2. METHODOLOGY
p. p. 12
2. METHODOLOGY CBCL understands that NS Power would like to use a 30/60/90/IFC design framework. CBCL feels this project is small enough to eliminate at least one milestone gate to save time and cost, however we are open to adhering to the...
AI summary CBCL proposes modifying NS Power's 30/60/90/IFC design framework by eliminating a milestone gate to reduce time and costs, while suggesting a site visit for better terrain assessment. A kick-off meeting is planned post-authorization to align stakeholders.