N-2IRP Action Plan Report Update
1 passage
Attachment 2 NS Power Responses to Stakeholder Comments Theme Stakeholder Comment NS Power Response (2) expected levels of overall wind curtailment associated with both the Nova Scotia Rate Base Procurement and any other new wind that may...
AI summary NS Power responds to stakeholder comments regarding wind curtailment levels and modeling assumptions for coal unit conversions and combustion turbines. NS Power mentions that interconnection costs will be included and that variable renewable generation curtailment will be determined by the evergreen Plexos modeling. Modeling assumptions for coal unit conversions and combustion turbines will be included in the draft assumptions and updated only if significant changes are observed.
N-3IRP Action Plan Update
1 passage
Incremental Annual Load Growth from Building Electrification Incremental Non-Coincident Building Peak Demand Forecast The Stock Rollover charts at left demonstrate the breakdown of heating sources by building electrification scenario. The...
AI summary The document analyzes load growth and peak demand impacts under different building electrification scenarios. High-performance heat pumps in the best-in-class scenario reduce annual load growth, while dual-fuel scenarios use backup fuel during cold periods to mitigate peak load increases.
Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →