Topic/Matter Intersection

Topic:"Evidence Requirements" in M03669

Matter: E-ENSC-R-10 - Efficiency Nova Scotia Corporation - Electricity Demand Side Management Plan for 2012A request by Efficiency Nova Scotia for approval of a $43.7 million Demand Side Management plan for the 2012 operating year.  (Also see Matter Nos. M04538 and M04539)
2 passages 2 documents

Evidence Requirements across all matters →

IR-1 to IR-31 issued by Mel Whalen, Multeese Consulting Inc. (Board Counsel Consultant)06607 3/17/2011 1 passage
Request IR-5 With respect to Figure 5.1, a) If the annual avoided energy and avoided capacity costs used in the development of the TRC's and PAC's are different from those used to assess the 2011 DSM Plan, Please provide them. Please provide the date of the most recent update. Please confirm that the avoided costs currently being used were derived using the same methodology as was used to develop the avoided costs for the 2011 DSM programs. If not, please provide the new derivation. b) Please confirm that avoided costs are being applied in the same manner as in 2011. c) Please provide the derivation of the TRC and PAC results for two of the measures in the Efficient Products program that have different life expectancies. Request IR-6 With respect to Figure 5.1, Note e, please provide the derivation of the "historic savings" of 10 Gwh associated with the adoption of Codes and Standards. Request IR-7 With respect to page 15, line 17, please provide the basis for concluding that the industrial projects "were not included in the 2009 IRP Update" and reconcile it to the statement in Note 13 that "All DSM is assumed to be included in the projection used in the 2009 IRP". Request IR-8 With respect to page 15, lines 19 - 23, a) Please provide the "preliminary investigation" provided to ENSC by a third-party specialist. b) Please provide the qualifications of the third-party specialist to complete this work. Request IR-9 With respect to page 16, line 25, please provide the basis on which ENSC concludes that
Request IR-5 With respect to Figure 5.1, a) If the annual avoided energy and avoided capacity costs used in the development of the TRC's and PAC's are different from those used to assess the 2011 DSM Plan, Please provide them. Please provi...

AI summary The document contains regulatory requests (IR-5 to IR-10) seeking clarifications on avoided costs methodology, historical savings derivation, IRP inclusion of industrial projects, third-party investigations, and load forecast assumptions. Key topics include demand-side management (DSM), integrated resource planning (IRP), forecasting methodologies, and evidence requirements.

06953NSDOE/NSE Closing Submission 5/13/2011 1 passage
Via Email p. p. 0
Via Email Nancy MacNeil Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 3rd Floor - 1601 Lower Water Street Summit Place Halifax, NS B3J 3P6 Dear Ms. MacNeil: Re: Efficiency Nova Scotia Corporation - Application for A...

AI summary Final submissions are made on behalf of the Nova Scotia Department of Energy (NSDOE) and Nova Scotia Environment (NSE) for the approval of the 2012 Electricity Demand Side Management Plan. Submissions reference testimony from a hearing held on April 19, 2011, and pre-filed evidence.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →