Matter: Nova Scotia Power Inc. - 2025 Annual FAM Report  (Fuel Adjustment Mechanism)
4 passages 3 documents

Financial Instruments across all matters →

N-1Annual FAM Report 2025 - Redacted 1 passage
Section 6 p. p. 2
\ The FAM Budget reflects the GRA Filing for 2026 of $918.6 million. (1) Includes losses for all customer classes, with the exception of Export Sales. (2) 2024 FAM Fuel Cost per MWh normalized for the receipt of the FLG2 was $87.58/MWh.

AI summary The FAM Budget for 2026 is set at $918.6 million, reflecting the GRA Filing. The fuel cost per MWh in 2024 was $87.58, normalized for the receipt of FLG2.

N-2NSPI (NESB) RIR 1 to 17 - Redacted 2 passages
Preamble p. p. 3
\ The FAM Budget reflects the GRA Filing for 2026 of $918.6 million. (1) Includes losses for all customer classes, with the exception of Export Sales. (2) 2024 FAM Fuel Cost per MWh normalized for the receipt of the FLG2 was $87.58/MWh.

AI summary The FAM Budget for 2026 is set at $918.6 million, reflecting the GRA Filing. Fuel costs per MWh in 2024 were $87.58, normalized for the receipt of FLG2.

Section 48 p. p. 3
\ \ 2026 Budget reflects the 2026 GRA Filing of $918.6M

AI summary The 2026 budget is based on the 2026 GRA Filing, which amounts to $918.6 million. This figure is significant for planning and financial considerations in the regulatory process.

101683NSEB (NSPI) IR-1 to IR-17 - Redacted 1 passage
Preamble
- What explains the substantial decrease in opacity derates in 2025 relative to 2024? - Request IR-12: - Reference: Tab A7NC - Please explain why total actual capital spending in 2025 (cell C33) was 23% below the ACE - Budget in 2025 (cell...

AI summary The document contains several requests for clarification and explanation regarding financial and operational variances in 2025 and 2026, including capital spending, GHG compliance costs, power forecasts, and affiliate transactions. These requests are tied to specific tabs and cells in the referenced documents.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →