29 Q. HOW HAVE YOU DEALT WITH THE QUESTIONS OF TURBINE TYPE AND THE 30 CONDITION OF THE HOST FACILITY'S EXISTING EQUIPMENT?
29 Q. HOW HAVE YOU DEALT WITH THE QUESTIONS OF TURBINE TYPE AND THE 30 CONDITION OF THE HOST FACILITY'S EXISTING EQUIPMENT? 31 A. On the question of turbine type, we believe that tying the operation of a CHP project to 32 the host's steam...
AI summary The response addresses turbine type by proposing a condensing turbine rate to mitigate risks for COMFIT projects, avoiding CHP project ties to steam needs. Information on existing sawmill equipment was sought via ANSS but went unanswered, leading to two boiler replacement scenarios in analysis.