N-3NSPI (CA) RIR 1 to 32 - Redacted 3 passages
Section 13 p. p. 23
2026 Annual Capital Expenditure (ACE) Plan (NSEB M12619) NSPI Responses to Consumer Advocate Information Requests

AI summary The 2026 Annual Capital Expenditure (ACE) Plan (NSEB M12619) includes NSPI's responses to information requests from the Consumer Advocate. The document outlines NSPI's capital spending proposals and related justifications.

Preamble p. p. 23
7 8 (b) The Atlantic Utilities SAIFI and SAIDI are calculated based on the totals of all Customers, Customer Interruptions, and Customer Hours of Interruption each year of the utilities included in the comparator group. Please refer to the...

AI summary The text discusses the calculation of SAIFI and SAIDI metrics for Atlantic Utilities, using customer interruption data. It also references the 2026 Annual Capital Expenditure (ACE) Plan and NSPI's responses to consumer advocate information requests.

CONFIDENTIAL (Attachment Only) p. p. 26
CONFIDENTIAL (Attachment Only) 1 necessary to account for the potential additional costs associated with potential, necessary 1.9 X Winding Voltage 13.2 kV 13.2 1.10 X Winding Connection Wye-gnd Wye-gnd 1.11 X Winding BIL Line End 95 kV 95...

AI summary The text provides technical specifications and compliance details for a transformer, including voltage, winding connections, losses, and adherence to industry standards. It includes cost estimates for load and no-load losses, as well as details about the load tap changer and noise ratings.

N-6NSPI (NSEB) RIR 1 to 202 - Redacted 2 passages
WACC Rate 5.08% p. p. 50
WACC Rate 5.08% WACC Rate 5.08% System TOTAL or NPV 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 Annapolis Decommissioning Total Capital Investment $ 33,683,000 $ 2,780,000 $ 1,209,000 $ 18,069,...

AI summary The document presents a WACC rate of 5.08% and includes a table detailing capital investments and NPV across various systems and years, indicating long-term financial planning for decommissioning and sustaining projects in Nova Scotia.

Section 2119 p. p. 69
2026 Annual Capital Expenditure (ACE) Plan (NSEB M12619) NSPI Responses to NSEB Information Requests

AI summary The document outlines the 2026 Annual Capital Expenditure (ACE) Plan submitted by NSP in response to information requests from the NSEB. It provides details on capital expenditures and related financial planning for the upcoming year.

100296Confidential Undertaking 1 passage
Section 3
- 1. NS Power will provide Designated Confidential Information, as defined herein, to the Designated Recipient as defined in the undertaking to which this schedule is attached. - 2. Designated Confidential Information shall consist of mate...

AI summary NS Power outlines the types of information designated as confidential in its 2026 ACE Plan filing, including engineering studies, commercial quotations, and proprietary third-party information, which are confirmed as confidential by the Nova Scotia Energy Board.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →