3.1. Changes to Electricity Planning Environment One of the key changes to the electricity planning environment since the 2023 Evergreen IRP process is that the federal government finalized the Clean Electricity Regulations (CER). The CER...
AI summary The federal Clean Electricity Regulations (CER) require 80% renewable energy by 2030 and set emissions limits. NSPI claims its 2023 Evergreen IRP complies with CER, though it anticipates incremental system costs without quantifying them. The CER allows exemptions for planned thermal units meeting construction timelines.
2025 10-Year System Outlook, pages 45-46, "The capacity additions and retirements are in alignment with the CE1-E1-R2 Evergreen IRP scenario and the Province of Nova Scotia's 2030 Clean Power Plan." from New Brunswick, the current relative...
AI summary The 2025 10-Year System Outlook report shows a 25% reserve margin by 2029/2030, indicating a 119 MW surplus, but NS Power has not adjusted its capacity plans. The report does not address potential impacts of battery storage, ELCC parameter changes, or the Net Zero Atlantic study on 2030 resource needs, despite these factors possibly reducing peak load forecasts.