Preamble p. pp. 7-12
10 In the course of the Company's discussions with REI on other RtR initiatives, including the RtR 11 Market Elements Application (M13008), monthly pricing structures, true-up mechanisms, and the 12 enablement of interruptible service in t...

AI summary The Company and Renewall Energy Inc. (REI) discussed various Real-Time (RtR) initiatives, including market elements, monthly pricing, true-up mechanisms, and interruptible services. While the potential application of Time-of-Use Pricing (TVP) structures to the Electricity Bulk Supply (EBS) Tariff was considered, both parties concluded that the current EBS framework is sufficient for the initial implementation of the RtR market. Customer participation is not anticipated until late 2026, meaning data on usage patterns and cost causation will be unavailable in the near term.

9 p. p. 12
9 - 10 The modeling assumptions used in the PLEXOS model for the 2027 AARs are summarized in - 11 Partially Confidential Appendix A3, Confidential Appendices A4, and A5.

AI summary The text references the modeling assumptions utilized in the PLEXOS model for determining the 2027 Anchor Anchor Rates (AARs). It directs the reader to specific confidential appendices (A3, A4, and A5) for the full summary of these assumptions.

2.2 Board Directed Sensitivity Analyses p. p. 12
2.2 Board Directed Sensitivity Analyses 1415 In accordance with the Board's prior AAR directives, NS Power has considered the following sensitivities on the marginal cost: 1617 18 (1) Forward commodity market returns volatility of plus 1.5...

AI summary NS Power has conducted sensitivity analyses on marginal costs in response to the Board's Anchor Anchor Rate (AAR) directives. Specifically, the analysis evaluates the impact of forward commodity market returns volatility, applying a plus 1.5 standard deviation (+1.5 σ) scenario to various fuel prices, including AECO, AGT, HFO, API2, and Mass Hub (Off-Peak and 20 On-Peak). The analysis utilizes the 2027 PLEXOS AAR F&PP model, updated with system assumptions and commodity pricing as of September 17, 2026.

2027 Annually Adjusted Rates Application REDACTED p. p. 30
2027 Annually Adjusted Rates Application REDACTED 1 As discussed in Section 7.1, the RtR market remains in the early stages of implementation and 2 operational experience with the DAS framework does not yet exist. Accordingly, the proposed...

AI summary Nova Scotia Power is proposing an Administration Charge for the Distribution-connected Aggregation Service (DAS) framework as part of the 2027 Annually Adjusted Rates Application. Because the RtR market and DAS framework are in early implementation stages with no existing operational experience, the Company developed a modest, forecast-based charge. The estimate assumes up to 100 metering points will be enrolled, requiring approximately three hours of staff time per month for administration, settlement, and troubleshooting.

Modelling Assumptions used in PLEXOS p. p. 37
Modelling Assumptions used in PLEXOS The PLEXOS model used for the 2027 Annually Adjusted Rates forecast is based on the 2026 Q3 fuel and purchased power forecast model.

AI summary The document specifies the modelling assumptions for the PLEXOS model used to forecast the 2027 Annually Adjusted Rates (AAR). It notes that the model is derived from the 2026 Q3 fuel and purchased power forecast model.

A high-level list of updates for the 2026 Q3 fuel and purchased power model include: p. p. 37
A high-level list of updates for the 2026 Q3 fuel and purchased power model include: Update Update Description number 1. Generation maintenance scheduled (GMS). 2. Fuel and power prices. 3. Coal blends, restrictions, emissions parameters,...

AI summary The document outlines high-level updates for the 2026 Q3 fuel and purchased power model. Key updates include generation maintenance scheduling, fuel and power pricing, coal blend parameters, and updated SO2 emission limits. It also notes specific load and energy schedule changes for Port Hawkesbury Paper, Maritime Link (ML) surplus and re-delivery energy, and New Brunswick (NB) market energy. Additionally, the 2027 AAR Appendix A4 has been filed.

Sensitivity 1: Prices Adjusted Upwards (+1.5 σ) p. p. 37
Sensitivity 1: Prices Adjusted Upwards (+1.5 σ) System Marginal Cost ($/MWh) 2027 Peak Off-peak All periods Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year 73.67 REDACTED 2027 AAR Appendix A6 Page 2 of 5 REDACTED (CONFIDENTIAL INFORMA...

AI summary The document presents sensitivity analyses for the 2027 Annual Adjustment Rate (AAR) regarding system marginal costs. It details three specific scenarios: Sensitivity 1 (Prices Adjusted Upwards +1.5 σ) showing a yearly cost of $73.67/MWh, Sensitivity 2 (Prices Adjusted Downwards -1.5 σ) showing a yearly cost of $54.38/MWh, and Sensitivity 3 (Prices Half Surplus On Peak) showing a yearly cost of $64.86/MWh.

Sensitivity 4: Wind Delay 1 month p. p. 37
Sensitivity 4: Wind Delay 1 month System Marginal Cost ($/MWh) 2027 Peak Off-peak All periods Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year 71.29 REDACTED 2027 AAR Appendix A6 Page 5 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED)

AI summary The document presents a sensitivity analysis regarding a one-month delay in wind energy availability. It provides a table of system marginal costs ($/MWh) for the year 2027, broken down by month and period (Peak, Off-peak, and All periods). The average system marginal cost for all periods in 2027 under this sensitivity scenario is $71.29/MWh.

FOR THE YEAR ENDING DECEMBER 31, 2027 p. p. 37
FOR THE YEAR ENDING DECEMBER 31, 2027 (1) MWH SALES (2) ENERGY LINE (3) ENERGY LOSSES REQUIREMENT (4) CLASS NON- DMD. (KW) (5) SYSTEM COINCIDENT COINCIDENT COINCIDENT FACTOR (6) SYSTEM DMD. (KW) (7) LINE (8) DEMAND SYSTEM (9) SYSTEM COIN....

AI summary The document provides a detailed load disaggregation table for the year ending December 31, 2027, as part of the 2027 Annual Adjustment Rate (AAR) proceeding. It outlines MWh sales, energy line requirements, energy losses, and coincident peak factors across various customer classes, including Domestic, Small General, General, Large Industrial, and Municipal. It also provides specific breakdowns for transmission and distribution for customers over 2 MVA, including components for the Port Hawkesbury Paper (PHPCBL) facility and other industrial entities.

REDACTED 2027 AAR Appendix E3 Page 7 of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 37
REDACTED 2027 AAR Appendix E3 Page 7 of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Total $4,872,867 $4,525,474 $4,474,415 $4,646,192 $4,401,021 $4,174,893 $4,042,371 $4,377,111 $4,461,152 $4,537,700 $4,796,904 $5,059,546 $54,369,645 NRI...

AI summary The document provides a detailed financial and usage data table for the 2027 Annual Adjustment Rate (AAR) proceeding. It outlines total costs, specific costs associated with the Nova Scotia Renewable Independent System (NRIS) and Energy Resource Independent System (ERIS), and electricity usage data (kWh requirements) categorized by Annual Total Load (ATL) classes, including Domestic, Small General, and Large General categories over a multi-year period.

REDACTED 2027 AAR Appendix E3 Page 8 of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 37
REDACTED 2027 AAR Appendix E3 Page 8 of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) $ 80.80 Total Wind Demand 0% PHP wind forecast Goose Harbour Lake GWh 27-Jan 27-Feb 27-Mar 27-Apr 27-May 27-Jun 27-Jul 27-Aug 27-Sep 27-Oct 27-Nov 27-Dec...

AI summary The document provides a detailed monthly production and sales forecast for the Power Heating Plan (PHP) and Goose Harbour Lake for the year 2027. It includes specific data on energy requirements, sales, line losses, and net production for both ATL (Annual Total Load) and BTL (Behind the Meter Load) categories. Additionally, it tracks fuel costs at $80.80 per MWh, calculates spill volumes at the meter, and provides 3rd Consecutive Peak (3CP) load figures before wind generation.

DETERMINATION OF MONTHLY STANDBY CONTRACT DEMAND p. p. 37
DETERMINATION OF MONTHLY STANDBY CONTRACT DEMAND Monthly Standby Contract Demand (MSCD) in kW is determined using the following formula: MSCD = LWPFD - min (LWPFD, (\sum_{ii=1}^{nn} CCi \ GCi)/(1+PR))

AI summary The document provides the specific formula used to determine the Monthly Standby Contract Demand (MSCD) in kilowatts (kW). The calculation is based on the Lowest Winter Peak Forecast Demand (LWPFD), adjusted by the minimum of the LWPFD or a weighted sum of Contract Capacity (CCi) and Growth Coefficients (GCi), factored by a Peak Reduction (PR) variable.

DETERMINATION OF MONTHLY STANDBY CONTRACT DEMAND p. p. 37
DETERMINATION OF MONTHLY STANDBY CONTRACT DEMAND Monthly Standby Contract Demand (MSCD) in kW is determined using the following formula: MSCD = LWPFD - min (LWPFD, (\sum_{i=1}^{nn} CCi \ GCi)/(1+PR))

AI summary The document defines the formula for calculating Monthly Standby Contract Demand (MSCD) in kilowatts (kW). The calculation determines MSCD by taking the Load Weighted Planning Factor Demand (LWPFD) and subtracting the lesser of the LWPFD or the total Generating Capacity (GCi) adjusted by the Customer Capacity Factor (CCi) and the Planning Reserve (PR).

Where: p. p. 37
Where: "LWPFD" is LRS Winter Peak Firm Demand in respect of each billing month calculated as follows: 2027 AAR Appendix G8 (redline) Page 3 of 5 Page 3 of 5

AI summary The document fragment provides a technical definition for 'LWPFD', which represents the Load Weighted Planning Factor Demand. It specifies that this metric corresponds to the Licensed Retail Suppliers (LRS) Winter Peak Firm Demand for each billing month. The text serves as a methodology note within the 2027 Annual Adjustment Rate (AAR) Appendix G8.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →