nova Scotia Power's above-average busi...

AI summary The text analyzes the credit profile of Nova Scotia Power Inc. (NSPI), noting that it represents 90%-95% of Emera's consolidated assets. NSPI's business profile is considered above-average due to a favorable regulatory environment, its dominant monopoly position, and a rate-of-return regulation that recovers costs and capital expenditures. However, the text notes that the financial profile is below average. It highlights that while leverage is currently supported by monopoly status, potential industry restructuring and deregulation in Nova Scotia could increase future business risk.

N-2-eRIRs 1 to 49 - Liberty to NSPI - REDACTED (Large File - 15 MB) 5 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty REDACTED Question IR-12: Please provide the current solid fuel quality specifications for each NSPI power generating station in terms of both boiler design and environmental control eq...

AI summary Liberty responded to Information Request IR-12 regarding the solid fuel quality specifications and environmental control equipment for Nova Scotia Power Incorporated (NSPI) power generating stations. NSPI utilizes a blend of solid fuels, choosing specific types based on cost, operational needs, and emission limits. The response highlights that most solid fuel generators use electrostatic precipitators, with the exception of Point Aconi, which uses a baghouse. Additionally, it notes that Trenton 6 and Lingan 3 are equipped with low NOx burners.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty Question IR-16: Please provide a summary of the current requirements for reduction in emissions from generating stations for each of the following pollutants including Greenhouse Gases...

AI summary Liberty responds to an information request regarding emission reduction requirements for generating stations in Nova Scotia. The response notes that there are currently no greenhouse gas reduction requirements, though potential requirements exist under the federal government's proposed Clean Air Act (Bill C30). For sulphur dioxide, NSPI has an annual cap of 108,750 tonnes through 2009, decreasing to 72,500 tonnes from 2010 onwards. Specific operational limits are also noted for the Point Aconi Generating Station and heavy fuel oil.

Nitrogen Oxide
Nitrogen Oxide Point Aconi Generating Station is required to not exceed 258 ng/joule during operation. For the year 2009, and beyond until changed, NSPI's Nitrogen Oxides (NOx) cap has been set at 21 ,365 tonnes per year. This is a 36 perc...

AI summary The document outlines the operational constraints and emission caps for Nitrogen Oxides (NOx) associated with the Point Aconi Generating Station. Specifically, it mandates that emissions must not exceed 258 ng/joule during operation. Furthermore, it establishes a long-term NOx cap for NSPI set at 21,365 tonnes per year (effective from 2009 onwards), representing a 36 percent reduction in emissions.

Mercury
Mercury Mercury air emissions are capped at 168 kg per year. The Canadian Council of Ministers of the Environment has agreed to Canada Wide Standards that would reduce NSPI air emissions of Mercury to 65 kg per year for 2010 (and beyond un...

AI summary The document outlines the mercury air emissions limits for Nova Scotia Power Incorporated (NSPI). Current emissions are capped at 168 kg per year. However, it notes that the Canadian Council of Ministers of the Environment has established Canada Wide Standards aimed at reducing these emissions to 65 kg per year for 2010 and beyond, unless otherwise modified.

Nova Scotia Energy Strategy
Nova Scotia Energy Strategy The Province has not revisited its 2001 Energy Strategy. The revision to the Provincial Air Quality Regulations in 2005, which established the current and 2009/2010 S02 and NOx emission limits, is consistent wit...

AI summary The text notes that the Province of Nova Scotia has not updated its 2001 Energy Strategy. It highlights that the 2005 revision to the Provincial Air Quality Regulations, which set the current and 2009/2010 SO2 and NOx emission limits, remains consistent with the original 2001 Energy Strategy framework.

N-2-fRIRs 1 to 10 - NSDOE to NSPI - REDACTED 1 passage
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: NSDOE Question IR-10: What are the projected incremental fuel costs to meet the more stringent 2005 S02 compliance requirements through fuel switching strategies for 2006 and 2007? Response IR...

AI summary Nova Scotia Power Inc. (NSPI) provided a response to an Information Request from the Nova Scotia Department of Energy (NSDOE) regarding the projected incremental fuel costs for meeting 2005 S02 compliance requirements. NSPI estimates the compliance costs to be $18 million for 2006 and $8 million for 2007. The response notes that these costs are subject to change based on market and operating conditions, specifically highlighting the narrowing price gap between high and low sulphur fuels in 2007.

N-7-bRIRs 142 to 143 - SEB to NSPI - REDACTED (Large File - 45 MB) 1 passage
Maritimes & Northeast
Maritimes & Northeast - Maritimes & Northeast Pipeline - $2B, 1,300 km pipeline linking Sable gas fields to US northeast - EMA has 12.9% equity investment - Duke and Exxon Mobil also partners - US Phase IV LNG expansion moving forward - $3...

AI summary The text provides a brief overview of the Maritimes & Northeast pipeline, a $2 billion, 1,300 km infrastructure project connecting Sable gas fields to the US Northeast. It notes that Emera (EMA) holds a 12.9% equity investment in the project alongside partners Duke and Exxon Mobil. Additionally, it mentions the progression of the US Phase IV LNG expansion, which is a $300 million USD project.

N-7-bRIRs 92 to 141 - SEB to NSPI - REDACTED (Large File - 11 MB) 1 passage
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB Question IR-129: What is NSPI's allowable limit in S02 tonnes per year for 2007 and 2008? Response IR-129: 2007 108,750 tonnes 2008 108,750 tonnes DATE FILED: December 6, 2006 SEB IR-129 P...

AI summary Nova Scotia Power Incorporated (NSPI) provided a response to an Information Request (IR-129) from the Nova Scotia Utility and Review Board (SEB). The response specifies NSPI's allowable limit for S02 emissions, which was set at 108,750 tonnes per year for both 2007 and 2008.

N-14Evidence filed by John Antonuk, Donald T. Spangenberg, Jr. and John B. Adger, Jr. (on behalf of NSUARB) (Large File - 26 MB) 2 passages
Q. PLEASE SUMMARIZE WHAT YOU SAID IN THE LAST CASE ABOUT NSPI'S ENVIRONMENTAL-COMPLIANCE PLANNING.
Q. PLEASE SUMMARIZE WHAT YOU SAID IN THE LAST CASE ABOUT NSPI'S ENVIRONMENTAL-COMPLIANCE PLANNING. A. Given NSPI's prior decision not to build the scrubber, it became incumbent on NSPI as of that decision to begin to employ a portfolio app...

AI summary NSPI did not adopt an appropriate portfolio approach to low-sulfur coal procurement for over three years after deciding not to build a scrubber, relying heavily on the spot market. Additionally, NSPI did not consider the construction or use of gas-fired power plants as an environmental-compliance option.

Q. WHAT PRINCIPAL STEPS HAS NSPI TAKEN TO DETERMINE OPTIMUM MEANS FOR MEETING EMISSION-CONTROL REQUIREMENTS?
Q. WHAT PRINCIPAL STEPS HAS NSPI TAKEN TO DETERMINE OPTIMUM MEANS FOR MEETING EMISSION-CONTROL REQUIREMENTS? A. Since the conclusion of the last case, NSPI filed with the Board a plan for Air Emissions Capital Expenditures. While this appl...

AI summary NSPI has taken steps to meet emission-control requirements by filing a plan for Air Emissions Capital Expenditures with the Board, although this application was discontinued. NSPI will now submit an Integrated Resource Plan to the Board, which will satisfy Liberty's recommendation on emission control.

N-16Review of NSPI's Fuel Costs on behalf of Avon Valley Greenhouses et al. (AVON) REDACTED (Large File - 38 MB) 1 passage
LIST OF ENVIRONMENTAL/RENEWABLE ENERGY PROJECTS
LIST OF ENVIRONMENTAL/RENEWABLE ENERGY PROJECTS - For an Italian utility, a report on German CO 2 emissions legislation and particularly its applicability to new and retrofitted plants. - For a German green energy company, assistance with...

AI summary The text lists various environmental and renewable energy projects undertaken by different companies and organizations, covering topics such as CO2 emissions legislation, solar and wind energy projects, grid constraints, biomass availability, and coal mine methane industry studies.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 1 (Large File - 22 MB) 1 passage
STANDARD CONTRACT RIDER NO. 63 S02AND NOx EMISSION ALLOWANCE ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES
STANDARD CONTRACT RIDER NO. 63 S02AND NOx EMISSION ALLOWANCE ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES A. The applicable charges for electric service to the Company's retail customers shall be increased or decreased, to the neares...

AI summary The text describes a specific contractual rider (No. 63 S02) designed to adjust retail electric service charges based on the costs of Sulfur Dioxide (SO2) and Nitrogen Oxides (NOx) emission allowances. The adjustment is calculated to the nearest 0.001 mill per kWh using a specific mathematical formula. This mechanism ensures that the Company can recover or credit the costs associated with these environmental emission allowances across all retail rate schedules.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 3 (Large File - 23 MB) 1 passage
LOUISVILLE GAS AND ELECTRIC COMPANY
LOUISVILLE GAS AND ELECTRIC COMPANY MONTHLY ELECTRIC ADJUSTMENTS MONTHLY GAS ADJUSTMENTS Fuel Adjustment Clause !Cents/Kwh) STOD Cost Recovery Applicable to Rate LC !Cents/Kwh) DSM RATES Rate RS Rate GS Rate & VFD & STOD {Cents Per Kwh) LC...

AI summary The document provides a historical monthly data table for Louisville Gas and Electric Company, detailing various electric and gas adjustments from late 2005 through mid-2006. Key metrics include the Fuel Adjustment Clause, STOD Cost Recovery, DSM Rates for various service categories, Environmental Cost Recovery Surcharges, Merger Surcredits, and Value Delivery Surcredits. The data tracks fluctuations in costs and surcharges for both electricity and gas supply across different retail and generation service rates.

N-46Rebuttal Evidence of NSPI - Appendix A to J - REDACTED (Large File 27 MB) 7 passages
Natural Gas Industry Environmental Issues
Natural Gas Industry Environmental Issues - For the Environmental Protection Agency, Mr. Crook has directed ICF's support of the Natural Gas STAR Program, a cooperative gas industry/government program that identifies ways to reduce methane...

AI summary The text describes Mr. Crook's work with the Environmental Protection Agency (EPA) and the gas industry to address methane emissions. Key initiatives include supporting the Natural Gas STAR Program, which focuses on identifying best management practices and cost-effective emission reduction technologies. Additionally, Mr. Crook led the development of the national methane emissions inventory for reporting to the United Nations and created gas industry marginal abatement curves to determine emission reduction feasibility at different price levels.

Office of Pipeline Regulation (OPR)
Office of Pipeline Regulation (OPR) 1978- 1983 Served as an Industry Economist in Pipeline Certificates Division, managed environmental assessments (EAs) and environmental impact statements (EISs) for pipeline projects, curtailment plans a...

AI summary The document outlines the professional experience of an individual who served as an Industry Economist in the Pipeline Certificates Division of the Office of Pipeline Regulation (OPR) from 1978 to 1983. Key accomplishments include managing environmental assessments for pipeline projects, developing air quality impact assessments for natural gas curtailment plans in Florida, conducting cost-benefit analyses on oil pipeline impacts in Port Everglades, and researching socioeconomic impact costs for the Alaska Natural Gas Transportation System (ANGTS).

Office of Regulatory Analysis (Office of Economics) 1975-1978
Office of Regulatory Analysis (Office of Economics) 1975-1978 Served on the staff of the Commission's Advisor on Environmental Quality, an office created to implement the National Environmental Policy Act (NEPA); helped develop environment...

AI summary The text describes the professional experience of an individual serving in the Office of Regulatory Analysis (Office of Economics) between 1975 and 1978. Key responsibilities included assisting the Commission's Advisor on Environmental Quality in implementing the National Environmental Policy Act (NEPA), developing environmental regulations, and performing policy and management analyses. Notable achievements include developing FERC regulations regarding the National Historic Preservation Act and conducting socioeconomic impact analyses for the Alaska Natural Gas Transportation System (ANGTS).

Bureau of Power (Office of Hydroelectric Licensing) 1972 -1975
Bureau of Power (Office of Hydroelectric Licensing) 1972 -1975 Served on Bureau of Power's environmental staff preparing environmental impact statements specializing in the economic and cultural resource impacts of hydroelectric projects....

AI summary The text describes the professional experience of an individual serving on the Bureau of Power's environmental staff between 1972 and 1975. The role focused on preparing environmental impact statements for hydroelectric projects, specifically analyzing economic and cultural resource impacts. Key achievements include developing the first studies on the impact of power dams on historic and archeological resources, establishing federal policies in response to new legislation, and creating a compliance primer for hydro license applicants.

Challenges
Challenges - Lack of a FAM/regulatory lag impacts earnings - Earnings sensitive to weather and fuel costs - High-cost generator/low population density of franchise - Future competitive pressures from gas distribution network under developm...

AI summary The document outlines several operational and financial challenges facing the utility. Key issues include the impact of regulatory lag on earnings due to the fuel adjustment mechanism, and high sensitivity to weather and fuel costs. The utility faces structural challenges such as high-cost generation and low population density within its franchise. Furthermore, it identifies competitive threats from a developing gas distribution network by Heritage Gas Limited and environmental risks associated with coal-based generation and oil exposure.

Challenges
Challenges - (I) In the absence of a FAM, the Company must apply to the regulator for recovery of fuel costs. Regulatory lag can have a material impact on earnings and cash flow, since rate decisions cannot be implemented retroactively. -...

AI summary Nova Scotia Power Inc. (NSPI) outlines several operational and financial challenges, including the need for a fuel adjustment mechanism (FAM) to mitigate regulatory lag and commodity price volatility. The Company highlights its high-cost generation profile and the competitive threat posed by natural gas, noting that infrastructure costs and residential load profiles may limit market share loss. Additionally, NSPI discusses the financial burden of environmental compliance for its coal-based generation and its ongoing discussions with the UARB regarding cost-recoverable emissions reduction strategies.

Preamble
Emera's capital spending should be about C$200 million per year in 2006. The bulk of this capital spending will be directed at maintenance of NSPI's existing assets and the growth of BHE's regulated transmission asset base. In 2008 and bey...

AI summary The text outlines Emera's projected capital spending, estimated at approximately C$200 million annually for 2006. These expenditures are primarily earmarked for the maintenance of Nova Scotia Power Inc. (NSPI) assets and the expansion of Bayonne Hydroelectric Corporation's (BHE) regulated transmission asset base. Looking toward 2008, the document notes potential significant capital requirements for NSPI regarding new generation capacity and environmental controls, contingent upon regulatory approval.

N-52N-52.pdf 1 passage
Nova Scotia Power Inc. - Application for Approval of Certain Revisions to its Rates, Charges and Regulations - P-886
h carbon intensity fuel. The UARB should play a leading role in shaping fuel consumption patterns by this utility. Any increase should be denied pending an immediate cessation of the use of this fuel. Given that Lingan is in the top ten po...

AI summary The Sierra Club of Canada opposes a rate increase by Nova Scotia Power Inc. (NSPI) due to environmental concerns, specifically the continued use of high carbon intensity fuel and inadequate emissions controls at the Lingan facility. NSPI responds that the UARB has provided full access to fuel contract information and that most intervenors have agreed to a revised fuel budget for 2007.

86472Submission - Re: Future Filing Requirements and comments on Board Draft Strawman 1 passage
OP - Organization Profile
OP - Organization Profile - 1. Latest regulated annual reports of NSPI and EMERA - 2. Current organization chart ofNSPI showing all positions reporting no further than two levels down from the President and CEO, including a full organizati...

AI summary The document outlines a list of requested information for a regulatory proceeding, including organizational profiles, financial documents, and operational data related to NSPI and EMERA. It includes details on assets, reliability statistics, customer information, and emissions targets.

86477Submission - Re: Rate Hearing Future Filing Requirements 3 passages
OUTLINE- STANDARD FILING REQUIREMENT TOPICS
OUTLINE- STANDARD FILING REQUIREMENT TOPICS - I. Detailed Summary of Proposed Adjustments to Revenue Requirement - II. Fuel-Related Information - (a) Detailed Fuel Forecast - (b) Fuel Quality and Price Information Actual v. Compliance v. F...

AI summary The document outlines standard filing requirements for a regulatory proceeding, focusing on detailed revenue requirement adjustments and fuel-related information, including forecasts, procurement, transportation, and emissions.

Also, SEB IR-44 requested:
Also, SEB IR-44 requested: For each plant that can burn more than one type of fuel (e.g. gas and HFO, coal and petcoke ), please provide: - (a) Name of Plant. - (b) The heat rate (BTU per kWh) for each type of fuel at a 50% loading. - (c)...

AI summary SEB IR-44 requested detailed information on fuel burn, heat rates, and SO2 emissions for each plant capable of burning multiple fuel types. SEB argues that this data is necessary to evaluate the efficiency of NSPI's operations and ensure consistency between forecasted and past performance.

(n) Emissions Reduction Information
(n) Emissions Reduction Information 16. Emissions targets are an increasingly important component of NSPI's fuel planning and decision-making. In P-886, Liberty IR-16 asked for a summary of the current legislative requirements for reductio...

AI summary The text discusses emissions reduction requirements and force majeure issues in fuel contracts. SEB submits that NSPI should file summaries of legislative requirements and force majeure provisions affecting fuel costs. This includes details on past events, replacement fuel, and economic impacts.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →