Topic:"Fuel Cost Adjustment" in M03672

Matter: E-BER-R-10 - Berwick Electric Light Commission - Interim Application to offer rates to commercial  customers that will incent peak demand reductionIN THE MATTER OF THE APPLICATION by the TOWN OF BERWICK, on behalf of its ELECTRIC COMMISSION, for approval of an amendment to its Schedule of Rates for Electric Supply and Services.
11 passages 3 documents

Fuel Cost Adjustment across all matters →

B-2-(a)Town of Berwick Financial Statements - March 31, 2010 1 passage
12. Cash - General Capital Reserve
12. Cash - General Capital Reserve $266,214 (2009 - $208,438) of the cash balance held in the general capital reserve fund relates to monies received from the Canada-Nova Scotia Federal Fuel Tax program and must be expended within the guid...

AI summary The general capital reserve fund has a cash balance of $266,214, with $208,438 from the Canada-Nova Scotia Federal Fuel Tax program, which must be spent according to the program's guidelines.

05848Board Order 5 passages
SCHEDULE OF RATES FOR ELECTRIC SUPPLY & SERVICES p. p. 3
t and yard lighting the energy portion of such charges shall be as represented in NSPl's current Rates and Regulations, and where no monthly kWh value is available, upon the calculated monthly energy. Where the Nova Scotia Power Incorporat...

AI summary The document outlines the application of the Fuel Adjustment Mechanism (FAM) and Demand-Side Management (DSM) Rider to the rates for energy services provided by the Berwick Electric Commission (BEC). It specifies how the FAM adjustment is calculated and applied to all rate classes, including street and yard lighting, based on projected energy sales and purchases.

INDUSTRIAL p. p. 3
INDUSTRIAL Demand Charge: $11.60 per month per kilovolt ampere of maximum demand. Energy Charge: $0.0653 per kilowatt-hour for all consumption. DSM Rider: $0.00242 per kilowatt-hour for all consumption. 2010 FAM adjustment: -$0.00181 per k...

AI summary The text outlines industrial rate charges, including demand charge, energy charge, DSM rider, and a 2010 FAM adjustment, providing specific monetary values per kilowatt-hour and per kilovolt ampere of maximum demand.

STREET LIGHTING p. p. 3
STREET LIGHTING DSM Rider: $0.00242 per kilowatt-hour for all consumption. 2010 FAM adjustment: -$0.00181 per kilowatt-hour for all consumption. (Lamps burning 4,000 hours per year, lighting system supplied and maintained by the Commission...

AI summary The text outlines a DSM Rider and a 2010 FAM adjustment, both related to street lighting. The rider applies a charge of $0.00242 per kilowatt-hour, while the FAM adjustment reduces the rate by $0.00181 per kilowatt-hour. The lighting system is described as being supplied and maintained by the Commission.

Section 23 p. p. 3
DSM Rider: $0.00242 per kilowatt-hour for all consumption. 2010 FAM adjustment: -$0.00181 per kilowatt-hour for all consumption. (Lamps burning 4,000 hours per year, lighting system supplied and maintained by the Comrnission, consisting of...

AI summary The document outlines a DSM Rider charge of $0.00242 per kilowatt-hour and a 2010 FAM adjustment of -$0.00181 per kilowatt-hour. It also describes a lighting system installed by the Commission using existing infrastructure.

Section 25 p. p. 3
(Applicable to street lighting, sign lighting and similar unmetered loads where demand, time of use and energy consumption are known, and the Commission supplies power and energy only.) Demand Charge: $13.92 per month per kilowatt. Energy...

AI summary The document outlines specific rates for demand charge, energy charge, and a DSM rider, as well as a 2010 FAM adjustment. These rates apply to unmetered loads such as street lighting and sign lighting, where demand, time of use, and energy consumption are known.

05848Board Order 5 passages
SCHEDULE OF RATES FOR ELECTRIC SUPPLY & SERVICES p. p. 3
t and yard lighting the energy portion of such charges shall be as represented in NSPl's current Rates and Regulations, and where no monthly kWh value is available, upon the calculated monthly energy. Where the Nova Scotia Power Incorporat...

AI summary This document outlines the Fuel Adjustment Mechanism (FAM) and its application to energy purchased by the Berwick Electric Commission (BEC) from Nova Scotia Power Incorporated (NSPI). The FAM adjustment is distributed across all BEC customers through kilowatt-hour rates, with specific calculations provided for determining the adjustment amount.

INDUSTRIAL p. p. 3
INDUSTRIAL Demand Charge: $11.60 per month per kilovolt ampere of maximum demand. Energy Charge: $0.0653 per kilowatt-hour for all consumption. DSM Rider: $0.00242 per kilowatt-hour for all consumption. 2010 FAM adjustment: -$0.00181 per k...

AI summary The text outlines the industrial rate structure, including demand charge, energy charge, DSM rider, and a 2010 FAM adjustment, providing a breakdown of costs per kilowatt-hour and per kilovolt ampere of maximum demand.

STREET LIGHTING p. p. 3
STREET LIGHTING DSM Rider: $0.00242 per kilowatt-hour for all consumption. 2010 FAM adjustment: -$0.00181 per kilowatt-hour for all consumption. (Lamps burning 4,000 hours per year, lighting system supplied and maintained by the Commission...

AI summary The text outlines a DSM Rider and a 2010 FAM adjustment, both applied per kilowatt-hour of consumption. It describes the street lighting system, which includes lamps burning 4,000 hours annually and is supplied and maintained by the Commission.

Section 23 p. p. 3
DSM Rider: $0.00242 per kilowatt-hour for all consumption. 2010 FAM adjustment: -$0.00181 per kilowatt-hour for all consumption. (Lamps burning 4,000 hours per year, lighting system supplied and maintained by the Comrnission, consisting of...

AI summary The text outlines a DSM Rider and a 2010 FAM adjustment, specifying monetary values per kilowatt-hour. It also describes a lighting system managed by the Commission, including technical details about lamps and installation.

Section 25 p. p. 3
(Applicable to street lighting, sign lighting and similar unmetered loads where demand, time of use and energy consumption are known, and the Commission supplies power and energy only.) Demand Charge: $13.92 per month per kilowatt. Energy...

AI summary The document outlines specific charges for electricity, including demand charge, energy charge, and a DSM rider, along with a 2010 FAM adjustment. These rates apply to unmetered loads such as street and sign lighting.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →