15 Action Plan Item 1b: Regional Integration
p. p. 13
into the estimation of avoided costs of T&D. E1 expects these avoided costs to grow - with increased level of system build-out anticipated as part of increased load growth in coming - years. - Action Plan Item 4b: Hybrid Peak Mitigation Sc...
AI summary NS Power and E1 collaborate on initiatives including hybrid peak mitigation, wind integration studies, renewable cost tracking, and electrification forecasts. E1 emphasizes non-technical factors, demand response, and updating load forecasts. Both parties agree on monitoring solar, storage costs, and IRP evolution.