90070CA (NSPI) IR-1 to IR-10 1 passage
Section 5
. 77, lines 18-19. 41 1 Itron, Cold Climate Heat Pump Load Study (July 2022), pp. 17-18. Submitted as Appendix A to NS Power, On-Bill Financing Final Report, M09321 (July 21, 2022).

AI summary A 2022 Itron study on cold climate heat pump load performance was submitted as Appendix A to NS Power's On-Bill Financing Final Report (M09321). The study informs NS Power's analysis of financing mechanisms for heat pump adoption in Nova Scotia.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →