HomeEquity AccessM03097Evidence
Topic/Matter Intersection

Topic:"Equity Access" in M03097

Matter: CI# 28098 - P-128.07 - NSPI WO -  Authority to Overspend the Tufts Cove 6 Waste Heat Recovery Project - $8,699,864Approximate value for approval of $8.5 million.
2 passages 1 document

Equity Access across all matters →

N-3Redacted NSPI (NSUARB) IR-1 to IR-20 7/16/2010 2 passages
3.8.3.7. Assistive Listening Devices (See Appendix A, Division B, Volume 2, A-3.8.3.7. NBC) p. p. 43
3.8.3.7. Assistive Listening Devices (See Appendix A, Division B, Volume 2, A-3.8.3.7. NBC) - (1) Except as permitted in Sentence (2), in buildings of assembly occupancy, all classrooms, auditoria, meeting rooms, churches or places of wors...

AI summary This section mandates the installation of assistive listening systems in specific buildings and rooms, with exceptions for induction loop systems that cover only half the seating area.

Part 3 - Fire Protection, Occupant Safety and Accessibility p. p. 43
Part 3 - Fire Protection, Occupant Safety and Accessibility

AI summary This section of the document addresses fire protection, occupant safety, and accessibility considerations within the regulatory proceeding. It outlines requirements and standards related to building safety, emergency response, and accessibility compliance.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →