Matter: P-194 - Nova Scotia Power Inc. (NSPI) - 2022 Load Forecast Report
3 passages 3 documents

Evidence Requirements across all matters →

N-9Evidence - Synapse 1 passage
Section 28
conomic impact variations. Details can be found in Appendix D and generally appear plausible, with temperature being the greatest near-term uncertainty and the economic uncertainty dominating by 2032. The peak load sensitivity used a set o...

AI summary The text highlights the need for a 2032 peak load sensitivity analysis, requests clarification on assumptions in Figure D8, and recommends future analyses incorporating proactive policy actions. It also notes improved alignment between the 2031 forecast and 2020 IRP scenarios.

87729Board Decision Letter 1 passage
Section 1
October 31, 2022 [email protected] Jennifer Ross Manager, Regulatory Strategy Nova Scotia Power Inc. 1223 Lower Water Street Halifax, NS B3J 3S8 Dear Ms. Ross: M10569 – Nova Scotia Power Inc. – 2022 Load Forecast Report – (P-194) On...

AI summary Nova Scotia Power Inc. submitted its 2022 10-Year Load Forecast Report, triggering a regulatory proceeding. The Board established a paper hearing timeline and approved confidentiality measures. Multiple intervenors (SBA, CA, IG, HGL, EOne) and Synapse Energy Economics participated, with evidence submissions and rebuttals exchanged between June and September 2022.

86600Synapse (NSPI) IR-1 to IR-41 1 passage
Section 27
34: 29 Appendix B: Small General Service Model (pp 8-13) 30 a. Please provide in electronic spreadsheet format the data and the statistical model 31 parameters and the full results used to produce the commercial model coefficients and 32 s...

AI summary The text requests detailed data and statistical model parameters related to the Small General Service Model, including spreadsheet formats for commercial model coefficients, statistics tables, and calculations for variables like XHeat, XCool, and XOther.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →