Topic/Matter Intersection

Topic:"Evidence Requirements" in M12795

Matter: Town of Berwick Electric Commission - Factorydale Hydropower Plant Refurbishment - $6,000,000
1 passage 1 document

Evidence Requirements across all matters →

B-3-(i)Appendices - Redacted 1 passage
Table 2 Flood and Earthquake Hazards, Standards-Based Assessments p. p. 45
Table 2 Flood and Earthquake Hazards, Standards-Based Assessments Dam Classification[1] Annual Exceedance Probability - IDF [2] Annual Exceedance Probability - Earthquake [3] Low 1/100 1/100 Significant Between 1/100 and 1/1000 [4] Between...

AI summary Table 2 outlines flood and earthquake hazard standards based on dam classification, specifying annual exceedance probabilities for different levels of risk. The table references guidelines from the Canadian Dam Association and includes terms like PMF (Probable Maximum Flood) and MCE (Maximum Credible Earthquake).

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →