Topic/Matter Intersection

Topic:"Fuel Cost Adjustment" in M06319

Matter: P-886 Nova Scotia Power Inc. (NSPI) Rate Application 2007
733 passages 89 documents

Fuel Cost Adjustment across all matters →

N-1-aNotice of Application and Direct Evidence - NSPI - REDACTED (Large File - 59 MB) 40 passages
Preamble
Appendix C – Operating Maintenance and General Expense 5 Year Forecast Appendix D – Credit Rating Reports Appendix E - Dr. Roger A. Morin Exhibits Appendix F – Load Forecast Report Appendix G - Cost of Service Study Appendix H - Proposed T...

AI summary The document outlines various appendices related to a regulatory proceeding, including operating maintenance forecasts, credit rating reports, load forecasts, cost of service studies, proposed tariffs, and regulation changes.

1.0 INTRODUCTION
1.0 INTRODUCTION 2 3 4 1 Nova Scotia Power Inc. (NSPI) is applying for new electricity rates based on a test year beginning January 1, 2007. Two key factors bring about this request: 5 1. High fuel prices and increased volumes; 7 6 2. The...

AI summary Nova Scotia Power Inc. (NSPI) is requesting new electricity rates due to increased fuel prices and the need to recover previously approved expenses. NSPI emphasizes the impact of volatile fuel costs on its financial health and the importance of recovering these costs to maintain stability and credit ratings.

1.1 Fuel Expense Continues To Increase In 2007
1.1 Fuel Expense Continues To Increase In 2007 7 8 9 NSPI uses a combination of fuels to generate electricity. The fuel mix depends on global commodity prices within an overall framework that limits environmental emissions. 10 11 12 13 14...

AI summary NSPI faces increased fuel costs in 2007 due to global market conditions, which are not currently reflected in its rates. The fuel forecast for 2007 is $498.7 million, $68.5 million higher than the current rate provision. NSPI manages fuel costs while complying with the 2006 Rate Decision directives from the Board.

1.6 Requested Adjustment To Rates
1.6 Requested Adjustment To Rates 3 4 5 1 2 NSPI' s revenue requirement in 2007 is $1 ,197.6 million, which reflects increased fuel costs and the recovery of previously approved but deferred tax and depreciation costs. Based on current rat...

AI summary NSPI is requesting a 7.5% average revenue increase for 2007 due to increased fuel costs, deferred tax and depreciation recovery, and other expenses. They seek UARB approval for new rates effective April 1, 2007, and a true-up for the ELIIR-2 real time pricing mechanism.

Increased Commodity Costs
Increased Commodity Costs Higher prices for oil, natural gas and solid fuels make up the majority of the increased commodity costs in the commodity pricing category. Heavy fuel oil (HFO) prices are the most significant contributor to this...

AI summary The document discusses increased commodity costs, primarily driven by higher oil, natural gas, and solid fuel prices, with heavy fuel oil being the most significant contributor. NSPI's 2007 solid fuels costs are higher due to the expiration of a 2006 coal disallowance and changes in fuel mix and pricing.

Net Load Increase
Net Load Increase In 2007, load is forecast to be 1 percent higher than in 2006C. The increased load results in a greater reliance on higher cost fuels such as oil and natural gas. This additional load adds $19.6 million to NSPI's overall...

AI summary In 2007, a 1 percent increase in load compared to 2006C leads to higher reliance on expensive fuels like oil and natural gas, adding $19.6 million to NSPI's fuel costs.

Other
Other Offsetting this benefit are changes in generation equipment capacity and maintenance schedules, reduced hydro4 as well as other miscellaneous variances. These are forecasted to increase fuel expenses by $2.4 million in 2007. The leve...

AI summary The text discusses factors affecting fuel expenses in 2007, including changes in generation equipment capacity, maintenance schedules, and reduced hydro generation. These factors are forecasted to increase fuel expenses by $2.4 million, with a 15% increase in fuel cost per megawatt hour compared to 2006C.

22 2.2 Responding to the UARB
22 2.2 Responding to the UARB NSPI has worked diligently to be responsive to the Board's fuel directives. The Company has listened to the Board and its customers and is addressing the issues brought forth in recent Rate Decisions. On March...

AI summary NSPI has been working to comply with the UARB's fuel directives, improving its fuel procurement strategy and addressing recommendations from the 2006 Rate Decision. The company has made significant progress, including updating its fuel portfolio strategy and initiating an Integrated Resource Planning process to meet emissions control requirements.

Organization and Procedures
Organization and Procedures ii. NSPI should develop a more comprehensive set of fuel hedging policies and procedures that measure up to industry standards. 9 NSPI has liaised with Liberty in regard to the recommendation to develop a more c...

AI summary NSPI is being urged to develop more comprehensive fuel hedging policies and improve its internal fuel procurement models to align with industry standards. NSPI is working with Black & Veatch and Liberty to refine procedures, documentation, and decision-making processes related to fuel procurement and purchased power.

Fuel Supply Portfolio
Fuel Supply Portfolio Vll. continue to build the fuel supply portfolio so that the parameters currently set forth by NSPI in its Fuel Procurement Policies and Procedures are achieved by December 31 , 2007. 12 NSPI continues to build its po...

AI summary NSPI is working to build its fuel supply portfolio by December 31, 2007, in accordance with its Fuel Procurement Policies and Procedures. It has several multi-year contracts in place and is progressing toward meeting the target percentage of contracted solid fuel.

1 2.3 Energy Ventures Analysis Testimony
1 2.3 Energy Ventures Analysis Testimony 2 5 11 21 24 3 Energy Ventures Analysis, Inc. (EVA) has been engaged by Nova Scotia Power, 4 Inc. (NSPI) to provide testimony in its 2007 Rate Application (2007 Application). 6 The 2007 Rate Applica...

AI summary Nova Scotia Power Inc. (NSPI) is seeking a rate increase due to rising solid fuel costs, particularly from higher HFO costs and decreased gas resale margins. Energy Ventures Analysis, Inc. (EVA) provides testimony on fuel market trends, procurement practices, and the impact of credit ratings on fuel expenses. The example of Tennessee Valley Authority (TVA) is cited to illustrate similar challenges faced by other utilities.

PETROLEUM COKE PRICES (USD/Tonne) January 1992 - August 2006
PETROLEUM COKE PRICES (USD/Tonne) January 1992 - August 2006 The price spike in late September 2005 was caused by Hurricanes Katrina and Rita shutting down Gulf coast pet coke supplies. The decline in prices in 2001 and 2003 was due to sig...

AI summary The text discusses the historical price trends of petroleum coke from 1992 to 2006, highlighting the impact of hurricanes and new production capacity on prices. It notes that traders now tie pet coke prices to indices due to recent volatility and mentions political risks from Venezuela's production.

7 2.3.2 Fuel Price Volatility
7 2.3.2 Fuel Price Volatility 8 9 10 11 12 13 14 15 16 As expected, fuel price volatility continued into 2006. What was unexpected, however, was the magnitude of the price increases. Oil, natural gas, and petroleum coke all reached new hig...

AI summary Fuel price volatility continued into 2006 with significant increases in oil, natural gas, and petroleum coke prices. Factors contributing to these increases include rising demand from countries like China and India, geopolitical unrest, and the impact of the 2005 hurricane season on production capacity in the Gulf of Mexico. Prices have since softened but remain above historic levels.

INTERNATIONAL COAL PRICES ($/Tonne ARA) January 2000 - August 2006
INTERNATIONAL COAL PRICES ($/Tonne ARA) January 2000 - August 2006 The short-term outlook for international coal prices is uncertain. The dip in the market during the fourth quarter of 2005 is believed to be tied to increased supply. The r...

AI summary International coal prices have been volatile, influenced by factors such as supply increases, European weather, and demand forecasts, particularly from China. NSPI has adopted a portfolio procurement strategy to minimize fuel price volatility for consumers.

9 2.3.3 Utility Fuel Procurement Practices
9 2.3.3 Utility Fuel Procurement Practices 10 11 EVA has conducted over 30 fuel procurement audits on behalf of regulators 12 and/ or consumer advocates, including two audits conducted in the last 12 13 months. On behalf of the Public Util...

AI summary The document discusses utility fuel procurement practices, noting that EVA has conducted numerous audits on behalf of regulators and consumer advocates. It highlights the industry standard of using a portfolio strategy with a mix of short, medium, and long-term contracts to balance risk and ensure supply security.

10 2.3.4 International Coal Expertise
10 2.3.4 International Coal Expertise 11 12 NSPI was directed to seek an international coal expert as part of its 13 procurement team. In response, NSPI engaged the services of the premier 14 executive recruiter within the coal industry to...

AI summary NSPI sought an international coal expert for its procurement team but faced challenges including Nova Scotia's remote location, the small size of the coal portfolio, regulatory constraints, and a limited candidate pool. Despite these challenges, NSPI has been developing internal capabilities and the Manager of Solid Fuels has gained sufficient experience to handle international coal procurement.

18 2.3.5 Effect of Credit Rating on Fuel Purchase Expense
18 2.3.5 Effect of Credit Rating on Fuel Purchase Expense 20 In recent history, there have been insolvencies of both buyers and sellers that 21 have made the creditworthiness of counter-parties more important. Buyers 22 and sellers are con...

AI summary The text discusses how credit ratings influence fuel purchase expenses, particularly in the context of executory contracts and the potential for counter-party insolvency. Provisions in agreements may require credit enhancements if a counter-party's credit rating declines, which can increase procurement costs for utilities like NSPI.

15 2.3.6 Conclusions
15 2.3.6 Conclusions 16 17 18 19 • Volatility and high prices continue to characterize the fuel markets in which NSPI participates. As a result, fuel costs have trended upward and forecasts are more difficult to make. 20 21 22 23 24 25 26...

AI summary NSPI's fuel procurement practices are consistent with industry standards, using a portfolio approach to limit exposure and optimize costs. Fuel markets remain volatile, making forecasting difficult. NSPI's credit rating and that of its parent influence fuel procurement terms.

1 2.4 Fuel Testimony of NSPI
1 2.4 Fuel Testimony of NSPI 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 21 22 23 24 25 26 27 28 29 Like all utilities and customers, NSPI is experiencing the effects of world market forces on its fuel costs. In 2007, NSPI is facing an i...

AI summary NSPI is experiencing increased fuel costs in 2007, which impact its financial health and the reliability of the electricity system. The company adopts evidence from Energy Ventures Analysis and outlines its fuel procurement strategy, mix of generating capacity, and fuel forecast methodology, including topics such as oil and gas, solid fuel, renewable energy, and load growth effects.

20 2.4.1 NSPI's Fuel Procurement Strategy
20 2.4.1 NSPI's Fuel Procurement Strategy NSPI has 2,283 megawatts (MW) of generating capacity. Coal-fired capacity makes up 54 percent; oil and natural gas fired facilities comprise another 29 percent while hydro, tidal and wind provide t...

AI summary NSPI has a diverse generating capacity, with coal-fired plants contributing the largest share. International fuel prices, particularly for oil and natural gas, have been highly volatile, impacting NSPI's fuel budget. Solid fuel prices, including coal and pet coke, have remained elevated despite some stabilization in recent months.

Fuel Portfolio
Fuel Portfolio In support of the Board directive to develop a more comprehensive hedging program NSPI has undertaken a review of the objectives and goals of its fuel portfolio. The initial review has resulted in the restatement of the over...

AI summary NSPI has undertaken a review of its fuel portfolio in response to a Board directive to develop a more comprehensive hedging program, resulting in the restatement of its overall policy and goals for fuel management.

Oil and Natural Gas
Oil and Natural Gas NSPI bums HFO and/or natural gas at Tufts Cove. Tufts Cove Units 1, 2 and 3 are capable of burning both fuels while Units 4 and 537bum only natural gas. The volume of HFO required in any year varies depending on two mai...

AI summary NSPI burns HFO and natural gas at Tufts Cove, with HFO use influenced by customer demand and fuel prices. Natural gas has become more economical due to recent HFO price increases, though this could reverse if HFO prices drop. NSPI uses a combination of physical purchases and financial hedging for HFO, with contracts tied to market indices.

Natural Gas
Natural Gas 1 2 3 4 NSPI buys natural gas under - agreement with an existing supplier. Deliveries commenced on November 1, 2000. The contract represents 61 ,600 MMBtu per day of natural gas deliveries to NSPI. 5 6 7 8 9 10 11 On November 1...

AI summary NSPI has a long-term natural gas contract with a supplier, which was amended in 2005. NSPI plans to optimize the value of this contract by selling excess gas through a competitive RFP process managed by Brant Energy. The winning bid was submitted by Emera Energy Services, offering the highest competitive value and minimizing replacement costs.

Solid Fuel
Solid Fuel NSPI's solid fuel procurement policy is to procure and manage a reliable and reasonably priced supply of fuel on a system-wide evaluated cost basis for its generation fleet, which is consistent with regulatory and environmental...

AI summary NSPI's solid fuel procurement policy focuses on securing a reliable and reasonably priced supply of fuel for its generation fleet, aligning with regulatory and environmental standards. The company is on track to meet its 2007 contract commitments and has a portfolio approach to procurement, with forecasted requirements covered by long-term and medium-term contracts.

1 Long-Term Contracts 2 3 NSPI engages in long-term commitments for coals and pet coke that the Company will 4 consume for four years or more. 5 6 NSPI commitments for solid fuel as follows: 7 8 9 10 - 11 12 13 14 15 16 17 18 19 20 21 Medi...

AI summary The text outlines NSPI's engagement in long-term and medium-term contracts for solid fuels such as coal and pet coke, which are intended for consumption over a period of four years or more. The section on short-term contracts is mentioned but not elaborated upon.

Test Burn Program
Test Burn Program NSPI maximizes competition among suppliers by qualifying multiple sources of supply. The test burn program allows NSPI to assess the potential for new fuel sources to be used in a specific plant or across the fleet of gen...

AI summary NSPI uses a test burn program to evaluate potential new fuel sources for use in its generators. The program helps assess the suitability and economic viability of new fuels, with results informing future purchase decisions.

27 2.4.2 Fuels Forecast
27 2.4.2 Fuels Forecast 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 28 29 30 Fuel costs include the cost of solid fuels, oil, natural gas and purchased power, offset by the net proceeds from export energy sales and...

AI summary The document discusses NSPI's 2007 fuel forecast, including an increase in net electricity demand and associated fuel costs. It notes that 90% of NSPI's generation will come from fossil fuels and mentions compliance with an annual sulphur dioxide emission cap. The recent credit downgrade by S&P is not factored into 2007 costs, but may impact long-term fuel procurement.

Oil & Natural Gas Methodology
Oil & Natural Gas Methodology Figure 2.6 shows the 2007 over-the-counter41prices for oil and forwards for natural gas adjusted for delivery to Tufts Cove. As shown, the spread between natural gas and HFO is relatively narrow during summer...

AI summary The document discusses NSPI's methodology for forecasting oil and natural gas prices, including the use of over-the-counter quotes, forward price curves, and hedging strategies. It also notes the Board's approval of this approach, as used in the 2003 Generic Rate Case, and highlights how natural gas prices compare to HFO prices seasonally.

Natural Gas Forecast
Natural Gas Forecast With the price of HFO in a similar range to that of natural gas, the economics of burning natural gas during some of the summer months in Units 1, 2 and 3 at Tufts Cove is expected to be favourable. Gas is anticipated...

AI summary The document discusses the economic dispatch of natural gas at Tufts Cove units, noting that gas prices are favorable compared to HFO, and anticipates a reduction in fuel costs for NSPI in 2007. It also references supply reductions in 2006 due to curtailments from the Sable Offshore Energy Project.

Solid Fuels Forecast Methodology
Solid Fuels Forecast Methodology In developing the solid fuel budget in this Application, solid fuels under contract were priced at contract levels while the uncommitted volumes were priced using market information and published forecasts....

AI summary NSPI developed a consensus-based solid fuel budget methodology, using contract prices for committed volumes and market information for uncommitted volumes. This approach avoids reliance on a single forecast and accounts for market uncertainty, as emphasized in the 2006 Rate Hearing.

Mix of Solid Fuel Blends for Generation
Mix of Solid Fuel Blends for Generation 2006C 2007 Import Coal LS MS HS Pet coke Domestic 100% 100% The fuel mix outlined in the 2007 Application is such that all solid fuels will be imported except for some coal supplied domestically. Dom...

AI summary The document discusses the fuel mix for solid fuel blends used in generation, highlighting that all solid fuels will be imported except for some domestically supplied coal. Domestic coal accounts for a portion of NSPI's solid fuel requirements on a tonnage basis.

US Dollar Requirements and Exchange Rates
US Dollar Requirements and Exchange Rates Most of NSPI's fuel requirement is purchased in U.S. dollars. The imported coal, petroleum coke, heavy fuel oil, natural gas and ocean freight are U.S. dollar denominated. The natural gas sales pro...

AI summary NSPI's fuel requirements are largely denominated in U.S. dollars, with natural gas sales providing a hedge against currency exchange risks. Exchange rates have improved since 2006, but increased fuel costs in 2007 have raised USD requirements. NSPI hedges 30-60% of its USD needs over a four-year horizon, using forward contracts and monitoring market conditions to manage risk.

Effect of Load Growth on Cost of Generation
Effect of Load Growth on Cost of Generation As described in previous sections, the increase in fuel expenses for 2007 is primarily a function of changes in the price and mix of commodities to be used by NSPI. Load growth is a secondary fac...

AI summary The text discusses how load growth in 2007 affected NSPI's fuel expenses, noting that higher energy demand within the province reduced exports and that marginal loads were served by higher-cost fuels like HFO, natural gas, and LFO, along with IPPs and imports.

NSPI's Ratings
NSPI's Ratings In recent years, NSPI has been under increasing credit rating pressure from two of the three agencies that rate NSPI' s debt: S&P and Moody's. In 2005 both changed the outlook on NSPI's ratings from "stable" to "negative". 6...

AI summary NSPI has faced credit rating pressure from S&P and Moody's due to under-recovery of fuel costs and delayed tax expense recovery. A downgrade is likely unless there is significant improvement in NSPI's credit metrics or reduced risk exposure to fossil fuel costs. NSPI's ratings are lower compared to other Canadian electric utilities, partly due to the lack of a fuel adjustment mechanism.

Business Risk
Business Risk To the extent that budgeted forecasts are made prior to regulatory determination of its rates, NSPI's principal source of business risk is forecasting risk. Potential deviations from expected profitability can occur due to un...

AI summary NSPI faces significant business risks due to forecasting inaccuracies, economic cycles, weather variability, and competition from alternative energy sources. These factors contribute to volatility in revenue and operating income, particularly due to high fixed costs and exposure to coal price fluctuations.

1.2 Regulatory Risk
1.2 Regulatory Risk 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 An important component of risk for utilities is "regulatory risk". On these grounds, regulatory treatment by the Board has been perceived...

AI summary The text discusses regulatory risk for Nova Scotia Power Inc. (NSPI), emphasizing the absence of a fuel adjustment clause (FAC) and its impact on credit ratings, cost of capital, and customer rates. It highlights how regulatory lag and the lack of a FAC make NSPI's financial situation more vulnerable compared to other utilities.

8.3 Direct Expenses Associated with BMPC's "Additional Energy"
8.3 Direct Expenses Associated with BMPC's "Additional Energy" In the process of determining the appropriate costs of serving each rate class, the COSS assigns direct expenses associated with serving BTL classes. One of the BTL classes is...

AI summary The document discusses the correction of direct expenses for BMPC's 'Additional Energy' portion of their load, shifting from a marginal cost basis to the Interruptible Rider cost basis, which reduced fuel costs by $5.2 million. This change aligns with the UARB's 2004 ruling allowing BMPC to choose the Interruptible Rider rate.

12 11.2 Ql Fuel Deferral
12 11.2 Ql Fuel Deferral 1 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 In this Application, NSPI seeks new rates effective April 1, 2007. With a filing in early October, 2006 the hearing processes will no...

AI summary NSPI seeks to defer the increased 2007 fuel expenses for the first quarter of 2007, estimating the cost at $18.3 million. The deferral would allow recovery of these costs over a twelve-month period starting in 2008, ensuring NSPI can maintain its allowed return. Failure to recover these costs could have a significant financial impact on the company.

15 11.3 2P-RTP Deferral
15 11.3 2P-RTP Deferral 16 17 18 19 20 21 22 23 The UARB Decision in the ELIIR-2 proceeding (P-883) offers the option of a new Two Part Real Time Pricing rate (2P-RTP) to customers in the ELIIR-2 customer class. A key issue in the proceedi...

AI summary The UARB Decision in the ELIIR-2 proceeding introduced a 2P-RTP rate with limitations to ensure cost neutrality. NSPI requests a true-up of unrecovered fuel expenses due to potential mismatches between credits/debits and actual fuel costs, ensuring NSPI can achieve its allowed return.

Section 276
31 In this proceeding, the UARB will determine the increase in NSPI's revenue requirement for the 2007 test year. Volatile fuel pnces and increasing fuel costs are an unfortunate reality - a reality witnessed first-hand by Nova Scotians at...

AI summary The UARB is determining an increase in NSPI's revenue requirement for the 2007 test year due to volatile fuel prices and rising costs. NSPI seeks to recover increased fuel and pension expenses, and previously approved costs, to ensure financial health and reliable service.

N-1-aAppendix D - Credit Rating Reports (Large File - 12 MB) 4 passages
Rationale
Rationale On June 21, 2006, Standard & Poor's Ratings Services lowered its long-term corporate credit on Nova Scotia-based Emera Inc. (Emera) to 'BBB' from 'BBB+'. At the same time, the debt ratings on Emera were lowered to 'BBB-' from 'BB...

AI summary The text details a 2006 credit rating downgrade by Standard & Poor's Ratings Services for Emera Inc. and its subsidiary, Nova Scotia Power Inc. (NSPI). Ratings were lowered due to concerns over historically weak cash flow metrics, the lack of a timely fuel cost recovery mechanism, evolving procurement strategies, and challenges regarding the financing and execution of capital projects. While the ratings reflect the stability of regulated monopoly activities, they are tempered by financial risks and exposure to energy trading.

Approximately C $1 Billion of Debt Securities Affected
Approximately C $1 Billion of Debt Securities Affected Toronto, October 11, 2005 Moody's Investors Service affirmed the ratings on the debt obligations of Emera Inc. ("Emera") and its principal operating subsidiary, Nova Scotia Power Inc....

AI summary Moody's Investors Service affirmed the debt ratings for Emera Inc. and its subsidiary, Nova Scotia Power Inc. (NSP), while revising the outlook to negative. This downgrade in outlook is driven by NSP's inability to fully recover fuel costs through rate increases and significant exposure to fuel price risks. Additionally, Moody's anticipates that substantial capital expenditure requirements will result in consistently negative free cash flow for NSP following dividends and capital spending.

.Commentary/Key Trends
the remaining two were the assigning of negative outlooks to Terasen Gas Inc. (BBB/Negative/NR) and Terasen Inc. (B8B/Negative/NR) following their acquisition by Kinder Morgan Inc. (BBB/Negative/A-2). Looking ahead, in the first six months...

AI summary The text discusses the credit rating outlook for Emera Inc. and its subsidiary, Nova Scotia Power Inc. (NSPI), highlighting a negative outlook from Standard & Poor's. The rating is pressured by the under-recovery of fuel costs and delayed tax expense recovery. The analysis suggests that a downgrade is likely unless NSPI's credit metrics improve or its exposure to volatile fossil fuel costs is reduced, with the pending Nova Scotia Utility and Review Board rate determination being a critical upcoming factor.

Issuer Review
Issuer Review issuel IV South Neview Electricity Distributors Finance (EDFIN) Corp. A-¶ Laurie Conheady The rating on the C$175 million EDFIN debt issue was raised to 'A-' from 'BBB+' on Nov 29, 2005. The rating uplift reflects greater sta...

AI summary This section reviews the credit ratings and financial health of two issuers. Electricity Distributors Finance (EDFIN) Corp. saw its rating raised to 'A-' due to regulatory stability in Ontario, improved credit metrics from tariff increases, and debt reduction by its participants. Conversely, Emera Inc. maintains a 'BBB+/Negative' rating; while its financial results met expectations, it faces pressure from rising fossil fuel expenses at its subsidiary, Nova Scotia Power Inc. (NSPI), and weak coverage ratios despite some cash flow improvements.

N-1-aAppendix G - Cost of Service Study - REDACTED (Large File - 14 MB) 1 passage
1.1 Overview
1.1 Overview The overall objective of a cost of service analysis is to determine the costs associated with serving each class of customer, and to identify any inter-class inequities that may be present with regard to over or under contribu...

AI summary The text outlines the objectives and methodology of a Cost of Service Study (COSS). The primary goal is to determine the costs associated with each customer class and identify inter-class inequities based on revenue/cost ratios. It details the process of accumulating financial and operating data, allocating costs (including operating expenses, depreciation, and taxes) based on direct assignment or functional responsibility (production, transmission, distribution, and retail), and categorizing costs into demand, energy, customer, and revenue components.

N-1-aAppendix H - Proposed Tariffs (Large File - 21 MB) 2 passages
SPECIAL CONDITIONS
SPECIAL CONDITIONS - 1. The Company reserves the right to have a separate service agreement if in the opinion of the Company, issues not specifically set out herein must be addressed for the ongoing benefit of the Company and its customers...

AI summary The document outlines special conditions for customers using the rate, emphasizing the preservation of power supply system integrity. It mandates that customers ensure their load does not cause issues such as voltage flicker, unbalance, or stability problems, with specific requirements to be defined in separate operating agreements. Additionally, it grants customers the option to enter into separate agreements with NSPI for special fuel purchase arrangements to influence variable energy costs within the rate formula, subject to UARB approval.

Marginal Cost (MCi)
Marginal Cost (MCi) The MCi will be the 20-minute ahead forecast of hourly marginal fuel and variable O&M cost in any hour, excluding any impacts of electricity exports, but including imports when they impact marginal costs. The MC forecas...

AI summary The text defines the Marginal Cost (MCi) as a 20-minute ahead forecast of hourly marginal fuel and variable O&M costs. The calculation, performed by Nova Scotia Power International (NSPI), is based on in-province load requirements and excludes electricity export impacts while including imports that affect marginal costs. For NSPI's largest customers, the load levels used in the forecast are based on the pre-shifted, Customer Billing Line (CBL) value.

N-1-aAppendix B - Operating, Maintenance and General Expenses - REDACTED (Large File - 12 MB) 1 passage
(in Thousands of $)
(in Thousands of $) 2005 Actual 2006 Compliance 2006 Forecast 2007 Forecast 2007 Fct. Vs. 2005 Actual 2007 Fct. Vs. 2006 Compliance 2007 Fct. Vs. 2006 Fct. > Fuel increase related to a transfer of fuel costs from T&D Asset workgroup and in...

AI summary The document provides a detailed financial variance analysis comparing 2007 forecast figures against 2005 actuals and 2006 compliance data. Key drivers of variance include fuel cost increases resulting from budget transfers from the T&D Asset workgroup and rising market prices. Significant decreases are noted in labor, materials, and contracts due to projected storm response costs. Other factors include the completion of a three-year amortization of deferred severance costs and adjustments related to non-recurring consulting engagements.

N-1-aAppendix A - Financial Tables - REDACTED 2 passages
Section 15
41 T 44 1) Figures presented reflect whole numbers which may cause $0.1 M in rounding differences on some line items. Nova Scotia Power Inc. Detail of Fuel and Purchased Power Years Ended December 31st Millions of Dollars

AI summary The document provides a high-level financial summary of Nova Scotia Power Inc.'s fuel and purchased power costs for the fiscal years ending December 31st. It notes that the figures provided are rounded to the nearest whole number, which may result in minor rounding differences of approximately $0.1 million across certain line items.

Table 8
Table 8 (1) (2) (3) (4) (5) Compliance Present Proposed 2 Rates Rates Rates Actual Forecast Test Year Forecast Test Year Forecast Test Year Forecast 2005 2006 2006 2007 2007 3 Fuel By Type 4 Solid Fuel $277.4 $276.8 $276.8 5 Natural gas 22...

AI summary Table 8 provides a detailed breakdown of fuel types and costs for a regulatory proceeding. It compares the 2006 Compliance Year against the 2007 Test Year Forecasts for both 'Present' and 'Proposed' rates. Key data points include specific fuel types such as Solid Fuel, Natural gas, Bunker C, Furnace, Diesel, and Additives, alongside purchased power imports. The table also tracks Total System Requirements in GWH and Total Fuel Cost per MWH, showing a projected increase in fuel costs from $33.23 to $38.19.

N-2-aRIRs 1 to 39 - NSUARB to NSPI - REDACTED (Large File - 19 MB) 17 passages
Response IR-2: (cont'd)
s. The proposed true-up mechanism to ensure that the Board's intent that the rate be cost-neutral is achieved, will permit the Company to assure other customers that there is no cost transfer to them. NSPI is also very conscious of the con...

AI summary NSPI proposes a true-up mechanism to ensure cost neutrality in the new ELI 2P-RTP rate, addressing concerns from the financial community about fuel cost recovery risks. NSPI cites Mark Drazen's testimony that other utilities use fuel adjustment mechanisms for similar risks and argues that a true-up mechanism would be more straightforward in this case.

Increased commodity costs:
Increased commodity costs: Increased Heavy Fuel Oil (HFO) pricing $24.7 2006 import coal disallowance $15.7 Increased Light Fuel Oil (LFO) pricing $5.2 Increased natural gas pricing $2.6 Increased import power pricing $2.0 Solid fuel prici...

AI summary The document outlines increased commodity costs, including higher prices for heavy and light fuel oil, natural gas, and import power, as well as a load increase and associated costs, such as fuel switching and heat rate improvements at Tufts Cove.

Response IR-4: (cont'd)
Response IR-4: (cont'd) Other Maintenance schedule changes $1.2 Capacity factor changes $5.4 Reduced hydro $0.5 Increased post 2001 IPP ($0.4) Reduced exports ($1.5) Other items ($2.9) $2.4 Confidential Attachment 1 provides the informatio...

AI summary The document outlines various financial adjustments related to maintenance schedules, capacity factors, hydro production, and exports, resulting in a net change of $2.4 million. Confidential Attachment 1 supports the $24.7 million increase in HFO pricing.

Preamble
Confidential Attachment 2 provides the information supporting the $5.2 million higher LFO pricing. Confidential Attachment 3 provides the information supporting the $2.6 million higher natural gas pricing. Confidential Attachment 4 provide...

AI summary The document outlines several confidential attachments that provide information supporting higher pricing for LFO, natural gas, import power, and solid fuel mix variances at various generation stations, including Lingan.

Response IR-4: (cont'd)
Response IR-4: (cont'd) Confidential Attachment 7 provides the information supporting the price and solid fuel mix variance for Pt. Aconi generation station. Confidential Attachment 8 provides the information supporting the price and solid...

AI summary The response includes confidential attachments providing information on price and fuel mix variances for multiple generation stations, load increase components, natural gas resale margin decrease, and forecasted fuel expense changes due to thermal maintenance and capacity assumptions.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB Question IR-5: Direct Evidence, Page 7, Lines 18-21. This paragraph indicates that HFO prices are the most significant contributor to the 2007 fuel price increase. Direct evidence, Append...

AI summary The response to information request IR-5 explains that the $33.1 million decrease in HFO costs in 2007 compared to 2006C is due to changes in both price and volume. The UARB directs the reader to specific attachments for further details on price and volume variances.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB Question IR-9: Direct Evidence, Page 8, Lines 3-5. Please provide the basis for this statement. Response IR-9: Load in 2007 is forecasted to be 13,059 GWh. This is an increase of 111 GWh...

AI summary The UARB responds to a request for evidence regarding a load increase forecast from 2006 to 2007, citing higher-priced generation costs associated with the increased load. The response refers to specific pages in the Direct Evidence document.

Response IR-10:
Response IR-10: Please refer to UARB IR-4 Attachment 13 which provides the calculations to support the change to forecasted fuel and purchased power in 2007 versus 2006C due to maintenance schedule changes and unit capacities. The benchmar...

AI summary The response refers to two attachments from UARB IR-4 that provide calculations for changes in forecasted fuel and purchased power in 2007 compared to 2006C, as well as reduced hydro and other variances.

Question IR-11: Reference Page 11, lines 7-8
Question IR-11: Reference Page 11, lines 7-8 - a. Provide the Terms of Reference for the Black and Veach work. - b. What is the expected completion date of this work and when will the results be incorporated in the Fuel Procurement Policie...

AI summary The questions focus on the Terms of Reference for the Black and Veatch work, its expected completion date, and whether Liberty will have an opportunity to comment on the results before they are incorporated into the Fuel Procurement Policies and Procedures Manual.

Response IR-11:
Response IR-11: - a. Please refer to Attachment 1. - b. The work is scheduled to be complete by the end of 2006. The updating of the Fuel Procurement Policies and Procedures Manual is scheduled for early 2007. - c. Yes.

AI summary The response indicates that Attachment 1 provides further details, the work is expected to be completed by the end of 2006, and the Fuel Procurement Policies and Procedures Manual will be updated in early 2007.

OBJECTIVE
OBJECTIVE To further refine NSPI's fuel hedging policies, procedures, governance and documentation, to ensure that they are consistent with industry standards and best practices.

AI summary The objective is to refine NSPI's fuel hedging policies, procedures, governance, and documentation to align with industry standards and best practices.

SCOPE
SCOPE The consultant will address the missing elements in the NSPI hedging program outlined by the UARB in its decision. The missing elements listed are: - A clear, concise definition of hedging objectives - Statement of specific goals in...

AI summary The consultant is tasked with addressing missing elements in the NSPI hedging program as outlined by the UARB. Key elements include defining hedging objectives, specifying goals, balancing cost and reliability, and outlining permissible techniques, reporting requirements, and control mechanisms.

The Short-Term Forecast, published in F Henry Hub prices - per MMBtu in 2006 2007. EVA forecast an increase in prices to during the winter of 2006/2007. 2006, calls for average er MMBtu in per MMBtu
The Short-Term Forecast, published in F Henry Hub prices - per MMBtu in 2006 2007. EVA forecast an increase in prices to during the winter of 2006/2007. 2006, calls for average er MMBtu in per MMBtu The Long-Term F published in August 2006...

AI summary The document discusses short-term and long-term forecasts for Henry Hub gas prices, noting an expected increase during the winter of 2006/2007. EVA highlights the volatility of gas prices and suggests that upside volatility will be greater than downside volatility, especially during adverse weather events.

Question IR-15: Reference Page 35, lines 9-16 and Page 36, lines30-31
Question IR-15: Reference Page 35, lines 9-16 and Page 36, lines30-31 Directive 5 of the Board's Order of May 19, 2005 (P-881) deals with the acquisition of solid fuel expertise by NSPI. NSPI's latest report on this subject is dated Octobe...

AI summary This question relates to Directive 5 of the Board's Order P-881, which requires NSPI to acquire solid fuel expertise. The inquiry seeks information on the expertise level of an internal employee, their development plan, external training resources, and the status of the trainee in leading fuel procurement.

Response IR-15: (cont'd)
Response IR-15: (cont'd) b. all NSPI employees, has a Personal NSPI will be pleased to development with Liberty and the Board. c. EVA has provided guidance and training to the Manager of Solid Fuels on a regular basis. NSPI has subscriptio...

AI summary NSPI has engaged in various industry forums and subscribes to industry publications for market and procurement insights. EVA has provided training to the Manager of Solid Fuels. The response outlines NSPI's participation in coal-related conferences in 2006.

DATE REVISED: December 6, 2006
DATE REVISED: December 6, 2006 Location & Product Tufts Cove Natural Gas ($/MMBtu) Tufts Cove HFO ($/MMBtu) Burnside LFO ($/MMBtu) 2005 2006C 2006F 2007 2008 2009 2010 Low Sulphur Coal ($/MMBtu) Point Aconi Lingan Point Tupper Trenton Petc...

AI summary The text discusses the methodology differences in fuel cost data between 2007 and 2008, noting that 2007 values consider the operating portfolio while 2008 values are commodity forecasts. Fuel costs are also highlighted as subject to change due to various factors.

Question IR-24: Reference Page 59
Question IR-24: Reference Page 59 - a. What is the delivery point for the petcoke price quoted on line 1? - b. What are the additional transportation charges to get the petcoke to the plants? - c. Are the solid fuels costs of Figure 2.12 f...

AI summary This section of the regulatory proceeding document includes four questions related to petcoke delivery points, transportation charges, solid fuel costs, and fuel specifications for petcoke consumed in 2007.

N-2-aRIRs 40 to 69 - NSUARB to NSPI - REDACTED (Large File - 34 MB) 3 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB Question IR-48: Reference Page 159, lines 11-12 Will there be any revisions and if so, when will they be filed? Response IR-48: At the time of filing NSPI's Direct Evidence the UARB had n...

AI summary Nova Scotia Power Inc. (NSPI) acknowledges that revisions to the 2007 Revenue Requirement are necessary following the DARB's decision regarding the replacement for the Extra Large Industrial Interruptible Rate (ELIIR). The revisions will account for the specific fuel forecast associated with the Extra Large Industrial Two Part Real Time Pricing Rate (2P-RTP) and the required flat line Customer Baseline Loadshape (CBL). NSPI notes that the current application reflects an incorrect historical loadshape and that the final revision calculation is pending.

Response IR-48: (cont'd)
Response IR-48: (cont'd) would reflect the cost of the fuel required to serve the resulting system load shape. If the customers maintain their established flat load shape (CBL), NSPI will incur and the customer will pay the full cost of fu...

AI summary Nova Scotia Power Inc. (NSPI) argues that a revision to the revenue requirement is necessary to accurately reflect fuel costs associated with a flat Customer Base Load (CBL) shape under the ELI 2P-RTP tariff. The current evidence incorrectly uses historical load shapes for fuel cost calculations. NSPI seeks a true-up mechanism to align load shifting debits and credits with incremental and decremental fuel costs, ensuring the tariff functions as intended by the UARB without requiring a full revision to the Rate Application.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB REDACTED Question IR-49: Reference Page 165, lines 21-29 Provide the following for the 2007 Load Following Rate: - a) Strategist runs for the base case and the 25 MW decremental case. Pro...

AI summary The Utility and Rate Board (UARB) issued an information request (IR-49) to Nova Scotia Power Inc. (NSPI) regarding the 2007 Load Following Rate. The Board requested Strategist runs for base and decremental cases, forecast fuel prices for 2007, maintenance schedules for Power Production units, and monthly system cost tables. Additionally, the Board inquired whether NSPI considered the proposed 51.1% rate increase over 2006 to be a 'rate shock.' NSPI provided responses directing the Board to confidential attachments and previous information requests.

N-2-bRIRs 70 to 75 - NSUARB to NSPI - REDACTED (Large File - 33 MB) 1 passage
Adjustment Clauses
Adjustment Clauses Below is a list of utilities whose rates include adjustment clauses that may cause fluctuations in the price of electricity even though base rates have not been adjusted. Boston Edison, MA Demand-Side Management Charge E...

AI summary The text lists various utilities and their adjustment clauses that can cause electricity price fluctuations. These include charges related to energy efficiency, renewable energy, decommissioning, and tax adjustments across multiple jurisdictions.

N-2-bRIRs 77 to 84 - NSUARB to NSPI - REDACTED (Large File - 35 MB) 26 passages
m. Derivative Financial Instruments
m. Derivative Financial Instruments The Company uses various derivative financial instruments to hedge its exposure to foreign exchange, interest rate, and commodity price risks. If documentation and effectiveness requirements are met, gai...

AI summary Nova Scotia Power Incorporated (NSPI) utilizes derivative financial instruments to hedge against foreign exchange, interest rate, and commodity price risks. The company follows specific accounting treatments for these instruments: when documentation and effectiveness requirements are met, gains and losses are deferred until the related risk is realized (settlement accounting). If requirements are not met, instruments are marked-to-market in the period of ineffectiveness. Gains/losses from foreign exchange and commodity hedges are recognized in fuel purchase costs, while interest rate hedges are recognized over the term of the hedged item in interest expense.

{millions of dollars}
{millions of dollars} Affiliate Pu!Eose of Transaction 2005 2004 Sales: Emera Fuels Net sale of bunker C oil $0.6 $9.4 Emera Energy Services Net sale of gas and electricity 195.4 156.5 Emera Inc. Allocation of common costs $6.0 $5.8 Variou...

AI summary The document provides a financial breakdown of affiliate transactions between Emera entities for the years 2004 and 2005. It details sales of bunker C oil, gas, electricity, and common costs, alongside purchases of transformer maintenance, line extension work, and a gas turbine. Additionally, it notes a $16.7 million purchase of transportation capacity from Maritimes and Northeast Pipeline, an entity under significant influence of Emera Inc., which is recognized as a fuel expense at fair market value.

Commodity prices
Commodity prices The Company purchased natural gas swap contracts in 2005 to limit exposure to fluctuations in natural gas prices. As at December 31, 2005, the Company had hedged approximately 80% of all natural gas purchases and sales for...

AI summary The Company describes its hedging strategies for natural gas and heavy fuel oil to mitigate exposure to price fluctuations. As of December 31, 2005, the Company had hedged approximately 80% of its natural gas purchases and sales for 2006 using swap contracts. Additionally, oil swap contracts were in place to fix the price of approximately 90% of the 2006 heavy fuel oil requirements and 23% of the 2007 requirements.

Commodity price and foreign exchange risk
Commodity price and foreign exchange risk A substantial amount of NSPI's fuel supply comes from international suppliers, and is subject to commodity price and foreign exchange risk. The Company manages exposure to commodity price risk util...

AI summary Nova Scotia Power Incorporated (NSPI) manages significant exposure to international commodity price and foreign exchange risks associated with its fuel supply. The Company employs a multi-faceted risk management strategy including physical fixed-price fuel contracts, financial instruments (forwards and options), and portfolio-based measurements for Canadian dollar costs. Additionally, NSPI leverages the operational flexibility of switching between different fuel types to mitigate supply and price volatility.

Five-Year Summary
Five-Year Summary 2005 2004 2003 2002 2001 -oil 100.2 91.2 91.4 20.6 40.7 - natural gas Purchased eower (35.4) 48.1 (30.6) 33.4 (58.4) 33.0 62.5 22.9 35.8 21 .6 Total cost $373.8 $303.1 $277.8 $335.6 $301 .0 Balance Sheets Information Curr...

AI summary The text provides a five-year financial summary (2001-2005) for a utility entity, detailing key financial metrics including fuel costs (oil and natural gas), total costs, and balance sheet information. It lists assets such as property, plant, and equipment, as well as liabilities like long-term debt, preferred shares, common shares, and asset retirement obligations. Additionally, it summarizes cash flow from operating and investing activities over the five-year period.

2005 Electricity Rate Increase
2005 Electricity Rate Increase On March 31 , 2005, the UARB granted NSPI an average rate increase of approximately 5.3%, effective April 1, 2005. The rate decision increased NSPI's electric revenues by approximately $25.0 million in 2005 c...

AI summary The Utility and Rate Board (UARB) granted Nova Scotia Power Inc. (NSPI) an average rate increase of approximately 5.3% effective April 1, 2005, resulting in a $25.0 million revenue increase. The decision included full recovery of a $146.7 million Section 21 income tax deposit starting in 2007. Notably, the UARB disallowed $18 million in forecasted fuel costs due to unsatisfactory past procurement practices and rejected a $13 million cost deferral proposal.

2006 Rate Application
2006 Rate Application In July 2005, Nova Scotia Power filed a general rate application requesting an average 15% increase in electricity prices for 2006, primarily a result of rising fuel commodity prices. In November, as a result of benef...

AI summary Nova Scotia Power (NSPI) filed a 2006 general rate application initially requesting a 15% price increase due to rising fuel commodity costs. Following the renegotiation of a natural gas supply contract, NSPI lowered the requested increase to an average of 13%. The application also includes a $19 million request for operating cost increases aimed at enhancing customer service, improving network reliability, and implementing new energy efficiency and conservation measures.

Natural gas supply contract
Natural gas supply contract In 04, 2005, Nova Scotia Power reached an agreement with its supplier on pricing for natural gas under an existing long-term natural gas purchase agreement. The contract - which began in 2000 and runs until 2010...

AI summary Nova Scotia Power Inc. (NSPI) describes a 2005 pricing dispute with its natural gas supplier regarding a long-term purchase agreement. After failing to reach a voluntary agreement, the matter entered arbitration. The parties eventually settled before a final decision was rendered. The resulting contract price was more favorable than NSPI's estimates, leading to a $23.8 million fuel expense adjustment and a separate $8.0 million net payment from the supplier, both of which were recorded in 2004.

Net Earnings
Net Earnings {millions of dollars} Three months ended December 31 Year ended December 31 2005 2004 2005 2004 2003 Electric revenue $243.0 $237.8 $955.0 $926.9 $895.6 Fuel for generation and purchased power 79.5 86.9 373.8 303.1 277.8 Opera...

AI summary The document provides a detailed financial analysis of Nova Scotia Power Inc.'s (NSPI) net earnings from 2003 to 2005. While Q4 2005 saw a significant increase in net earnings to $34.0 million, primarily driven by favorable natural gas supply contract pricing and a separate $8.0 million net payment from a supplier, annual net earnings trended downward from $112.1 million in 2003 to $91.2 million in 2005. Key factors influencing these changes included load growth, increased fuel expenses from higher commodity prices, capital investment-related depreciation, and a 5.3% rate increase in 2005.

Section 120
A substantial amount of NSPI's fuel supply comes from international suppliers, and is subject to commodity price and foreign exchange risk. The company manages exposure to commodity price risk utilizing a portfolio strategy, combining phys...

AI summary Nova Scotia Power Inc. (NSPI) manages significant commodity price and foreign exchange risks associated with its international fuel supply. The company employs a portfolio strategy that combines physical fixed-price fuel contracts with financial instruments (forwards and options) to mitigate these risks. The text also provides a historical overview of fuel costs for generation and purchased power, showing a substantial increase in costs from 2003 to 2005.

Three Months ended Year ended
Three Months ended Year ended (millions of dollars) December 31 December 31 Fuel for generation and purchased power, December 31, 2003 $277.8 Lower net proceeds from resale of natural gas 32.0 Decreased export volumes (11.4) Decreased rene...

AI summary The document provides a financial breakdown of fuel costs for generation and purchased power for Nova Scotia Power Inc. (NSPI) across three fiscal years (2003, 2004, and 2005). It details fluctuations in costs driven by commodity pricing, exchange rates, changes in generation mix (including hydro and renewable production volumes), and the finalization of natural gas supply contract pricing terms.

Other Income
Other Income During 2005, Nova Scotia Power received a payment of $10.5 million, less $2.5 million of associated costs, from a gas supplier as part of renegotiation of certain contractual matters. In accordance with ratemaking regulations...

AI summary Nova Scotia Power Inc. (NSPI) reports on its 2005 financial performance and 2006 outlook. Key points include a $10.5 million payment from a gas supplier, the use of the taxes-payable method for income tax accounting, and the management of a $146.7 million regulatory asset for disallowed pre-2003 taxes. NSPI anticipates lower electricity load in 2006 due to weather and industrial shutdowns, while forecasting higher fuel costs due to commodity prices and environmental regulations.

NSPI has established the following available credit facilities :
NSPI has established the following available credit facilities : {millions of dollars) Maturity Maximum Amount Short-term Commercial paper, with 100% backup line of credit 1 year revolving $400.0 Operating credit facility 3 year revolving...

AI summary Nova Scotia Power Inc. (NSPI) outlines its available credit facilities, including a $400.0 million revolving commercial paper line and a $100.0 million operating credit facility. The document also details NSPI's credit ratings from DBRS, S&P, and Moody's for various debt instruments. Notably, both S&P and Moody's revised NSPI's outlook to negative in 2005, specifically citing concerns regarding fuel cost recovery and regulatory uncertainty.

(millions of dollars)
(millions of dollars) Three months ended Year ended December 31 December 31 2005 2004 2005 2004 Fuel and purchased power increase $(3.9) $(3.7) $(20.5) $(4.9) Interest expense increase (0.5) (1.0) (1.9) (4.7) Hedging earnings impact (4.4)...

AI summary The document presents a financial comparison of fuel and purchased power expenses, interest expenses, and hedging earnings impacts for Nova Scotia Power Inc. (NSPI) for the years 2004 and 2005. It highlights a significant increase in fuel and purchased power expenses, rising from $4.9 million in 2004 to $20.5 million in 2005. Additionally, it notes an $8.5 million mark-to-market gain in fuel and purchased power expense recognized in the fourth quarter of 2005.

Commodity Prices
Commodity Prices Substantially all of the company's annual fuel requirement is subject to fluctuations in commodity market prices, prior to any commodity risk management activities. NSPI developed and put forth for regulatory approval, a p...

AI summary Nova Scotia Power Inc. (NSPI) outlines its fuel procurement portfolio strategy designed to manage the volatility of commodity market prices. The strategy involves a mix of long, medium, and short-term supply agreements with creditworthy counterparties. By diversifying suppliers and utilizing staggered expiration dates, volume options, and varied pricing mechanisms, the company aims to mitigate the impact of market fluctuations on its annual fuel requirements.

Coal/ Petroleum Coke
Coal/ Petroleum Coke A substantial portion of the company's coal and petroleum coke supply comes from international suppliers at prevailing market prices. The company has entered into fixed-price contractual arrangements with several suppl...

AI summary Nova Scotia Power Inc. (NSPI) manages its coal and petroleum coke supply by utilizing a mix of international suppliers at market prices and fixed-price contractual arrangements. Due to a lack of liquidity in financial markets for coal, the company employs physical contracts to hedge against price risk. The document provides a breakdown of contracted coal and petcoke requirements, showing a significant decrease in contracted percentages from 85% in 2006 to 17% by 2008.

Heavy Fuel Oil
Heavy Fuel Oil NSPI manages exposure to changes in the market price of heavy fuel oil through the use of swaps, options and futures contracts. As at December 31 , 2005, the price of heavy fuel oil purchases has been hedged and contracted a...

AI summary Nova Scotia Power Inc. (NSPI) manages its exposure to heavy fuel oil market price fluctuations by utilizing financial instruments, including swaps, options, and futures contracts. The document provides specific hedging percentages for the heavy fuel oil purchases contracted as of December 31, 2005, noting that 90% of the 2006 requirements were hedged, compared to 26% for 2007.

Fuel Mix
Fuel Mix The risk due to fluctuation of the Canadian dollar against the US dollar for the cost of fuel is measured and managed. The ability to switch fuel provides a dynamic, operational and effective option in managing commodity price and...

AI summary Nova Scotia Power Inc. (NSPI) describes its strategy for managing fuel cost risks, specifically focusing on currency fluctuations between the Canadian and U.S. dollars. The company utilizes its ability to switch fuel types as a dynamic operational tool to mitigate commodity price and supply risks. For 2006, NSPI anticipates that 80% of net fuel costs will be in U.S. dollars, which they plan to hedge through $US income from surplus natural gas sales and forward contracts covering approximately 93% of anticipated $US net fuel costs.

Regulatory Risk
Regulatory Risk In December 2001 , the Nova Scotia government released Nova Scotia's Energy Strategy, Seizing the Opportunity. The strategy for the electricity industry is to carefully introduce certain aspects of competition over time. Th...

AI summary The document outlines the regulatory landscape and risks for Nova Scotia Power Inc. (NSPI), focusing on the province's strategy to introduce competition in the electricity industry. While the Electricity Act and Open Access Transmission Tariff (OATI) facilitate wholesale competition and exports, significant restructuring is not expected in the medium term due to geographic and infrastructure constraints. A primary regulatory risk identified is the uncertainty regarding the full recovery of fuel costs, with NSPI seeking a Fuel Adjustment Mechanism (FAM) or more frequent rate cases to mitigate these costs.

Inventory
Inventory In August 2006, Nova Scotia Power changed its method of costing fuel inventory from the first-in, first-out method to the weighted average cost method to provide more appropriate information. The change in accounting policy has b...

AI summary Nova Scotia Power Inc. changed its accounting method for costing fuel inventory from first-in, first-out to the weighted average cost method in August 2006. This change was implemented to provide more appropriate information and received approval from the Utility and Rate Board (UARB).

Preamble
In the ordinary course of business, Emera purchased natural gas transportation capacity totaling $7.4 million (2005- $5.9 million) during the three months ended September 30, 2006, and $23.1 million (2005- $16.6 million) during the nine mo...

AI summary The text describes Emera's purchase of natural gas transportation capacity from Maritimes & Northeast Pipeline, a company under significant influence of the Company. For the first nine months of 2006, these purchases totaled $23.1 million. The costs are recognized as fuel for generation or purchased power, or netted against energy marketing margins. As of September 30, 2006, the outstanding payable to the related party was $5.3 million, maintained under normal interest and credit terms.

REGULATED STATEMENT OF EARNINGS
REGULATED STATEMENT OF EARNINGS Quarter-to-Date Actual September Quarter-to-Date Budget September Quarter-to-Date Variance September Year-to-Date Actual Year-to-Date Budget Year-to-Date Variance Full Year Budget Prior YTD Actual Curr/Prior...

AI summary The Regulated Statement of Earnings provides a financial performance comparison for Nova Scotia Power Inc. (NSPI) as of September. The data tracks actual versus budgeted figures for revenue, cost of operations, and depreciation. Key findings include a significant year-to-date variance where actual electric revenue (approximately $710 million) fell short of the budget (approximately $856 million). Additionally, fuel for generation costs were substantially lower than budgeted for the year-to-date period.

Inventory
Inventory In August 2006, Nova Scotia Power changed its method of costing fuel inventory from the first-in, first-out method to the weighted average cost method to provide more appropriate information. The change in accounting policy has b...

AI summary Nova Scotia Power Inc. (NSPI) updated its fuel inventory costing method from first-in, first-out to the weighted average cost method in August 2006. This change, approved by the UARB, was intended to provide more accurate information. While the CICA Handbook requires retroactive application of such policy changes, NSPI opted not to restate prior periods due to the immateriality of the adjustments. The transition resulted in a cumulative adjustment of $1.0 million to the Q3 2006 opening balance, decreasing inventory and increasing fuel expense.

Year to date, NSPI had sales and purchases from companies under common control of Emera Inc. as follows :
Year to date, NSPI had sales and purchases from companies under common control of Emera Inc. as follows : For the Nine months ended millions of dollars Se~tember 30 Affil iate Pur~ose of Transaction 2006 2005 Sales: Emera Energy Services N...

AI summary The document details the year-to-date sales and purchases between Nova Scotia Power Inc. (NSPI) and various companies under common control of Emera Inc. for the nine months ended September 30, 2006. Transactions include net sales of gas, electricity, swaps, and common costs, as well as purchases of transformers, line work, and other services. Additionally, it notes a $12.8 million purchase of natural gas transportation capacity from Maritimes & Northeast Pipeline, an Emera-influenced investment.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB Question IR-82: Please provide the Strategist runs used to compute the fuel and purchased power costs for the years 2006 and 2007. Response IR-82: Please refer to Confidential Liberty IR-...

AI summary The Nova Scotia Utility and Rate Board (NSUARB) responded to an information request from Nova Scotia Power Inc. (NSPI) regarding the specific Strategist runs used to calculate fuel and purchased power costs for the years 2006 and 2007. The Board directed the respondent to confidential documents for the specific data.

NOV A SCOTIA UTILITY AND REVIEW BOARD
NOV A SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: The Public Utilities Act, R.S.N.S. 1989, c.380 as amended IN THE MATTER OF: An Application by Nova Scotia Power Incorporated for Approval of Certain Revisions to its Rates, Charges an...

AI summary This document is a response to an information request (IR-84) from the Nova Scotia Utility and Rate Board (UARB) to Nova Scotia Power Incorporated (NSPI). The Board requested the 2007 fuel forecast in a specific format and level of detail consistent with the 2005 rate case (P-881). NSPI directed the Board to Confidential Attachment 1 for the requested data.

N-2-bRIR 76 - NSUARB to NSPI - REDACTED (Large File - 46 MB) 22 passages
To My Fellow Shareholders
To My Fellow Shareholders In my letter last year, I emphasized the importance of Emera increasing the predictability of its earnings as a critical step in delivering on our investment value proposition. We've made solid progress toward thi...

AI summary The CEO addresses shareholders regarding Emera's efforts to increase earnings predictability. The text highlights historical challenges at Nova Scotia Power (NSPI), specifically regarding rate increases and the impact of fluctuating world fuel prices. It notes that the Nova Scotia Utility and Review Board (UARB) previously criticized NSPI's fuel procurement. To mitigate these risks, NSPI has diversified its fuel mix, established a portfolio of contracts for commodities and currency, and invested in new infrastructure to ensure cost recovery and competitive access to global coal supplies.

millions of dollars December 31 December 31
millions of dollars December 31 December 31 Consolidated net earnings - 2003 $ 129.2 Increased electric revenue in NSPI, reflecting volume growth 21.3 Increased fuel expense in NSPI due to reduced gas sales margin and higher coal costs in...

AI summary The document provides a financial breakdown of consolidated net earnings for NSPI and BHE from 2003 to 2005. It details key drivers of net earnings, including fluctuations in electric revenue, fuel expenses (impacted by coal costs and gas sales margins), depreciation from capital investments, interest expenses, and operating costs related to storm response and maintenance. It also notes specific impacts from the 5.3% rate increase in 2005, foreign exchange gains, and the addition of the Bear Swamp hydro-electric facility.

Natural gas supply contract
Natural gas supply contract In Q4, 2005, Nova Scotia Power reached an agreement with its supplier on pricing for natural gas under an existing longterm natural gas purchase agreement. The contract- which began in 2000 and runs until 2010 -...

AI summary Nova Scotia Power reached a natural gas supply agreement in Q4 2005 following a period of arbitration regarding price redetermination for a contract running until 2010. The final agreed price was more favorable than the company's initial estimates, resulting in a $23.8 million ($14.7 million after-tax) fuel expense adjustment. Additionally, Nova Scotia Power received a net payment of $8.0 million ($5.0 million after-tax) from the supplier, which was recorded as other income.

2005 Electricity Rate Increase
2005 Electricity Rate Increase On March 31, 2005, the UARB granted NSPI an average rate increase of approximately 5.3%, effective April 1, 2005. The rate decision increased NSPI's electric revenues by approximately $25 million in 2005 comp...

AI summary The UARB granted Nova Scotia Power (NSPI) an average electricity rate increase of approximately 5.3% effective April 1, 2005, resulting in a $25 million revenue increase. The decision included a provision for the full recovery of a $146.7 million Section 21 income tax deposit over eight years starting in 2007. However, the UARB disallowed $18 million in forecasted 2005 fuel costs due to past procurement practices and rejected a $13 million cost deferral proposal. NSPI subsequently filed a compliance report regarding fuel procurement changes.

2006 Rate Application
2006 Rate Application In July 2005, Nova Scotia Power filed a general rate application requesting an average 15% increase in electricity prices for 2006, primarily a result of rising fuel commodity prices. In November, as a result of benef...

AI summary Nova Scotia Power filed a 2006 general rate application seeking an average 15% price increase, largely driven by rising fuel commodity prices. Following the renegotiation of a natural gas supply contract, the company reduced its requested increase to 13%. The application also includes a request for $19 million in additional operating costs intended to enhance customer service, improve network reliability, and fund new energy efficiency and conservation initiatives.

NSPI NET EARNINGS
NSPI NET EARNINGS Three months ended Decem ber 31 Yea r ended Decem ber 31 millions of dollars (except earn ings per common share) 2005 2004 2005 2004 2003 Electric revenue $ 243.0 $ 237.8 $ 955.0 $ 926.9 $ 895.6 Fuel for generation and pu...

AI summary The document provides a financial summary of NSPI net earnings for the years 2003 through 2005. It details electric revenue, fuel costs, operating expenses, depreciation, and regulatory amortization. Key observations include a decrease in contribution to consolidated net earnings from 2003 to 2005, attributed to increased fuel expenses from higher coal costs and reduced gas sales margins, as well as increased provincial grants and taxes, despite growth in electric revenues.

Q4 AVERAGE UNIT FUEL COSTS
Q4 AVERAGE UNIT FUEL COSTS 2005 2004 2003 Dollars per MWh $ 25 $ 26 $ 20 2005 2004 2003 Dollars per MWh $ 30 $ 24 $ 23 Coal is NSPI's dominant fuel source, supplying approximately 50% of the company's annual generation. Petroleum coke ("pe...

AI summary The text outlines the average unit fuel costs for NSPI across three years (2003-2005) for two different categories. It identifies coal as the dominant fuel source, accounting for 50% of annual generation, followed by petroleum coke at 25%. These solid fuels are noted as the lowest-cost options following hydro and wind. The document explains that economic dispatch prioritizes lower-cost fuels first, causing incremental production costs to rise as sales volume increases, while purchased power remains the most expensive option.

Section 48
A substantial amount of NSPI's fuel supply comes from international suppliers, and is subject to commod ity price and foreign exchange risk. The company manages exposure to commodity price risk utilizing a portfolio strategy, combining phy...

AI summary Nova Scotia Power Inc. (NSPI) manages significant fuel supply risks stemming from international markets, specifically commodity price volatility and foreign exchange fluctuations. The company employs a portfolio strategy to mitigate these risks, utilizing a combination of physical fixed-price fuel contracts and financial instruments like forwards and options. The text also provides a comparative overview of fuel costs for generation and purchased power, noting a significant increase in expenditures from 2003 to 2005.

Three months ended Year ended
Three months ended Year ended millions of dollars Fuel for generation and purchased power - 2003 December 31 December 31 $ 277.8 Lower net proceeds from resale of natural gas 32.0 Increased production 16.9 Decreased renewable production vo...

AI summary The text details the fuel costs for generation and purchased power for Nova Scotia Power from 2003 to 2005. It highlights a significant 2005 adjustment where a final agreement on natural gas pricing terms was reached following a period of arbitration. The final price was more favorable than NSPI's estimates, resulting in a $23.8 million fuel expense adjustment in Q4 2005. Additionally, NSPI received an $8.0 million net payment from its gas supplier, recorded as other income.

OUTLOOK
OUTLOOK NSPI's earnings outlook for 2006 is substantially dependent on the outcome of the 2006 rate decision, expected in Ql, 2006. The magnitude of any approved increase, as well as timing of the implementation will affect revenues and co...

AI summary Nova Scotia Power Inc. (NSPI) outlines its 2006 earnings outlook, noting substantial dependence on the pending 2006 rate decision. Key factors impacting revenue include lower electricity sales volume due to warmer weather, industrial customer shutdowns, and conservation efforts. Conversely, fuel costs are projected to rise because of higher commodity prices and a shift toward lower-sulphur coal to meet environmental regulations. NSPI also anticipates consistent operating costs alongside new investments in vegetation management and storm response.

Preamble
On July 5, 2005, Standard & Poor's Rating Services revised its outlook on Nova Scotia Power to negative from stable, citing fuel cost recovery concerns. On July 6, 2005, the Dominion Bond Rating Service confirmed NSPI's ratings as A (low)...

AI summary The text outlines credit rating actions taken by major agencies in mid-to-late 2005 regarding Nova Scotia Power. Standard & Poor's and Moody's both revised their outlooks to negative, specifically citing concerns over fuel cost recovery and regulatory uncertainty. Meanwhile, Dominion Bond Rating Service maintained its A (low) rating and R-1 (low) commercial paper rating for the utility.

Emera has established the fol lowing credit fac ilities outside its regulated electric uti lities:
Emera has established the fol lowing credit fac ilities outside its regulated electric uti lities: millions of dollars Maturity Maximum amount Short-term Operating credit facil ity 1 Year Revolving $ 200.0 Acquisition credit facility 1 Yea...

AI summary The document outlines Emera's credit facilities and ratings for its non-regulated entities, including a $200 million operating credit facility and a $400 million acquisition credit facility. It also details the company's long-term corporate and senior unsecured debt ratings from DBRS, S&P, and Moody's. Notably, S&P and Moody's downgraded Emera's outlook to negative in 2005, specifically citing regulatory uncertainty and concerns regarding fuel cost recovery for Nova Scotia Power.

Transactions With Related Parties
Transactions With Related Parties In the ordinary course of business, Emera purchased natural gas transportation capacity total ling $9.5 million (2004- $10.1 million) during the th ree months ended December 31, 2005, and $39.7 million (20...

AI summary The text describes transactions between Emera and its related party, Maritimes & Northeast Pipeline. For the year ended December 31, 2005, Emera purchased $39.7 million in natural gas transportation capacity. These costs are recognized as fuel for generation or purchased power, or netted against energy marketing margins. As of December 31, 2005, the outstanding payable to the related party was $3.0 million, which is non-interest bearing and subject to normal credit terms.

Commodity Prices
Commodity Prices Substantially all of the company's annual fuel requirement is subject to fluctuation in commodity market prices, prior to any commodity risk management activities. NSPI developed and put forth for regulatory approval, a po...

AI summary Nova Scotia Power Inc. (NSPI) describes its fuel procurement strategy, noting that the majority of its annual fuel requirements are subject to market price fluctuations. To mitigate this volatility, NSPI has developed a portfolio strategy for regulatory approval. This strategy employs a mix of long, medium, and short-term supply agreements with creditworthy counterparties, utilizing staggered expiration dates, volume options, and diverse pricing mechanisms to ensure supply security and price stability.

Coal/Petroleum Coke
Coal/Petroleum Coke A substantial portion of the company's coal and petroleum coke supply comes from international suppliers at preva iling market prices. The company has entered into fixed-price contractual arrangements with several suppl...

AI summary The company utilizes a fuel procurement portfolio strategy that includes both international market-priced supplies and fixed-price contractual arrangements for coal and petroleum coke. Due to a lack of liquidity in financial markets for coal, the company employs physical contracts as a hedging mechanism against price risk. The text provides specific percentages of coal and petcoke requirements contracted for the years 2006, 2007, and 2008.

Heavy Fuel Oil
Heavy Fuel Oil NSPI manages exposure to changes in the market price of heavy fuel oil through the use of swaps, options, and futures contracts. As at December 31, 2005, the price for the heavy fuel oil purchases has been hedged and contrac...

AI summary Nova Scotia Power Inc. (NSPI) manages its exposure to heavy fuel oil market price fluctuations by utilizing financial instruments, specifically swaps, options, and futures contracts. As of December 31, 2005, the company reported significant hedging levels for upcoming years, with 90% of heavy fuel oil purchases contracted for 2006 and 26% contracted for 2007.

Fuel Mix
Fuel Mix The risk due to fluctuation of the Canadian dollar against the US dollar for the cost of fuel is measured and managed. The ability to switch fuel provides a dynamic, operational and effective option in managing commodity price and...

AI summary The text discusses the utility's strategy for managing fuel risks, specifically focusing on the impact of Canadian and US dollar exchange rate fluctuations on fuel costs. It highlights the utility's ability to switch between different fuel sources as a dynamic operational tool to mitigate risks associated with commodity price volatility and supply availability.

Foreign Exchange
Foreign Exchange In 2006, NSPI expects approximately 80% of its anticipated net fuel costs to be denominated in US dollars; $US from sales of surplus natural gas wil l provide a natural hedge against a portion of $US denominated fuel costs...

AI summary Nova Scotia Power Inc. (NSPI) discusses its strategy for managing foreign exchange risk related to fuel costs and debt. Approximately 80% of net fuel costs are expected to be denominated in US dollars, partially offset by a natural hedge from surplus natural gas sales. NSPI utilizes forward contracts to manage currency fluctuations, covering roughly 93% of anticipated US dollar net fuel costs for 2006. Additionally, US dollar revenues from the Maritimes & Northeast Pipeline investment are designated for US debt repayment.

Nova Scotia Power
Nova Scotia Power In December 2001, the Nova Scotia government released Nova Scotia's Energy Strategy, Seizing the Opportunity. The strategy for the electricity industry is to careful ly introduce certa in aspects of competition over time....

AI summary Nova Scotia Power (NSPI) discusses the province's electricity strategy, which aims to introduce competition over time as permitted by the Electricity Act. Key developments include the approved Open Access Transmission Tariff (OATT) to facilitate wholesale competition and export reciprocity. NSPI notes that major structural changes are unlikely in the medium term due to geographic and infrastructure constraints. The company is currently addressing concerns regarding fuel cost recovery and is seeking approval for a Fuel Adjustment Mechanism (FAM) while filing for 2006 customer rates.

o. Derivative Financial and Commodity Instruments
o. Derivative Financial and Commodity Instruments The Company uses various derivative financial instruments to hedge its exposure to foreign exchange, interest rate, and commodity price risks. If the documentation and effectiveness require...

AI summary The Company describes its use of derivative financial and commodity instruments to hedge against foreign exchange, interest rate, and commodity price risks. It explains the accounting treatment for these instruments, noting that gains and losses are deferred and recognized when the hedged risk is realized, provided documentation and effectiveness requirements are met. The Company also clarifies the treatment of non-hedging derivatives, which are marked-to-market and reflected on the balance sheet. Additionally, the text outlines the accounting for goodwill, including its lack of amortization and the criteria for impairment testing.

Commodity Prices
Commodity Prices The Company purchased natural gas swap contracts in 2005 to limit exposure to fluctuations in natural gas prices. As at December 31, 2005, the Company had hedged approximately 80% of all natural gas pu rchases and sales fo...

AI summary The Company describes its hedging strategies and financial instruments used to manage commodity price volatility. As of December 31, 2005, Nova Scotia Power Inc. had hedged approximately 80% of its 2006 natural gas purchases and sales using swap contracts, and approximately 90% of its 2006 heavy fuel oil requirements using oil swap contracts. Additionally, the Company maintains non-hedging derivative financial instruments for natural gas, power, and oil, which are recorded as marked-to-market.

Commodity Price and Foreign Exchange Risk
Commodity Price and Foreign Exchange Risk A substantial amou nt of NSPI's fuel supply comes from international suppliers, and is subject to commod ity price and foreign exchange risk. NSPI manages exposure to commod ity price risk utilizin...

AI summary Nova Scotia Power Inc. (NSPI) manages exposure to international commodity price and foreign exchange risks associated with its fuel supply. The company utilizes a mix of physical fixed-price fuel contracts, financial instruments (such as forwards and options), and portfolio-based management for Canadian dollar costs. Additionally, NSPI leverages its ability to switch between different fuel types as a dynamic operational strategy to mitigate supply and price volatility.

N-2-cRIRs 1 to 66 - Avon to NSPI - REDACTED (Large File - 13 MB) 5 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: AVON Question IR-1: In regard to the $68.5 million higher fuel and purchase power expenses for 2007, please break these down by individual fuel types, such as HFO, LFO, petroleum coke, domesti...

AI summary AVON responds to NSPI's request for a breakdown of $68.5 million higher fuel and purchase power expenses in 2007 by directing them to UARB IR-4 Attachments 1 through 14 and Liberty Consulting IR-43 Attachment 1 for detailed calculations and solid fuel sourcing assumptions.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: AVON REDACTED Question IR-14: Please provide information of any ongoing or planned RFPs for coal supplies since the Direct Testimony was filed or in the balance of this year. Response IR-14: I...

AI summary NSPI responds to an information request regarding ongoing or planned RFPs for coal supplies since the Direct Testimony was filed. NSPI states that information is available at their offices and that they plan to value contract options through an RFP process by year-end.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: AVON REDACTED Question IR-22: In regard to the test burn program, please provide a summary of test burn results, including delivered costs, coal qualities and decisions on the suitability of t...

AI summary In response to an information request regarding the test burn program, NSPI indicates that confidential information is available for viewing at their offices, except for delivered costs, which are provided in CDN $/MMBtu.

Response IR-51:
Response IR-51: Solid Fuel\ Natural Gas Bunker C \ Includes the disallowance in 2006. Without the disallowance, 2006C solid fuel was -and 2007 would be

AI summary The text discusses a table related to fuel types, including a note about a disallowance in 2006 affecting solid fuel calculations. The note indicates that without the disallowance, the 2006C solid fuel value and 2007 value would be different.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: AVON Question IR-52: In regard to the "industry consensus" on world crude oil prices, please document which materials EVA consulted to form an opinion on the industry consensus referred to. Re...

AI summary EVA consulted various materials to form an opinion on the industry consensus regarding world crude oil prices. It references its own forecast and the U.S. Department of Energy's (USDOE) Short-Term Outlook from 2006, noting that oil prices were expected to remain elevated due to geopolitical concerns.

N-2-cRIRs 1 to 39 - CA to NSPI - REDACTED (Large File - 14 MB) 7 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-1: Provide a list of all fuel contracts for any period including 2007 that NSPI has entered into, showing a. the fuel type, b. the quantity or quantities, c. the pricing terms,...

AI summary The document is a formal response from the Nova Scotia Power Inc. (NSPI) to an Information Request (IR-1) submitted by the Canada Nova Scotia Electricity Corporation (CNS要C). The request seeks a comprehensive list of fuel contracts involving NSPI for any period including 2007, specifically requesting details on fuel types, quantities, pricing terms, and commitment dates. NSPI directs the reviewer to two confidential attachments containing the requested data for solid fuel, natural gas, heavy fuel oil (HFO), and light fuel oil (LFO).

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA REDACTED Question IR-2: Provide the contract between NSPI and EVA for services that resulted in the testimony included in the NSPI 2007 rate case filing at pp. 14 through 37, including the...

AI summary Canada Nova Scotia Electricity Corporation (CA) responded to an information request regarding the contractual relationship between Nova Scotia Power Inc. (NSPI) and EVA. CA clarified that NSPI maintains a standing retainer relationship with EVA for expert fuel-related advice, which includes the development of evidence for rate case filings. CA directed the requester to a confidential attachment for the specific purchase orders governing the 2006 services.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-4: With regard to the relationship between "prompt" fuel prices and futures prices EVA describes as "contango" (Figure 2.3.5), please state when in 2006 NSPI was first aware tha...

AI summary Canada Nova Scotia Electricity Corporation (CA) requested information from Nova Scotia Power Inc. (NSPI) regarding the timing of awareness of 'contango' fuel price conditions in 2006. NSPI responded that it monitors market indices daily and weekly, noting that the contango became pronounced in mid-April 2006. NSPI explained that the market status (contango vs. backwardated) fluctuates based on current market conditions, specifically noting that the contango disappeared by the end of the summer of 2006 as prompt prices rose.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-7: To what extent, if at all, have NSPI fuel procurement decisions in 2006 been affected by considerations of timing related to the potential hiring of fuel procurement personne...

AI summary Canada Nova Scotia Electricity Corporation (CA) provided a formal response to an information request from Nova Scotia Power Inc. (NSPI). In response to Question IR-7, CA stated that NSPI's fuel procurement decisions and portfolio development during 2006 were not influenced by the timing of potential hiring for fuel procurement personnel.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-14: NSPI seeks inclusion in rates fuel costs it does not recover as a result of the operation of the ELIIR-2 RTP. Please show where in the P-883 proceeding NSPI sought this or s...

AI summary Canada Nova Scotia Electricity Corporation (CA) responds to a request from Nova Scotia Power Inc. (NSPI) regarding fuel cost recovery related to the ELIIR-2 RTP. CA argues that the Board's intention for the 2P-RTP rate is to be cost-neutral for all parties. CA supports NSPI's request for a true-up mechanism to ensure that NSPI does not under-recover fuel costs and that other customers are not financially harmed by the operation of the rate, ensuring real cost savings for 2P-RTP customers.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-24: In relation to Figure 2.2, identify all information relating to the NSPI's Fuel Cost Per MWh for the year 2008 and beyond. Response IR-24: NSPI respectfully suggests the inf...

AI summary Canada Nova Scotia Electricity Corporation (CA) requested specific data regarding Nova Scotia Power Inc.'s (NSPI) fuel costs per MWh from 2008 onwards. NSPI responded by stating that information from 2008-2010 is irrelevant to the 2007 test year revenue requirement. NSPI noted that the fuel forecasts used to establish the 2007 revenue requirement are available for inspection at their offices.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-35: In relation to Figure 2.8, identify all information relating to the price of LFO for 2008 and 2009. Please provide an updated Figure to the most current date possible. Respo...

AI summary Canada Nova Scotia Electricity Corporation (CA) requested updated pricing information for Light Fuel Oil (LFO) for the years 2008 and 2009 in relation to a specific figure in the proceeding. Nova Scotia Power Inc. (NSPI) responded by arguing that this information is not relevant to the determination of the 2007 test year revenue requirement, noting that the relevant fuel forecasts for that period are already available.

N-2-dRIRs 1 to 46 - CME to NSPI - REDACTED (Large File - 18 MB) 8 passages
Fuel Procurement
Fuel Procurement NSPI has numerous agreements with banks, other utilities and commodity suppliers. Although the specifics of each agreement may differ, the following implications from a downgrade would be expected: - Counterparties could l...

AI summary Nova Scotia Power Inc. (NSPI) outlines the potential operational and financial impacts of a credit rating downgrade on its fuel procurement activities. Key consequences include reduced credit limits from counterparties, increased costs for securing credit through cash deposits or letters of credit, and the potential termination of existing agreements. Furthermore, a downgrade may lead to some counterparties refusing to conduct business with NSPI due to internal policy restrictions or the availability of more creditworthy alternatives.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CME Question IR-3: Reference Figure 2.1 Figure 2.1 shows a 19.6% increase in load; provide a chart showing the corresponding increase in revenue earned by NSPI from ratepayers broken down by i...

AI summary CME responded to an information request from NSPI regarding Figure 2.1 in a regulatory proceeding. CME clarified that the 19.6% figure mentioned in the query refers to a $19.6 million dollar increase in fuel expense attributable to load growth, rather than a 19.6 percent increase in total load. CME also provided an attachment detailing revenue contributions broken down by individual rate classes.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CME Question IR-5: Reference Page 7, Lines 27-28 Provide a breakdown and detailed explanation of the amounts for change to the fuel mix and associated pricing, including the higher import powe...

AI summary The CME responded to an information request (IR-5) from NSPI regarding the breakdown and explanation of changes to the fuel mix and associated pricing, specifically highlighting higher import power and transportation costs. The response directs the inquirer to specific attachments (11, 13, and 14) from UARB IR-4 for the detailed calculations comparing 2007 figures against 2006C.

Response IR-10: Progress Energy Carolinas (PEC)
Response IR-10: Progress Energy Carolinas (PEC) In June 2006, Progress Energy asked the North Carolina Utilities Commission (NCUC) to approve an increase in the fuel component of the rate. According to the utility, "the primary cause of th...

AI summary The document discusses a 2006 rate request by Progress Energy Carolinas (PEC) to the North Carolina Utilities Commission (NCUC) for an increase in the fuel component of their rates. PEC attributed the request to significant market price increases for coal, natural gas, and oil. While the request resulted in substantial rate increases for residential, commercial, and industrial customers, the NCUC approved the higher fuel charges but opted to spread the costs over time.

Georgia Power
Georgia Power In February 2005, Georgia Power asked for and received a substantial rate increase tied to higher fuel costs (Docket No. 19142, FCR-17). In March 2006 Georgia Power applied for another rate increase tied to fuel costs. (Docke...

AI summary The document outlines the regulatory history of Georgia Power's fuel cost recovery requests between 2005 and 2006. It details a series of rate increase applications (FCR-17, FCR-18, and FCR-19) driven by fuel costs exceeding current recovery levels. Following a partial approval and an order to file more frequently, Georgia Power submitted a significantly higher rate request in November 2006. The text notes that while the company can recover actual costs, the primary driver for these requests is the desire to mitigate projected under-collections.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CME Response IR-10: (cont'd) to press reports, Georgia Power's Comptroller Ann Daiss said that despite recent declines in energy prices, the rate increases are needed because "prices aren't ex...

AI summary CME provides a response to an information request (IR-10) regarding Georgia Power's rate increases. The text cites a report from Georgia Power's Comptroller, Ann Daiss, who argues that rate increases are necessary despite declining energy prices. The justification provided is that falling prices are insufficient to offset other factors governing how the utility utilizes fuel.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CME Question IR-34: Reference Page 6, Lines 11-13 Provide fuel forecasts as to pricing, supply and transportation from all external consultants and other sources (including journals and public...

AI summary In response to Information Request IR-34, Campbell Scott Management (CME) informs Nova Scotia Power Inc. (NSPI) that the fuel forecasts regarding pricing, supply, and transportation—sourced from internal and external entities—are confidential. CME specifies that this information is available for viewing exclusively at NSPI offices.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CME REDACTED Question IR-40: Reference Page 54, Lines 4-6 and Figure 2.7 Provide in d~orting documentation the basis for the assumption__..._ per barrel for HFO. Response IR-40: Please refer t...

AI summary This document is a formal response to Information Request IR-40 from Campbell Scott Management (CME) to Nova Scotia Power Inc. (NSPI). The response directs the reader to confidential documentation (Liberty IR-43) to find the specific calculations, dates, and forward curves used to determine the forecast price per barrel for Heavy Fuel Oil (HFO) in 2007.

N-2-eRIRs 1 to 49 - Liberty to NSPI - REDACTED (Large File - 15 MB) 14 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty Question IR-5: If not contained in the Policies and Procedures Manual, please provide a complete description of the current policies and procedures for fuel hedging. Response IR-5: The...

AI summary Liberty responded to an information request (IR-5) from Nova Scotia Power Incorporated (NSPI) regarding the company's fuel hedging policies. Liberty stated that the complete description of the current policies and procedures for fuel hedging is documented in the Fuel Procurement Policies and Procedures Manual.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty Question IR-7: Please provide the results of any internal or external audits related to fuel procurement conducted in 2005 or in 2006 year to date. Response IR-7: Internal Audit Intern...

AI summary Liberty provided a response to Information Request IR-7 regarding internal audits of fuel procurement for 2005 and 2006. The response details a Coal Inventory Follow-up Audit conducted in 2005, which aimed to verify that management addressed previous control issues regarding the accuracy and valuation of coal inventory and fuel expenses. The audit confirmed that management successfully implemented a new Fuel Management System (Fuelworx) and established monthly inventory review meetings to ensure policy compliance.

Response IR-7: ( cont' d)
Response IR-7: ( cont' d) - Consistency in the conduct of coal pile surveys. The procedures have been reviewed and it has been determined that no material issue exists with the practices in place. No further action is planned. - The use of...

AI summary Nova Scotia Power Incorporated (NSPI) reports on internal audit findings and operational procedures. The company confirmed that coal pile survey procedures are consistent and require no further action. It also noted the adoption of Fuelworx for forecasting starting in 2007. Internal audits of fuel procurement, inventory, and energy marketing have documented sub-processes and completed tests of internal controls over financial reporting, with no material weaknesses identified to date.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty REDACTED Question IR-9: Please provide the Strategist runs used to compute the fuel and purchased power costs for the years 2006 and 2007. Response IR-9: Please refer to Confidential A...

AI summary Liberty provides a response to Information Request IR-9 regarding the calculation of fuel and purchased power costs for 2006 and 2007. The respondent directs the Board to specific confidential attachments containing the Strategist runs. Liberty notes that the results in these reports may not perfectly align with the final Fuel and Purchased Power results due to specific exclusions, such as natural gas sales and other financial accounting adjustments.

Question IR-14:
Question IR-14: Please provide a complete description of all fuel, and fuel transportation procurement in 2005 and 2006 to date. Please include the following information: - a. A copy of the model run used to determine the fuel requirements...

AI summary The Information Request (IR-14) seeks a comprehensive description of fuel and fuel transportation procurement activities from 2005 to the present date. The request specifically asks for model runs for fuel requirements through 2010, solicitation documents (RFPs), vendor lists, and all received responses. Furthermore, it requires the analysis and evaluation of these responses based on delivered cost and lowest cost of electrical energy at the bus-bar, including management recommendations and justifications for any procurement not based on the lowest bus-bar cost.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty Question IR-15: Please provide copies of all of the fuel, and fuel transportation, contracts currently in effect for each type of fuel that have not already been provided in the previo...

AI summary Liberty responded to Information Request IR-15 from Nova Scotia Power Incorporated (NSPI). The request sought copies of all current fuel and fuel transportation contracts for each fuel type not previously disclosed. Liberty indicated that this information is confidential and can be viewed in person at NSPI offices.

NOV A SCOTIA UTILITY AND REVIEW BOARD
NOV A SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: The Public Utilities Act, R.S.N.S. 1989, c.380 as amended IN THE MATTER OF: An Application by Nova Scotia Power Incorporated for Approval of Certain Revisions to its Rates, Charges an...

AI summary Liberty filed a response to Information Request IR-20 regarding open or unresolved fuel contract issues. Nova Scotia Power Incorporated (NSPI) responded that the requested information is confidential and did not provide the specific details in the public filing.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty REDACTED Question IR-24: Please provide sample copies of all fuel procurement or management, and fuel transportation status or management reports used currently. Response IR-24: Please...

AI summary Liberty provided a response to Information Request IR-24 regarding its fuel procurement and management reporting. The response directs the reviewer to eight confidential attachments containing various reports, including monthly performance, annual forecasts, variance analyses, hedging, commodity value at risk, solid fuel inventory, mark-to-market, and daily credit reports.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty Question IR-28: By fuel utilized for power generation, for each fuel utilized, and for each generating station, what does NSPI expect through 2010 in terms of the following parameters:...

AI summary Liberty submitted a response to Information Request 28 (IR-28) regarding Nova Scotia Power Incorporated's (NSPI) expectations for fuel parameters through 2010. The request sought detailed data on unit prices, quantities, suppliers, supply regions, and transportation costs for various fuels used in power generation. However, Liberty subsequently withdrew the question, meaning no specific data or analysis was provided in this response.

Response IR-35 (cont'd):
Response IR-35 (cont'd): For the 2007 test year, NSPI used the forward price curve for HFO and natural gas adjusted for delivery costs, handling costs and foreign exchange rates. These fuel prices were entered in the Strategist model which...

AI summary Nova Scotia Power Incorporated (NSPI) describes its methodology for the 2007 test year regarding fuel procurement at the Tufts Cove generating station. The company utilized a forward price curve for Heavy Fuel Oil (HFO) and natural gas, adjusted for delivery, handling, and foreign exchange rates. These prices were integrated into the Strategist model to determine monthly fuel consumption for Units 1, 2, and 3, while identifying the remaining volume of contracted natural gas available for sale.

NOV A SCOTIA UTILITY AND REVIEW BOARD
NOV A SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: The Public Utilities Act, R.S.N.S. 1989, c.380 as amended IN THE MATTER OF: An Application by Nova Scotia Power Incorporated for Approval of Certain Revisions to its Rates, Charges an...

AI summary Liberty submitted a response to Information Request 38 (IR-38) regarding Nova Scotia Power Incorporated's application for rate revisions. The response directs the Board to a confidential attachment containing the forecasted 2006 solid fuel ending inventory quantities. These figures, which include tonnes, costs, and BTU content, were used to develop the solid fuel costs for the beginning of the 2007 test year, including calculations relating them to the last known inventory quantities.

Question IR-43:
Question IR-43: Figures 2.7 through 2.9, and Figure 2.12 of the Notice of Application and Direct Evidence of NSPI present changes in fuel costs between 2006C and 2007. Please provide the substantiating detail for each of these four figures...

AI summary The regulator is requesting detailed substantiating data from Nova Scotia Power Incorporated (NSPI) regarding fuel cost changes between 2006C and 2007 as presented in their Notice of Application and Direct Evidence. The request seeks specific breakdowns for committed and uncommitted fuel quantities, including supplier details, pricing (total dollar and dollars/MMBTU), sulfur content, and transportation components. It also requires correlation analysis with previous figures, currency confirmation, forecast dates, and data sources.

Question IR-44:
Question IR-44: Figure 2.2 of The Notice of Application and Direct Evidence of NSPI presents NSPI fuel costs per MWh for the years 2001 through 2007. Please provide the substantiating detail for the fuel costs for each of the years 2005, 2...

AI summary The regulator is requesting substantiating details from Nova Scotia Power Incorporated (NSPI) regarding fuel costs per MWh for the years 2005, 2006C, and 2007F. The request specifies a breakdown of components including import and domestic coal, pet-coke, oil, natural gas, purchased power, and transportation costs. Additionally, NSPI must demonstrate how the 2006 coal disallowance was factored in and correlate these historical figures with current and forecasted fuel and purchased power expenses.

Response IR-44:
Response IR-44: Please refer to Confidential Attachment 1 for the fuel costs for 2005, 2006C, and 2007 on a $/MWh basis and a total dollar basis for items a. through g.

AI summary Nova Scotia Power Incorporated (NSPI) provided a response to Information Request 44, directing the Board to Confidential Attachment 1 for specific data. The attachment contains fuel cost information for the years 2005, 2006C, and 2007, broken down by $/MWh and total dollar amounts for items a. through g.

N-2-fRIRs 50 to 81 - Liberty to NSPI - REDACTED (Large File - 16 MB) 5 passages
The data sources are as follows.
The data sources are as follows. Figure Data Source EVA averages of weekly data on West Texas Intermediate reported in Petroleum 2.3.1 Intelligence Weekly Data is complied by EVA from the U.S. Department of Energy, International Energy 2.3...

AI summary The document outlines various data sources used for energy and fuel price averages, including sources such as Petroleum Intelligence Weekly, Natural Gas Week, and internal NSPI data, as well as external reports and indices like the Baltic Indices.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty REDACTED Question IR-66: Please provide fuel-quantity information, in heat content (MMBtu) and physical units (Mcf of natural gas, metric tonnes of coal, etc.) for each source of energ...

AI summary The response to information request IR-66 provides fuel-quantity information for four different cases (2005, 2006, and 2007 forecasts) in terms of heat content and physical units, with monthly and annual summaries. The response directs the requester to confidential attachments for detailed data.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty REDACTED Response IR-66: (cont'd) Appendix A, Table 8 of the Direct Evidence provides both actual and forecasted fuel costs separated by fuel consumption for domestic and export load p...

AI summary The response to an information request by NSPI explains that export sales volumes are tracked and reported in MWh only, and provides references to confidential attachments containing detailed export sales volumes and associated costs for various years.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty REDACTED Question IR-68: Please provide delivered price information ($/MMBtu and $/physical unit) for each source of energy consumed and sold for each of those same four cases. For hed...

AI summary Liberty REDACTED responds to an information request from NSPI, directing them to refer to a prior document for unit pricing and providing details on financial hedges for specific years, including commodity, volume, fixed price, and realized or mark-to-market gains or losses.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty Question IR-79: As it relates to the desirability of adopting a F AM, please describe any change in the position taken by the Company in the prior rate proceedings. Response IR-79: The...

AI summary In response to an information request, the Company reaffirms its position that a Fuel Adjustment Mechanism should be implemented, maintaining its stance from prior rate proceedings.

N-2-fRIRs 1 to 18 - MEUNSC to NSPI - REDACTED 8 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: MEUNSC Question IR-1: Reference: Direct Evidence Page 8, Lines 3-5 "additional load adds $19.6 million to NSPI's overall fuel costs" What portion of this fuel cost increase is offset by revenu...

AI summary The Nova Scotia Power Inc. (NSPI) responded to an information request from the Maritime Energy Users Notice Committee (MEUNSC) regarding the specific portion of a $19.6 million fuel cost increase that is offset by revenue from additional sales. The response directs the inquirer to a previous response provided to the Chamber of Manufacturers and Exporters (CME).

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: MEUNSC Response IR-2: (cont'd) The avoided unit cost savmgs of a 15MW decrement should ordinarily be considered to be greater than the avoided unit cost savings of a 25 decrement under economi...

AI summary The Maritime Energy Users Notice Committee (MEUNSC) provides a response to an information request regarding Nova Scotia Power Inc.'s (NSPI) Load Following rate calculations. MEUNSC argues that a 15MW decrement should yield higher avoided unit cost savings than a 25MW decrement under economic merit-order dispatch. They also clarify that NSPI adjusts the GRLF 25MW decremental costs to exclude natural gas trading activities to protect in-province customers from short-term negative effects on marginal costs.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM:MEUNSC REDACTED Question IR-3: Reference: Direct Evidence Page 183, Quarter 1 Fuel Deferral - a. The evidence indicates that, absent some UARB directives, most notably ELLIR-2, the current rate...

AI summary The Maritime Energy Users Notice Committee (MEUNSC) submitted a response to an information request regarding Nova Scotia Power Inc.'s (NSPI) fuel deferral proposal. The committee seeks clarification on the timing of rate applications in light of government restrictions on annual increases, the composition of the $18.3 million estimate (price vs. volume variance), and the specific production sources for hydro and other components. Additionally, the committee questions whether the deferral proposal functions as a de facto Fuel Adjustment Mechanism.

Response IR-3: (cont'd)
Response IR-3: (cont'd) - c. Confidential Attachment 1 provides the Q 1 production data for the first quarter of 2006 (actual data) and 2007 (forecast data). - d. No. The 2007 first quarter fuel cost deferral recovers a defined increase in...

AI summary The Maritime Energy Users Notice Committee (MEUNSC) argues that the 2007 first quarter fuel cost deferral is appropriate because it recovers a defined increase in fuel costs for a specific period. They distinguish this from a Fuel Adjustment Mechanism (FAM), which would provide regular, ongoing rate adjustments. The Committee asserts that the Company has a legitimate right to recover prudently incurred fuel expenses as a cost of service.

Response IR-11:
Response IR-11: - a. Please refer to Confidential Attachment 1. - b. Exhibit 6, page 3 of 4 has been reproduced in Confidential Attachment 2, showing monthly fuel allocation, annual energy requirement fuel allocation, variance and the E-lA...

AI summary The respondent provides information regarding fuel allocations and variance analysis in response to Information Request IR-11. The response directs the reader to Confidential Attachment 1 and provides a reproduction of Exhibit 6 in Confidential Attachment 2. This data specifically details monthly fuel allocation, annual energy requirement fuel allocation, variance, and the E-lA allocator utilized for A TL customer classes.

Question IR-13:
Question IR-13: Reference: Direct Evidence Page 63, Lines 12-15 "Load growth has significantly increased the marginal cost of electricity and is responsible for a significant portion of overall fuel cost increases in 2007." (emphasis added...

AI summary The Information Request (IR-13) seeks clarification on the relationship between load growth and escalating electricity costs. Specifically, it requests details on efforts to mitigate these costs through demand-side management (DSM), energy conservation, and pricing strategies during the current test period. It further asks for projections on whether the 2% annual increase requirement will persist and requests identification of the primary sources driving current load growth.

Question IR-17: Reference: Direct Evidence Page 1218, Regulatory Risk
Question IR-17: Reference: Direct Evidence Page 1218, Regulatory Risk - a. Please indicate the impact on the "regulatory lag" aspect of this risk component of the recent UARB decision to defer the 2005 Quarter 1 tax impacts; and, if approv...

AI summary The text addresses regulatory risks associated with Nova Scotia Power Inc.'s (NSPI) proposal to defer $18.3 million in fuel costs for recovery in 2008. It specifically questions how the UARB's decision to defer 2005 tax impacts affects 'regulatory lag' and whether this fuel cost deferral provides protection against credit rating downgrades. Additionally, it seeks clarification on how periodic rate increases under a Fuel Adjustment Mechanism (FAM) would be permitted given legislative restrictions on the frequency of rate increases.

Response IR-17: (cont'd)
Response IR-17: (cont'd) c. Bill 20 restricts rate increases from general rate applications to no more than one per 12-month period. It does not prohibit the UARB from approving a FAM, which is not a general rate mcrease. DATE FILED: Novem...

AI summary The response clarifies the interpretation of Bill 20 regarding rate increases. It specifies that while Bill 20 restricts general rate applications to one per 12-month period, it does not prohibit the Utility and Rate Board (UARB) from approving a Fuel Adjustment Mechanism (FAM), as the FAM is categorized as something other than a general rate increase.

N-2-fRIRs 1 to 29 - SEB to NSPI - REDACTED 6 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB REDACTED Question IR-1: In Section 1.1, it is stated that the fuel forecast for 2007 is $68.5 million higher than the fuel amount currently provided for in rates. Please indicate the actua...

AI summary The document is a formal response to an information request regarding fuel cost discrepancies. The respondent (SEB) directs the requester (NSPI) to another information request (DARB IR-4) to obtain specific data regarding the 2006 fuel cost estimates, the amount currently provided for in rates, and the commodity-by-commodity price exceedances for coal, petroleum coke, oil, and natural gas.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB Question IR-2: Please provide a breakdown of the increase in solid fuel costs from 2006 to 2007 by: a. petroleum coke; b. low sulphur coal; c. medium sulphur coal; d. high sulphur coal. Pl...

AI summary The System Evaluation Board (SEB) provided a response to an information request from Nova Scotia Power Inc. (NSPI) regarding the breakdown of solid fuel cost increases between 2006 and 2007. The response directs the reader to specific attachments for an analysis of petroleum coke and various sulphur coal types (low, medium, and high). It specifically highlights that a $15.7 million import coal disallowance from 2006 was arbitrarily allocated to the delivered price of 2006 forecast import coal costs.

Response IR-5: (cont'd)
Response IR-5: (cont'd) The average of the high and low prices for fro om Wa as Using the forecast pricing for the uncommitted mid sulphur coal volumes, the FOB petroleum coke price at which NSPI would switch from petroleum coke to mid sul...

AI summary Nova Scotia Power Inc. (NSPI) provides technical details regarding its fuel switching analysis. The text discusses the price point at which the utility would transition from using petroleum coke to mid-sulfur coal, based on forecast pricing for uncommitted volumes.

Preamble
These two price points were used to determine the FOB US Gulf price at which NSPI would buy petroleum coke. Whereas petroleum coke is typically purchased on a delivered basis, a marine freight rate of was applied to the FOB price. The deli...

AI summary The text describes the methodology used to determine the delivered price of uncommitted petroleum coke for Nova Scotia Power Inc. (NSPI). It explains that the price is calculated by applying a marine freight rate to a FOB US Gulf price, despite petroleum coke typically being purchased on a delivered basis. The passage also notes the inclusion of the exchange rate in the final delivered Nova Scotia price calculation.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB REDACTED Question IR-16: Response IR-16: The increase in high sulphur coal usage in 2007 compared with 2006 is a function of the high price of petroleum coke. Petroleum coke has traditiona...

AI summary The System Evaluation Board (SEB) responded to an information request regarding the increase in high sulphur coal usage between 2006 and 2007. The SEB attributes this shift to the significantly high market prices of petroleum coke, which were driven by market factors including the 2005 hurricane season. Consequently, high sulphur coal became a more economically viable alternative to petroleum coke, which is traditionally sourced from U.S. Gulf and Great Lakes refineries.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB Question IR-25: Please explain and reconcile the apparent difference between the monthly HFO and Natural Gas prices shown in Figure 2.6 and the seemingly lower prices for these fuels that...

AI summary The System Evaluation Board (SEB) requested a reconciliation between different price figures for Heavy Fuel Oil (HFO) and natural gas provided in the filing. Nova Scotia Power Inc. (NSPI) clarified that Figure 2.6 shows monthly market prices derived solely from forward curves without considering inventories or contracts. In contrast, Figures 2.7 and 2.9 reflect annual forecasted consumed prices, which incorporate opening inventories, financial hedges, contract pricing, and specific forecasted consumption volumes for various generating plants.

N-2-fRIRs 1 to 10 - NSDOE to NSPI - REDACTED 5 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: NSDOE Question IR-3: Please provide fuel prices ($/MMBtu) and consumption (actual to date and forecasted), by type and plant, for the period Jan 1st, 2006 through Mar 31st, 2008? Response IR-3...

AI summary The Nova Scotia Department of Energy (NSDOE) responded to an information request (IR-3) regarding fuel prices and consumption data for the period between January 1, 2006, and March 31, 2008. The response directs the requester to specific attachments within a previous information request (Liberty IR-10) to find the forecasted fuel consumption volumes and costs categorized by plant for the years 2006 and 2007.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: NSDOE Question IR-4: With reference to Page 7, Figure 2.1, NSPI Direct Evidence. - a. What amount of the $19.6 million increase between 2006C and 2007F for fuel and purchased power for Load In...

AI summary The Nova Scotia Department of Energy (NSDOE) is requesting specific information from Nova Scotia Power Inc. (NSPI) regarding fuel and purchased power costs. The inquiry focuses on a $19.6 million increase between 2006C and 2007F attributed to Load Increase, specifically seeking to isolate the portion related to the Stora operating at full capacity in 2007. Additionally, NSDOE requests clarification on the recovery of these costs under current rates and an explanation for a $40.1 million increase in commodity costs relative to 2006.

since 2006C.
since 2006C. Forecast 2006C Forecast 2007 FX Rate $1.219 $1.180 USD Requirement ($Millions) Change in Fuel Costs (CAD$Millions) NOV A SCOTIA UTILITY AND REVIEW BOARD

AI summary The provided text is a fragment from a Nova Scotia Utility and Review Board proceeding. It contains a table header for financial forecasts spanning 2006C and 2007, specifically tracking foreign exchange (FX) rates, USD requirements, and changes in fuel costs. The text does not contain substantive narrative or arguments.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: NSDOE Question IR-9: With reference to Page 8, lines 7 through 12, NSPI Direct Evidence. Is the $6.4 million reduction in the natural gas resale margin for 2007 net of savings resulting for bu...

AI summary The Nova Scotia Department of Energy (NSDOE) responded to an Information Request (IR-9) regarding Nova Scotia Power Inc.'s (NSPI) direct evidence. The response clarifies that a $6.4 million reduction in the natural gas resale margin for 2007 was not net of savings from burning natural gas at Tufts Cove instead of oil. The department notes that the projected increase in natural gas consumption of 9,321,000 MMBtu was driven by a combination of increased load and the economic dispatch of natural gas over Heavy Fuel Oil (HFO).

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: NSDOE Question IR-10: What are the projected incremental fuel costs to meet the more stringent 2005 S02 compliance requirements through fuel switching strategies for 2006 and 2007? Response IR...

AI summary Nova Scotia Power Inc. (NSPI) provided a response to an Information Request from the Nova Scotia Department of Energy (NSDOE) regarding the projected incremental fuel costs for meeting 2005 S02 compliance requirements. NSPI estimates the compliance costs to be $18 million for 2006 and $8 million for 2007. The response notes that these costs are subject to change based on market and operating conditions, specifically highlighting the narrowing price gap between high and low sulphur fuels in 2007.

N-2-gRIRs 30 to 91 - SEB to NSPI - REDACTED (Large File - 29 MB) 9 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB REDACTED Question IR-32: Response IR-32: The number of tonnes of solid fuel required for 2007 tonnage for any of the other years shown on Figure 2.3, because of the anticipated gross calor...

AI summary The response explains that the number of tonnes of solid fuel required for 2007 tonnage depends on the anticipated gross calorific value (GCV) of the fuels consumed in each year, with higher Btu content per pound of fuel requiring fewer tonnes to meet the overall Btu requirement.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB REDACTED Question IR-36: Table 16 of Appendix A shows - What are the associated volumes of fuel, by type, associated with this amount? Response IR-36: The associated volumes of fuel, by ty...

AI summary In response to an information request, the associated fuel volumes by type are provided, including solid fuel (coal), heavy fuel oil, and diesel.

Response IR-40: (cont'd)
Response IR-40: (cont'd) commodity cost, associated marine freight, unloading fees and other miscellaneous costs incurred at the time of loading and unloading. Confidential Attachment 3 is a report that details the receipts of solid fuel t...

AI summary The document details the costs associated with the receipt of solid fuel at multiple generating stations in Nova Scotia, including freight, handling, and unloading expenses. Confidential attachments provide detailed breakdowns for each location, such as Lingan, Pt Aconi, Pt Tupper, and Trenton 5 Generating Stations.

Response IR-45:
Response IR-45: Confidential Attachment 1 provides financial commitments as of September 30, 2006 for fuel burn requirements for 2007. Confidential Attachment 2 provides the current 2007 physical commitments for solid fuel, natural gas and...

AI summary The response includes two confidential attachments that outline financial and physical fuel commitments for 2007, including solid fuel, natural gas, and HFO.

Response IR-46:
Response IR-46: a-e. Confidential Attachment 1 provides financial commitments as of September 30, 2006 for fuel bum requirements for 2008. Confidential Attachment 2 provides the current 2008 physical commitments for solid fuel, natural gas...

AI summary Confidential attachments provide financial and physical commitments related to fuel requirements for 2008, including solid fuel, natural gas, and HFO.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB Question IR-68: Please provide all supporting workpapers and calculations developing the allocation of fuel costs shown on Exhibit 6, page 3, including all electronic spreadsheets with for...

AI summary SEB responds to an information request (IR-68) from NSPI by referring them to SEB IR-66 for supporting workpapers and calculations related to the allocation of fuel costs shown on Exhibit 6, page 3.

Question IR-75:
Question IR-75: In its Application, NSPI seeks approval to defer, for subsequent recovery in 2008, the difference between actual fuel costs and approved fuel costs during the period January 1, 2007 through April 1, 2007, which it estimates...

AI summary NSPI is requesting approval to defer $18.3 million in fuel cost differences from January to April 2007 for recovery in 2008. The Board is being asked to provide calculations for the deferral, explain the method for calculating it for the first three months of 2007, and estimate the deferral account balance as of January 1, 2007, assuming a similar mechanism was approved for 2006.

Response IR-75:
Response IR-75: - a. Please refer to Attachment 1. - b. NSPI proposes that the deferral be calculated by multiplying the average annual increase in fuel expense per MWh in 2007 (based upon a total test year increase of $68.5 million) by th...

AI summary NSPI proposes a method for calculating a deferral based on the average annual increase in fuel expense per MWh in 2007 and the forecasted Q1 2007 load, and notes that a deferral was unnecessary for 2006 due to the request for rates to be effective January 1.

Nova Scotia Power Fuel Expense
Nova Scotia Power Fuel Expense Total 2006C Fuel expense Load FuelperMWh 430,235 12,947.9 $ 33 .23 Total 2007RC Fuel expense Load FuelperMWh 498,724 13,059.1 $ 38.19 CHANGE $ 4.96 Q 1 load forecast 3,682.2 18,270 NOV A SCOTIA UTILITY AND RE...

AI summary The text provides a table showing Nova Scotia Power's fuel expense data for 2006C and 2007RC, including fuel expense per MWh and changes in cost. It also references the Nova Scotia Utility and Review Board, indicating regulatory oversight.

N-2-gRIRs 1 to 25 - Stutz to NSPI - REDACTED (Large File - 18 MB) 3 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Stutz Question IR-2: Reference DE, page 2, Lines 21 to 22 How much of the incremental $68.5 million in fuel and purchased power costs is due to the increase in generation assumed for 2007F? Pr...

AI summary The document is a response to an Information Request (IR-2) from a representative named Stutz addressed to Nova Scotia Power Inc. (NSPI). The inquiry seeks to quantify how much of an incremental $68.5 million in fuel and purchased power costs is attributable to the increase in generation assumed for the 2007F period. The response directs the requester to specific attachments (1 through 14) within the UARB IR-4 filing for the supporting calculations.

Rationale
ity is not subject to an annual review. Although NSPI has some limited exposure to the pulp and paper sector, it serves a predominantly residential customer base in a mature market with modest growth. NSPI's credit strengths are partially...

AI summary The text analyzes Nova Scotia Power Inc.'s (NSPI) credit profile, noting that while it serves a stable residential base, it faces significant financial risks. These risks stem from the utility's heavy reliance on fossil fuel-fired generation (coal, pet-coke, and gas) and the potential for large variances between actual fuel expenses and regulated rates. The analysis highlights that the regulator's 2006 decision regarding fuel procurement strategy may increase regulatory risk, particularly during periods of low hydrology.

2007 Financial Outlook
2007 Financial Outlook 1 (1) (2) (3) (4) (5) (6) (7) (8) 2 Table 8 Compliance Rates Test Proposed Rates Test Year Actual 2001 Actual 2002 Actual 2003 Actual 2004 Actual 2005 Forecast 2006 Year Forecast 2006 Forecast 2007 3 Fuel By Type 4 C...

AI summary The document presents a financial outlook for 2007, primarily detailing fuel and purchased power costs from 2001 to 2005. It breaks down generation costs by fuel type (e.g., coal, petcoke, natural gas, bunker C) and purchased power sources (imports and independent power producers). The data highlights a significant increase in total fuel and purchased power costs in 2005, reaching $373.6 million, with a corresponding rise in the total fuel cost per MWH to $29.93.

N-7-aRIRs 85 to 104 [105 to 107 (Filed 03/05/2007)] - NSUARB to NSPI - REDACTED 4 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB REDACTED Question IR-91: Direct evidence, page 8, lines 3-5 indicates that the increased load adds $19.6 million to NSPI's overall fuel costs. Response to UARB IR-Attachment 11, page 1 in...

AI summary The response explains that the $19.6 million increase in fuel costs includes changes from fuel switching and credits for heat rate improvements due to increased load, as detailed in a table.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB Question IR-92: Reference Board StaffiR-1 Please provide an update of Figure 9.1 (page 168) using the ELI-2P- RTP rates approved by the Board in P-883, i.e 55.06 $/MWh for energy. Respons...

AI summary The UARB responds to NSPI's request for an updated figure using ELI-2P-RTP rates approved by the Board in P-883. The response notes that the figure is based on the Standard Energy Charge only and does not account for net credits or increased fuel costs. NSPI has requested a true-up mechanism to align net credits with actual costs.

Response IR-104: (cont'd)
Response IR-104: (cont'd) hedged positions that NSPI has put in place as part of its fuel portfolio strategy. In addition to updating commodity prices, NSPI revised the load shape based on the requirements associated with the new ELI 2P-RT...

AI summary NSPI has updated commodity prices and revised the load shape as part of its fuel portfolio strategy, specifically in response to the requirements of the new ELI 2P-RTP rate.

A summary of the changes is highlighted below:
A summary of the changes is highlighted below: Fuel Forecast- October Filing $498.7M Load and Generation Mix (CBL) 2.6 Commodity Pricing Changes Coal pricing, net (3.1) HFO (7.7) Natural Gas (NG), Bum (6.6) Diesel (3.6) Import Power (0.4)...

AI summary The document highlights changes in fuel forecasts, including adjustments to coal, HFO, natural gas, and diesel pricing, as well as transportation costs. The total fuel forecast adjustment is reported as $490.6M after updates.

N-7-aRIRs - AVON [et al] to NSPI - RIR 67 to 76 - REDACTED 3 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Avon REDACTED Question IR-72: Please indicate what steps NSPI is taking to extricate itself from the "U.S. coal pricing trap" for coals out of South America. How effective have such measures,...

AI summary In response to an information request regarding the "U.S. coal pricing trap," Nova Scotia Power Inc. (NSPI) clarifies that it cannot identify the specific source of that quote. However, NSPI interprets the question as referring to the "North American premium." This premium is the difference between the netback price of South American coal (the European ARA price minus freight) and the higher price that South American producers can command from North American customers.

Table 1 - Heavy Fuel Oil Prices paid or forecasted by NSPI
Table 1 - Heavy Fuel Oil Prices paid or forecasted by NSPI Actual Forecast ($/bbl USD) 2006 2007 January February March April May June July August September October November December Note: \ \ -no oil consumed during this period.

AI summary The document contains a table placeholder for Heavy Fuel Oil (HFO) prices paid or forecasted by Nova Scotia Power Inc. (NSPI) for the year 2007, broken down by month. A note indicates that no oil was consumed during the specific period being referenced in the table's context.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Avon REDACTED a. DATE FILED: December 6, 2006 Question IR-74: Reference: Application, Page 8, Line 3 In 2007, load is forecast to be 1 percent higher than 2006c....This additional load adds mi...

AI summary Avon submitted a response to Information Request IR-74 regarding Nova Scotia Power Inc.'s (NSPI) load forecasts and fuel costs for 2007. Avon sought clarification on the specific gigawatt-hour (GWh) increase in load and the associated incremental fuel costs. NSPI responded that the actual load increase is 0.92% (118,889 MWh) rather than the 1% previously cited. NSPI also referenced a previous information request (Liberty IR-86) to address the specific costs of serving the additional load.

N-7-aRIRs 47 to 67 - CME to NSPI - REDACTED 6 passages
If Flatline Loadshape is used in Fuel Cost Determination
If Flatline Loadshape is used in Fuel Cost Determination Using a flat line load shape to calculate actual SEB related fuel costs for 2007, the true-up need only address any differences between the net credits paid to SEB and NSPI's net avo...

AI summary The text discusses the methodology for calculating fuel cost true-ups when a flat line load shape is utilized in fuel cost determination for 2007. It specifies that for load decrements, Nova Scotia Power Inc. (NSPI) would determine savings by comparing the Customer Baseline Loadshape (CBL) against actual loads using the same generation dispatch order as the 2P-RTP 20-minute-ahead marginal cost. For load increments, the calculation would focus on the actual incremental cost of serving load exceeding the CBL.

If Flatline Loadshape is not used in Fuel Cost Determination
If Flatline Loadshape is not used in Fuel Cost Determination Failing to use flat line load shapes in calculating the fuel costs, or not providing for some other means of incorporating these costs into NSPI' s approved revenue requirement,...

AI summary The text addresses the regulatory requirement for including fuel costs in the true-up calculation if flat line load shapes are not utilized in the initial fuel cost determination. It asserts that if NSPI's approved revenue requirement does not account for these specific costs through an alternative mechanism, they must be captured during the true-up process to ensure accurate cost recovery.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CME Question IR-53: Reference CA- IR-24 Considering that fuel procurement is based on a portfolio with varying terms, capital and other costs amortized over periods of time, etc., it is respec...

AI summary In response to an Information Request (IR-53) regarding the factors influencing fuel cost per MWh, Canadian Mineral Exploration (CME) requested details on how future fuel procurement terms, capital costs, and amortization might affect the 2007 test period. Nova Scotia Power Inc. (NSPI) responded by directing the reviewer to Section 2 of their Direct Evidence, 'Fuel and Purchased Power,' and stated that specific factors regarding future years will be addressed in subsequent applications as necessary.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CME Question IR-58: Reference SEB- IR-16 Due to the lack of negative impact for the 2006 hurricane season and its potential impact in softening prices (e.g. petroleum coke), to what extent can...

AI summary In response to an information request regarding high sulphur coal usage, Nova Scotia Power Inc. (NSPI) clarifies that its current usage is based on 2007 modeling assumptions. While factors such as hurricanes, demand fluctuations, and relative pricing of gas versus oil can influence the fuel mix, NSPI notes that a fuel adjustment mechanism is designed to reflect these variations in costing. The response also highlights that petroleum coke prices are currently at an all-time high.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CME Question IR-61a: Reference Liberty - IR-41 Based on the list provided, what publications and journals does NSPI primarily rely upon and/or use the most and which have historically provided...

AI summary Canadian Mineral Exploration (CME) responded to an Information Request from Nova Scotia Power Inc. (NSPI) regarding the publications and journals the utility relies on for fuel pricing. CME clarified that NSPI uses various publications to obtain historical data, index values, spot prices, commodity futures, and market commentary. The specific publication used depends on the individual undertaking, as different sources are required for different types of fuel pricing and shipping information.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CME Question IR-61b: Reference Liberty- IR-77 Why does NSPI not hedge LFO? Response IR-61b: NSPI has not hedged Light Fuel Oil (LFO) as the volume required can be highly variable. LFO is used...

AI summary In response to an information request, CME clarifies that Nova Scotia Power Inc. (NSPI) does not hedge Light Fuel Oil (LFO) because the required volume is highly variable. LFO is primarily used for combustion turbine units, which serve as peaking units. The consumption volume of LFO is subject to fluctuations based on customer load, external market conditions, and the application of specific rates such as the 2P-RTP.

N-7-bRIRs 82 to 106 - Liberty to NSPI - REDACTED 8 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty Question IR-83: With respect to Liberty IR-3, please provide Liberty with a hard copy of the Fuel Procurement Policies and Procedures Manual. Response IR-83: This confidential informat...

AI summary Liberty requested a hard copy of the Fuel Procurement Policies and Procedures Manual in response to IR-83. NSPI informed Liberty that the confidential information can be viewed at their offices.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty REDACTED Question IR-85: With respect to Liberty IR-81, part b: Response IR-85: As outlined in NSPI' s Fuel Procurement Policies and Procedures Manual Section 1.1, NSPI's objective is...

AI summary NSPI's fuel procurement strategy involves maintaining a diversified portfolio of long, medium, and short-term agreements to mitigate market volatility through staggered expiration dates, volume options, and varied pricing mechanisms.

Compliance is achieved when the percentage of solid fuel contracted under given terms (i.e. long, medium and short term) is structured within the parameters of the portfolio strategy.
Compliance is achieved when the percentage of solid fuel contracted under given terms (i.e. long, medium and short term) is structured within the parameters of the portfolio strategy. term contract is defined as a contract which has a term...

AI summary Compliance is determined by the percentage of solid fuel contracted under long, medium, and short-term agreements that align with the portfolio strategy. A table defines term contracts and references a confidential attachment outlining the solid fuel portfolio from 2006.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty Question IR-86: Liberty Question IR-9 sought the Strategist runs used to compute fuel and purchased power costs for the years 2006 and 2007. The response noted that Strategist did not...

AI summary Liberty requested workpapers and analyses for fuel and purchased power costs from 2006 and 2007, excluding those addressed by Strategist. NSPI responded that the confidential information is available for viewing at their offices.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty REDACTED Question IR-90: With respect to Liberty IR-24, the NSPI response provided information through September 2006. Please provide an update to all of the reports in the original re...

AI summary The response to an information request from Liberty REDACTED asks NSPI to update previous reports through the most recent month. It also inquires about the difference between budgets and forecasts, particularly regarding fuel and purchased power expenses. NSPI explains that it uses a static annual fuel budget for comparison, while forecasts are periodically updated throughout the year.

Heavy Fuel Oil versus Natural Gas Burn at Tufts Cove
Heavy Fuel Oil versus Natural Gas Burn at Tufts Cove 2007 Heavy Fuel Oil Natural Gas Fuel Burned Forward Price Curve Forward Price Curve Tufts Cove (Units 1, 2, 3) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec NOV A SCOTIA UTILITY AND RE...

AI summary The document presents a table comparing the forward price curves of Heavy Fuel Oil and Natural Gas for the year 2007, specifically for Tufts Cove Units 1, 2, and 3. However, the table lacks specific data entries, and the section title indicates a focus on fuel cost comparisons.

Question IR-102:
Question IR-102: Further, regarding the Company's response to Liberty IR-35, how much of a difference between the adjusted (delivered) prices of the alternate fuels (HFO and natural gas) is required to induce the Company to switch? - a. Pl...

AI summary The company does not have a fixed price difference that triggers a fuel switch. Multiple factors are considered in the decision-making process, including various costs associated with switching fuels.

Response IR-102: (cont'd)
Response IR-102: (cont'd) - h Dlagga rafar to Con fidential ATTON ID 71 1). FICASC I CI CI II Huchita AVOII 117-/1. c. NSPI's out the cost of generation for dispatch purposes daily. The market price of natural gas and the market price of h...

AI summary NSPI calculates the cost of generation for dispatch purposes daily, using market prices for natural gas and heavy fuel oil to determine production costs at Tufts Cove. The Team Lead, Scheduling and Operations provides these numbers daily, and the gas marketer uses them to assess fuel switch opportunities.

N-7-bRIRs 142 to 143 - SEB to NSPI - REDACTED (Large File - 45 MB) 6 passages
2005 Earnings Hard Hit by NSPI Fuel Costs
2005 Earnings Hard Hit by NSPI Fuel Costs - NSPI's rising fuel costs only partially offset with 5.3% rate increase - Contributions from Other mitigate impact on EMA: - Increased Energy Services activity - Addition of Bear Swamp - Lower cor...

AI summary The document highlights that Nova Scotia Power Inc. (NSPI) experienced significant earnings pressure in 2005 due to rising fuel costs, which were only partially mitigated by a 5.3% rate increase. However, Emera (EMA) was able to offset some of these impacts through increased Energy Services activity, the addition of Bear Swamp, and a reduction in corporate costs.

Advancing Regulatory Relationships
Advancing Regulatory Relationships - Success in Nova Scotia and Maine resolving many regulatory issues - But Nova Scotia's recent rate applications less than satisfactory - Commodity prices and taxes drive 2002, 2005, and 2006 requests - R...

AI summary The text discusses the current state of regulatory relationships in Nova Scotia, noting that while successes have been achieved in resolving issues with Maine, recent rate applications have been less than satisfactory. The primary sources of regulatory dissatisfaction are attributed to commodity prices and taxes, specifically regarding fuel procurement. The document highlights a proposed average increase of 15% for 2006, reflecting the ongoing challenges in balancing rate requests with regulatory expectations.

NSPI has:
NSPI has: - ✓ Consolidated responsibility for fuel procurement - ✓ Changed the fuel buying strategy team at Nova Scotia Power to remove any conflict between NSPI and Emera - ✓ Strengthened the company's in-house expertise on fuel - Revised...

AI summary Nova Scotia Power Inc. (NSPI) has restructured its fuel procurement processes to enhance transparency and operational efficiency. Key actions include consolidating responsibility for fuel procurement, restructuring the fuel buying strategy team to eliminate potential conflicts of interest with its parent company, Emera, and increasing in-house expertise. Additionally, NSPI has revised fuel buying policies to adopt a portfolio approach and secured longer-term contracts for cleaner, low-sulphur coal.

Nova Scotia Power
Nova Scotia Power - Vertically integrated electric utility - Traditional regulated monopoly - Wholesale market competitive, <2% of sales - Cost of service regulation - $3B assets; 470,000 customers - ROE between 9.3% and 9.8% - Low cost th...

AI summary Nova Scotia Power is described as a vertically integrated, traditional regulated monopoly electric utility with $3B in assets serving 470,000 customers. The utility operates under a cost-of-service regulatory model, maintaining a return on equity (ROE) between 9.3% and 9.8%. It benefits from a low-cost thermal-based fleet that facilitates competitive pricing. The utility is noted for improving its regulatory relationship and is currently working toward implementing a fuel adjustment mechanism.

Challenges
Challenges Consistency of returns, largely due to combination of fuel risk and regulatory lag

AI summary The document identifies the consistency of returns as a primary challenge for the utility. This issue is attributed to two main factors: the inherent risks associated with fuel price fluctuations and regulatory lag, which can create a mismatch between the timing of costs incurred and the timing of their recovery through regulated rates.

Improving Returns at NSPI
Improving Returns at NSPI - Reducing fuel price risk key to improving consistency of returns - Two stage process - Ensure rates reflect full fuel costs - 2007 rate application in process - Advance automatic fuel cost pass-through - Impleme...

AI summary Nova Scotia Power Inc. (NSPI) outlines a two-stage strategy to improve the consistency of its returns by mitigating fuel price risk. The first stage involves ensuring that current rates accurately reflect full fuel costs, specifically through a 2007 rate application. The second stage focuses on advancing an automatic fuel cost pass-through mechanism by implementing fuel procurement changes in cooperation with the regulator. Additionally, NSPI identifies the recovery of tax regulatory assets as a critical component for improving returns.

N-7-bRIRs 92 to 141 - SEB to NSPI - REDACTED (Large File - 11 MB) 9 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB REDACTED Question IR-96: Since the date of the Application, please list all contracts entered into, contract revisions, and the exercise of any options (either to utilize the option or not...

AI summary Nova Scotia Power Incorporated (NSPI) provided a response to an Information Request (IR-96) from the Nova Scotia Utility and Review Board (SEB). The response addresses the Board's inquiry regarding contracts, revisions, and options exercised related to fuel acquisition since the date of the initial Application. NSPI directs the Board to a specific table detailing fuel types, quantities, prices, and their respective impacts on the 2007 fuel forecast.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB Question IR-97: Utilizing committed tonnages to the date of the response to this Information Request, and accounting for all options exercised (either to elect to take tonnage, or to not t...

AI summary The Nova Scotia Utility and Review Board (SEB) issued an Information Request (IR-97) to Nova Scotia Power Incorporated (NSPI) regarding the estimation of solid fuel expenses for 2007. The request asks for an estimate based on committed tonnages and specific options exercised, applying forecast costs only to uncommitted fuels. NSPI responded by directing the Board to refer to previous responses provided in IR-112 and IR-124.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB Question IR-99: Taking account of all contracts entered into, contract revisions made, and options exercised (either to utilize the option or not), please provide NSPI's calculation of its...

AI summary The Nova Scotia Utility and Review Board (SEB) issued an Information Request (IR-99) to Nova Scotia Power Incorporated (NSPI) seeking a calculation of solid fuel expenses for the year 2007. The request specifically asks for these calculations to be based on coal pricing from the Hill & Associates Inc. report. NSPI responded by directing the Board to a previous response, Liberty IR-69.

Response IR-101: Please see table below.
Response IR-101: Please see table below. Calculation of C Price Increases 2006F $/MMBTU 2006 Rate Application $/MMBTU Increase/ HFO Natural Gas Coal Petroleum Coke NOV A SCOTIA UTILITY AND REVIEW BOARD

AI summary The document provides a response to Information Request IR-101, presenting a table that compares the price increases of various fuels (HFO, Natural Gas, Coal, and Petroleum Coke) between the 2006 Forecast and the 2006 Rate Application, measured in $/MMBTU.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB REDACTED Question IR-104: In response to SEB IR-24, NSPI refers to forward pricing data as of July 31, 2006, which is the forward curve date NSPI used to produce the 2007 forecast natural...

AI summary Nova Scotia Power Incorporated (NSPI) responded to an Information Request from the Nova Scotia Utility and Review Board (SEB) regarding natural gas price forecasting. NSPI analyzed the impact of using forward pricing data from November 27, 2006, instead of July 31, 2006. The analysis indicates that while the updated data would decrease estimated fuel expenses by approximately $6.6 million for the 2007 projected gas burn, this benefit is largely offset by a $6.3 million decrease in resale margins.

Question IR-108: Please provide the following information:
Question IR-108: Please provide the following information: - a. The estimated total solid fuel cost (excluding petroleum coke) submitted in support of the 2006 test year rate review. In addition supply the total generation in MWh in 2006 a...

AI summary The document contains a formal Information Request (IR-108) and the corresponding response regarding solid fuel costs and generation levels. The inquiry seeks a comparison between estimated and actual costs for 2006 and 2007 test years, specifically distinguishing between costs that include and exclude petroleum coke. Nova Scotia Power Incorporated provided a detailed table of these costs and the associated generation levels in MWh for the requested periods.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB REDACTED Question IR-11 0: Please indicate the tonnage of coal that NSPI anticipates purchasing under short term arrangements in 2007. Response IR-110: NSPI has of solid fuel open for 2007...

AI summary In response to an Information Request from the Nova Scotia Utility and Review Board (SEB), Nova Scotia Power Incorporated (NSPI) addressed inquiries regarding its coal procurement. NSPI stated that it maintains an open solid fuel volume for 2007, which can be sourced through long-term, medium-term, or short-term arrangements depending on the company's overarching fuel portfolio strategy.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: SEB Question IR-112: Additional solid fuel contracts have been negotiated since submission of the application. Please provide in total dollar terms the reduction in coal purchase costs that wi...

AI summary Nova Scotia Power Incorporated (NSPI) responded to an Information Request (IR-112) from the Nova Scotia Utility and Review Board (SEB) regarding solid fuel contracts. NSPI stated that the negotiation of additional fuel contracts, including new agreements, revisions, exercised options, and the optimization of solid fuel blends, is projected to result in a total reduction of approximately $3.1 million in coal purchase costs for the 2007 test year.

Question IR-124: Please complete the following matrix for the Test Year as of the date of the response to this Information Request:
Question IR-124: Please complete the following matrix for the Test Year as of the date of the response to this Information Request: Fuel Type Committed Volume Hedged Price Uncommitted Volume Forecasted Spot Price Total Cost (a) (b) (c) (d)...

AI summary The Nova Scotia Utility and Review Board (SEB) issued Information Request IR-124, requiring Nova Scotia Power Incorporated (NSPI) to provide a detailed fuel cost matrix for the Test Year. The matrix requests data on committed and uncommitted volumes, hedged prices, forecasted spot prices, and total costs for various fuel types, including coal, petcoke, natural gas, and heavy fuel oil. The request specifies required pricing conditions for international, domestic, and petcoke fuels, as well as transportation cost inclusions.

N-7-bRIRs 11 to 17 - NSDOE to NSPI - REDACTED 4 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: NSDOE REDACTED Question IR-11: With reference to NSPI's response to Liberty IR-9, Attachments 1 & 2 The average marginal costs for 2006 and 2007 from the Strategist System Report are and respe...

AI summary The Nova Scotia Department of Energy (NSDOE) explains that the increase in average marginal costs between 2006 and 2007 was driven by two primary factors: rising fuel prices and increasing electricity load. The marginal cost represents the expense of producing the next MWh, which is typically served by the last units dispatched—predominantly heavy fuel oil, natural gas, and light oil. Higher fuel prices and the necessity of engaging more expensive, secondary units to meet incremental load both contributed to the cost rise.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: NSDOE REDACTED Question IR-13: With reference to NSPI's response to Liberty IR-10, Attachments 1 & 2 The HFO cost in $/MMbtu for 2006 - as compared to 2007 I - Please explain the increase in p...

AI summary The Nova Scotia Department of Energy (NSDOE) responded to an information request regarding the projected increase in Heavy Fuel Oil (HFO) costs between 2006 and 2007. The Department clarified that crude oil prices trended upward during this period, rising from approximately $50 US per barrel in 2006 to $65 US per barrel by November 2006. Additionally, the response notes that HFO costs are influenced by specific financial hedges in place for the 2007 test year.

Question IR-15:
Question IR-15: - a. Please explain why the combustion turbines are forecast to produce significantly more energy in 2007 than in 2006, when the new ELIIR rates are designed to reduce the need to run combustion turbines? - b. Please confir...

AI summary The intervenor is seeking clarification on the projected energy production of combustion turbines for 2007 compared to 2006, specifically noting a discrepancy between the forecast and the intent of the new ELIIR rates to reduce turbine reliance. The inquiry also seeks confirmation on whether combustion turbine fuel costs were previously removed from above-the-line rates under the original ELIIR and whether these costs are being reintegrated into shared fuel costs for the 2007 forecast.

Response IR-15:
Response IR-15: - a. Combustion Turbines (CT) usage is expected to be higher in 2007 due to load growth. Unlike the former Extra Large Industrial Interruptible Rate (ELIIR) tariff, the new ELI 2P-RTP rate is not explicitly designed to redu...

AI summary The response clarifies the impact of the new ELI 2P-RTP rate on combustion turbine (CT) usage compared to the former ELIIR tariff. Unlike ELIIR, the new rate provides hourly price signals to customers without explicitly targeting combustion turbine reduction. Additionally, the response confirms that combustion turbine fuel costs for in-province load are now included in the Above the Line (ATL) rates, noting that revenue from export sales offsets these costs.

N-10Comments filed by Allan F. Smith 2 passages
Preamble
Tuesday, November 7, 2006 ORIGIN~.- DEC 1 9 2006 Nova Scotia Utility and Review Board ·"' . . RE: An Application by Nova Scotia Power Incorporated for Approval of Certain Revisions to its Rates, Charges and Regulations. Nova Scotia Power I...

AI summary The document discusses Nova Scotia Power Incorporated's (NSPI) application for rate revisions, focusing on high fuel costs and expense recovery. It critiques NSPI's argument for increased fuel costs, noting a decline in oil prices and the potential for future alternatives like wind and hydroelectric power to reduce reliance on fossil fuels. The Board is urged to consider public interest over shareholder interests and to explore alternative energy sources.

Requested Adjustment to Rates
Requested Adjustment to Rates Using NSPI data, their revenue increase request in total is made up of75% of the total in higher fuel costs. The Board is being asked by this intervener to deny that 75% increase for fuel and allow the establi...

AI summary The intervener requests that the Board deny a 75% increase in fuel costs for NSPI and establish a fuel cost base tied to the March 2006 world fossil fuel price. The intervener also calls for NSPI to invest in alternatives quickly and criticizes NSPI's reliance on fossil fuels and its claims about wind generation reliability.

N-12Evidence filed by John Stutz on behalf of NSUARB 4 passages
3 REQUEST?
3 REQUEST? 1 4 A. 5 6 7 8 9 10 11 12 13 14 15 16 17 Yes, I do. The actual fuel costs incurred by a utility rarely match the costs reflected in the utility's rates. For example, in a mild winter the fuel cost for serving the residential cla...

AI summary The text discusses concerns about the proposed true-up mechanism for ELI 2P-RTP, arguing that it would create inequities and risks for customers by requiring adjustments based on sunk costs. The speaker opposes the true-up, emphasizing that it would be inconsistent with existing rate structures and could make ELI 2P-RTP unworkable.

Preamble
23 submission of evidence, cross-examination and briefing-effectively, to address the reasonableness and prudence of the costs the Company has proposed that it be allowed to recover. Costs and revenues both can change between rate filings....

AI summary The text discusses the regulation of utility costs, emphasizing the importance of the reasonableness and prudence of proposed costs. It argues that regulatory lag helps emulate competitive markets and that utilities should not be allowed to recover certain costs. It also addresses NSPI's request to defer increased fuel expenses, which is not supported due to the company's prior actions and flexibility in rate filings.

SHAREHOLDERS?
SHAREHOLDERS? A. Yes, they are fair. When considering this point I would ask the Board to take into 17 account the experience in 2006. For 2006, NSPI's forecast fuel-related expenses are over 18 less than those in the 2006 C data, the data...

AI summary The shareholder-related question discusses the fairness of NSPI's fuel-related expenses in 2006, noting that NSPI's forecast was lower than the 2006 C data, leading to improved cash flow.

HISTORICAL AND FORECAST FUEL-RELATED COSTS
HISTORICAL AND FORECAST FUEL-RELATED COSTS Year(s) Fuel-Related Cost ($ per MWH) 1993 25.81 1994 25.70 1995 25.30 1996 24.30 1997 23.91 1998 24.49 1999 24.15 2000 23.95 2001 25.74 2002 28.22 2003 22.76 2004 24.11 2005 29.93 2006 (F) 2007 (...

AI summary The document presents historical and forecast fuel-related costs per MWH from 1993 to 2007, showing significant fluctuations over time. It includes a table comparing company estimates with actual or forecast values for specific years, highlighting differences. The data also provides statistical analysis, such as mean and standard deviations, for different time periods.

N-14Evidence filed by John Antonuk, Donald T. Spangenberg, Jr. and John B. Adger, Jr. (on behalf of NSUARB) (Large File - 26 MB) 44 passages
Preamble
22 23 24 management of fuel used for power generation (including coal, pet coke, natural gas and fuel oil), and fuel strategies. We address these subjects in light of: - Recommendations made by Liberty in the prior rate case - NSPI's respo...

AI summary The document outlines the management of fuel used for power generation, including coal, pet coke, natural gas, and fuel oil, and fuel strategies. It considers recommendations from Liberty in the prior rate case, NSPI's responses, commitments, expenditures, and changes in internal and external circumstances.

DO YOU HAVE ANY GENERAL COMMENTS ON THE COMPANY'S DEVELOPMENT OF ITS ANTICIPATED TEST YEAR FUEL-RELATED COSTS?
DO YOU HAVE ANY GENERAL COMMENTS ON THE COMPANY'S DEVELOPMENT OF ITS ANTICIPATED TEST YEAR FUEL-RELATED COSTS? NSPI estimated its costs for 2007 on the basis of market conditions and pnce expectations current at the end of July of this yea...

AI summary NSPI estimated its 2007 fuel costs based on July prices, which were higher than those at the time of filing. Fuel prices dropped significantly afterward, making NSPI's estimates outdated. Liberty advised NSPI to use more recent data, but the company has not provided the updated information requested.

Q. WHAT ARE THE KEY POINTS OF YOUR EVIDENCE?
Q. WHAT ARE THE KEY POINTS OF YOUR EVIDENCE? A. The key points are: Fuel Forecasting 24 - Prices in fuels markets are cyclical, volatile, and difficult to predict with a substantial degree of certainty. - Establishing base rates using mid-...

AI summary The key points of the evidence focus on the volatility and unpredictability of fuel markets, the inappropriateness of using mid-2006 estimates for base rates, and the significant impact of price changes between natural gas and heavy fuel oil on fuel and energy costs.

2007 Fuel Cost Review
2007 Fuel Cost Review - Volatility in market pnces for the fuels used for electricity generation has continued. - There is substantial reason to believe that this volatility will remain in the period during which NSPI will collect the rate...

AI summary The 2007 Fuel Cost Review highlights concerns about NSPI's assumptions regarding fuel costs and the risks of over- or under-recovery due to market volatility. It also criticizes NSPI's handling of excess natural gas sales and its selection of EES for purchasing gas, suggesting a lack of competitive processes and overly pessimistic assumptions.

17 Fuel Cost Adjustments
17 Fuel Cost Adjustments 19 18 - 20 - 21 - 22 23 24 be made at the present time, because NSPI until recently declined to provide updated information. • NSPI's estimate of its costs for light fuel oils (LFOs), "furnace" oil and diesel fuel,...

AI summary The document discusses NSPI's fuel cost estimates, noting that they are too high due to declining prices of light fuel oils, furnace oil, and diesel fuel, as indicated by the 2007 NYMEX strip prices.

Fuel Management Directives
Fuel Management Directives • NSPI has made substantial progress m addressing the fuel management weaknesses that we observed in the last case. A few challenges remain to be met; however, we believe that NSPI has responded well to the Board...

AI summary NSPI has made significant progress in addressing fuel management weaknesses identified in the last case, though some challenges remain. The Board's directives in its order from the last rate case have been well responded to by NSPI.

15 Q. WHAT ARE YOUR RECOMMENDATIONS?
15 Q. WHAT ARE YOUR RECOMMENDATIONS? 16 A. Liberty's recommendations are as follows: - 1. NSPI's fuel expense estimate for the Rate Year (2007) should be reduced by C$5,506,000 because the Company has been able to secure at lower-than-esti...

AI summary Liberty recommends reducing NSPI's fuel expense for the 2007 Rate Year due to lower-than-estimated fuel prices, increased delivery volumes, and updated fuel cost information. Adjustments are also suggested based on changes in fuel oil and gas prices, as well as potential impacts from affiliate transactions.

16 Organization and Procedures
16 Organization and Procedures - 17 6. NSPI should continue its work on developing a more comprehensive set of fuel hedging 18 policies and procedures. - 19 7. NSPI should continue its work on development of a complete set of procedures fo...

AI summary The document outlines several recommendations for NSPI, including the development of comprehensive fuel hedging policies and procedures, as well as updated procedures for the procurement of purchased power. NSPI is also required to present a revised Fuel Procurement Policies and Procedures Manual for final review.

Q. WHAT PROGRESS HAS NSPI MADE IN BUILDING THE REQUIRED SOLID FUEL SUPPLY PORTFOLIO?
Q. WHAT PROGRESS HAS NSPI MADE IN BUILDING THE REQUIRED SOLID FUEL SUPPLY PORTFOLIO? A. NSPI has made significant progress in building the required portfolio. It now holds a portfolio that reflects the sound execution of an effective portf...

AI summary NSPI has made significant progress in building the required solid fuel supply portfolio, reflecting the sound execution of an effective portfolio strategy as of November 27, 2006.

Q. WHAT ACTIONS HAS NSPI TAKEN TO EXECUTE ITS NEW STRATEGY?
Q. WHAT ACTIONS HAS NSPI TAKEN TO EXECUTE ITS NEW STRATEGY? A. Since the last case, NSPI has worked to balance the most difficult component of its portfolio to fill; i.e., the long-term component. In January 2006, NSPI issued an RFP for 1,...

AI summary NSPI has taken steps to execute its new strategy by balancing its long-term portfolio, including issuing an RFP for 1,000,000 tonnes of low sulfur coal for 2007 delivery in January 2006.

23
23 1 NSPI was interested in having the option of buying coal from 2 3 4 5 6 7 8 9 10 11 12 Liberty found that NSPI properly handled the solicitation for this RFP, by including a 13 sufficient number of qualified potential suppliers, conduc...

AI summary NSPI considered buying coal from suppliers in 2008 and 2009 without issuing an RFP, based on various factors. Liberty assessed that NSPI's actions were reasonable and that the documentation for the coal contracts did not show administrative issues from previous cases.

Q. HOW DOES THE NSPI PORTFOLIO COMPORT WITH YOUR VIEWS OF GOOD UTILITY PRACTICE?
Q. HOW DOES THE NSPI PORTFOLIO COMPORT WITH YOUR VIEWS OF GOOD UTILITY PRACTICE? A. NSPI has established an appropriate fuel supply portfolio strategy, and has taken appropriate efforts in building a portfolio that corresponds to it. Given...

AI summary NSPI has established an appropriate fuel supply portfolio strategy and taken appropriate efforts in building a portfolio that corresponds to it, according to the response provided.

22
22 since the March 2005 decision in a prior case directing assembly of this new portfolio, 2 NSPI's assembly of it by this time demonstrates strong performance. 3 4 Estimates of Solid Fuel Costs for the Rate Year 5 6 Q. HAVE YOU EVALUATED...

AI summary The text discusses NSPI's evaluation of its 2007 solid fuel cost estimates, including the use of existing pricing for committed fuel and estimated prices for uncommitted fuel. It notes changes in the coal supply portfolio, including cost savings from lower-than-expected prices for certain coal types, and references an exhibit summarizing the effects of these changes.

Q. PLEASE PROVIDE SOME BACKGROUND ON THE USE OF FUEL OILS AND NATURAL GAS AT NSPI.
Q. PLEASE PROVIDE SOME BACKGROUND ON THE USE OF FUEL OILS AND NATURAL GAS AT NSPI. NSPI's generation is mostly fired with solid fuels. The Company's solid-fuel units run largely in a "base-load" position; i.e., they run more-or-less contin...

AI summary NSPI primarily uses solid fuels for base-load generation and relies on oil- and gas-fired units to meet daily and seasonal load fluctuations. The Tufts Cove Generating Station has units capable of burning both heavy fuel oil (HFO) and natural gas, with fuel choice based on cost. Additional light-oil-fired units are used at various locations, and small amounts of light fuel oils and diesel are used for start-up purposes.

Q. PLEASE PROVIDE SOME BACKGROUND ON NSPI'S ARRANGEMENTS FOR
Q. PLEASE PROVIDE SOME BACKGROUND ON NSPI'S ARRANGEMENTS FOR THE SUPPLY OF THESE FUELS. A. The Company buys HFO through an annual-tender process. NSPI contacts potential suppliers in the fall of most years to bid on requirements for the su...

AI summary NSPI procures HFO through annual tenders, with suppliers delivering to Tufts Cove based on a market-price index. Minor HFO is transported by truck to other locations via periodic tenders. LFO is also procured through tenders, with pricing based on Imperial Oil's refinery prices. NSPI has a natural gas contract with the M&NP pipeline system for potential future use.

9
9 11 12 13 14 15 16 17 18 19 20 21 22 23 24 estimated cost of fuel oils and gas increases from C$154.5 million (2006C) to C$211.8 million (2007F), or 37.1%. That increase represents almost 84% of the total increase in the costs of fuel and...

AI summary The estimated cost of fuel oils and gas increased from C$154.5 million (2006C) to C$211.8 million (2007F), a 37.1% increase, which accounts for 84% of the total increase in fuel and purchased power costs proposed by the Company, and in turn, 84% of the increase in revenue requirement proposed in this case.

8 Q. HOW DO THESE PRICE INCREASES AFFECT THE COMPANY'S FUEL COSTS?
8 Q. HOW DO THESE PRICE INCREASES AFFECT THE COMPANY'S FUEL COSTS? - 10 A. Increases in the prices of fuel oils affect the Company's estimated fuel costs in two ways: - Directly, through an increase in the cost of a given amount of fuel -...

AI summary The company explains that rising fuel oil prices increase fuel costs directly and indirectly by altering the optimal fuel mix used for electricity generation. The proposed rates reflect a shift in fuel usage, with solid fuels decreasing and natural gas consumption becoming more balanced with HFO, influenced by factors like weather and customer operations.

4 Q. WHAT IS YOUR OPINION OF THESE INCREASES?
4 Q. WHAT IS YOUR OPINION OF THESE INCREASES? 5 A. They are too high. The Company filed its Application on October 10 of this year; however, the forward prices for fuel oils and gas incorporated into the Company's fuelcost estimates were o...

AI summary The respondent believes the proposed increases are too high, citing that the fuel cost estimates used by the Company are based on outdated forward prices from July 2006, when oil and gas prices were at their peak for the year, and that more current price information should be used.

12 Q. HOW MUCH HAVE PRICES FOR FUEL OILS AND NATURAL GAS DECLINED SINCE JULY?
12 Q. HOW MUCH HAVE PRICES FOR FUEL OILS AND NATURAL GAS DECLINED SINCE JULY? 14 A. The table below shows how much the "strips" (average of the 12 monthly prices) for 2007 have declined since July. HFO futures are traded over-the-counter,...

AI summary The answer to the question about the decline in fuel oil and natural gas prices since July is presented through a table showing the 2007 price strips. The table includes data for different fuel types, with prices quoted in US$ per MMBtu for natural gas and per gallon for heating oil. West Texas Intermediate (WTI) crude oil is used as a surrogate for heavy fuel oil (HFO).

Q. WHAT ADJUSTMENTS DO YOU PROPOSE TO MAKE?
Q. WHAT ADJUSTMENTS DO YOU PROPOSE TO MAKE? 2 A. We noted earlier that changed fuel prices could have the effect of changing the dispatch ofNSPI's generating units. In particular, the Tufts Cove Generating Station could bum as little as In...

AI summary The Company acknowledges that changes in fuel prices could impact the dispatch of generating units, particularly the Tufts Cove Generating Station. It has agreed to provide updated fuel-cost estimates using hedged prices as of November 27th, with information expected by January 8, 2007. In the absence of this data, Liberty recommends maintaining the current allowance for fuel oil and gas costs in the Company's rates.

24
24 has reduced the volume of gas available under the 2 record of under This reduction was taken to account for - 3 deliveries to NSPI in the past. 4 5 - performance under the contract, however, has been much improved since 6 resolution of...

AI summary The document discusses the impact of increased gas availability under a contract on NSPI's fuel costs and profits. It mentions adjustments based on new fuel-cost estimates and the potential for additional revenue from gas sales, leading to a reduction in NSPI's Rate Year fuel and purchased-power costs.

Q. WHAT WAS YOUR OPINION OF THOSE ARRANGEMENTS?
Q. WHAT WAS YOUR OPINION OF THOSE ARRANGEMENTS? - A. As detailed in our testimony last year, Liberty was troubled by a number of aspects of the early-2004 arrangements. They were not consistent with good utility practice, with the Company'...

AI summary The witness expressed concerns about early-2004 arrangements, stating they were inconsistent with utility practices and the Board's 2002 Rate Case Order. Recommendations included competitive bidding for gas sales, an audit of affiliate transactions, and a study on in-house gas sales functions.

Q. DID THE BOARD ADOPT THOSE RECOMMENDATIONS?
Q. DID THE BOARD ADOPT THOSE RECOMMENDATIONS? 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 A. Q. A. Q. A. Q. A. Yes. WHAT HAS HAPPENED IN RESPONSE TO YOUR RECOMMENDATION FOR ANOTHER COMPETITIVE SOLICITATION? NSPl retained a co...

AI summary The Board adopted recommendations, including conducting competitive solicitations for excess gas. NSPI retained a consultant to administer two competitions, both won by the affiliate. However, the Board found these competitions insufficient in terms of arm's-length dealing. Discussions with NSPI focused on evaluating term-sale offerings and market penetration strategies for natural gas.

In any event, wholesale gas markets in most market centers are increasingly competitive.
In any event, wholesale gas markets in most market centers are increasingly competitive. 2 Margins are being driven down as increasingly sophisticated and well-financed 3 participants enter (or re-enter) these markets. 4 5 6 7 8 9 10 11 12...

AI summary The text discusses the increasing competitiveness of wholesale gas markets, concerns about the lack of access to information regarding NSPI's pricing, and the flawed competition that may have led to reduced prices for NSPI's excess gas. There are recommendations for NSPI to sell its own gas and develop a program for future arrangements.

Q. WHAT IS YOUR OPINION OF THESE FORECASTS?
Q. WHAT IS YOUR OPINION OF THESE FORECASTS? A. Again, we think the Rate Year expense number is wrong because the HFO price is too high. When the Company re-estimates its HFO expense with more-current prices, however, we don't know whether...

AI summary The respondent questions the accuracy of the Rate Year expense forecast, citing an overly high HFO price. They note uncertainty about whether the expense will increase or decrease, depending on whether HFO or gas becomes the economic fuel choice in the summer.

Q. WHAT IS YOUR OPINION OF NSPI'S PROCESS FOR ACQUIRING HFO?
Q. WHAT IS YOUR OPINION OF NSPI'S PROCESS FOR ACQUIRING HFO? A. NSPI uses an annual tender process for acquiring HFO. Prospective suppliers bid on the right to provide supply delivered to the Company's Tufts Cove receiving and storage faci...

AI summary NSPI uses an annual tender process to acquire HFO, with suppliers bidding to deliver to Tufts Cove facilities at prices tied to New York Harbor rates. In 2006, due to a shift in HFO and gas prices, NSPI acquired smaller HFO lots from Imperial Oil's Dartmouth refinery at nearly the same price as larger contracts.

Q. WHAT HAS BEEN THE IMP ACT OF MARKET CONDITIONS ON NSPI?
Q. WHAT HAS BEEN THE IMP ACT OF MARKET CONDITIONS ON NSPI? A. NSPI was at the time of the last case experiencing significant swings in the prices of the fuels it uses to generate electricity. Exhibit LCG-2 shows the changes in the contribu...

AI summary NSPI has experienced significant fluctuations in fuel prices, impacting its overall fuel costs between 2002A and 2007F. The forecast for 2007 fuel and purchased power expenses is $498.724 million, an increase of $68.489 million over 2006C. Exhibit LCG-2 provides details on these changes.

Q. WHAT DO CURRENT-YEAR MEASURES TELL US ABOUT NSPI FORECASTS?
Q. WHAT DO CURRENT-YEAR MEASURES TELL US ABOUT NSPI FORECASTS? The unpredictability of fuel costs continues to be a major challenge for NSPI and for the 17 18 A. on a $/MWH basis. 19 20 Board. Caution dictates recognition that unpredictabl...

AI summary The unpredictability of fuel costs poses challenges for NSPI and the Board in forecasting. NSPI's ability to switch between gas and oil for generation affects its cost optimization. The company uses forecasted prices for rate case purposes, but current market conditions and assumptions should be applied. NSPI has adjusted its strategy due to 2005 regulations, relying on low-sulfur coal and ocean deliveries.

Q. HOW DO YOUR OBSERVATIONS ABOUT FUEL MARKETS COMPARE WITH WHAT YOU TESTIFIED TO IN THE PRIOR RATE CASE?
Q. HOW DO YOUR OBSERVATIONS ABOUT FUEL MARKETS COMPARE WITH WHAT YOU TESTIFIED TO IN THE PRIOR RATE CASE? A. They continue to be applicable. Last year, for example, Liberty indicated that the coal market was strong, but that prices would c...

AI summary The witness discusses the ongoing volatility and uncertainty in coal, oil, and natural gas markets, emphasizing the importance of a balanced fuel portfolio strategy. They note that NSPI has implemented a sound strategy and that market conditions remain unpredictable, reinforcing the need for continued caution and diversified procurement approaches.

Q. WHAT PRINCIPAL STEPS HAS NSPI TAKEN TO IMPROVE ITS MODELING IN ORDER TO RESPOND TO THS RECOMMENDATION?
Q. WHAT PRINCIPAL STEPS HAS NSPI TAKEN TO IMPROVE ITS MODELING IN ORDER TO RESPOND TO THS RECOMMENDATION? NSPI uses the CanMet Model to provide a fully evaluated fuel comparison to the boiler steam header outlet (the steam header outlet is...

AI summary NSPI has improved its modeling practices by using the CanMet Model and an S02 model for fuel evaluation. Liberty has concerns about flexibility in evaluating new or changing coal supplies but is satisfied with NSPI's use of models in procurement. NSPI has addressed previous concerns by implementing a structured procurement process and providing thorough documentation.

Q. PLEASE PROVIDE EXAMPLES OF WHAT YOU FOUND.
Q. PLEASE PROVIDE EXAMPLES OF WHAT YOU FOUND. A. There are a number of examples that demonstrate to Liberty that NSPI has taken fuel management seriously, and has pursued constructive steps to manage its solid fuel supply in ways that bene...

AI summary NSPI provided examples of fuel management practices, including an RFP for low-sulfur coal in 2006, to demonstrate its commitment to managing solid fuel supply effectively and reducing operational costs.

A. Yes. For the years 2005, 2006 and 2007, NSPI's purchased power costs and forecast (CDN$ 000) are as follows:
A. Yes. For the years 2005, 2006 and 2007, NSPI's purchased power costs and forecast (CDN$ 000) are as follows: 2 6 2 Purchased Power Actual 2005 2006C Forecast 2007 3 Emera Energy 229.3 - - Brookfield 113.9 - - 4 Hydro Quebec 3,057.1 - -...

AI summary NSPI's purchased power costs for 2005, 2006, and 2007 are outlined, showing significant variations in expenses from different sources. Forecasted purchases for 2006 and 2007 are not under contract and are made on an hourly or daily basis to support the most economical operation of NSPI's generation fleet.

Q. PLEASE SUMMARIZE THE CONCERNS YOU RAISED ABOUT ORGANIZATION AND STAFFING IN THE LAST RATE CASE.
Q. PLEASE SUMMARIZE THE CONCERNS YOU RAISED ABOUT ORGANIZATION AND STAFFING IN THE LAST RATE CASE. the Board-directed liaison between Liberty and NSPI have not been as complete or We view the lack of procedures with concern. Procurement of...

AI summary The concern raised was about the lack of expertise in NSPI's fuel procurement organization, specifically the need for a senior fuel procurement manager with international coal market and procurement experience to guide solid fuel procurement operations.

Q. WHAT HAS NSPI DONE TO ADDRESS THIS ISSUE?
Q. WHAT HAS NSPI DONE TO ADDRESS THIS ISSUE? A. NSPI has retained an executive search firm to identify and recommend for hiring a senior fuel procurement manager with international coal market and coal procurement experience. Originally, N...

AI summary NSPI has been working to address fuel procurement challenges by seeking a senior manager with international coal experience and developing the skills of a current employee. Despite efforts, the ideal candidate has not yet been found, and progress is being reported to the Board.

18 Q. HOW WELL DO THESE CHANGES RESPOND TO YOUR PRIOR RECOMMENDATIONS AND TO THE WEAKNESSES UNDERLYING THEM?
18 Q. HOW WELL DO THESE CHANGES RESPOND TO YOUR PRIOR RECOMMENDATIONS AND TO THE WEAKNESSES UNDERLYING THEM? Liberty believes that NSPI's efforts to find an outside candidate have been diligent, and that efforts to develop internal resourc...

AI summary Liberty acknowledges NSPI's efforts in developing internal resources but recommends an aggressive development program for the selected employee, including training and mentorship, while continuing to use an outside consultant. They also suggest considering a senior, retired individual for a mentoring role to address prior recommendations and underlying weaknesses.

Management Studies for Public Utility Commissions
Management Studies for Public Utility Commissions Currently serving as Leader of the Gas Procurement Analysis Team in a focused audit of affiliate transactions and gas procurement and general management audit of New Jersey Natural Gas Comp...

AI summary The text outlines the professional experience of an individual in conducting audits and management studies for public utility commissions, focusing on gas procurement, hedging programs, and affiliate transactions for various utility companies across multiple states.

U.S. and Canadian Gas Industry Regulation
U.S. and Canadian Gas Industry Regulation Evaluated the fuel-oil and natural-gas supply activities of Nova Scotia Power, Inc. for the Staff of the Nova Scotia Utility and Review Board. Presented testimony to the Board regarding findings in...

AI summary The document outlines various regulatory roles involving fuel-oil and natural-gas supply activities, including testimony to the Nova Scotia Utility and Review Board and analysis of gas cost adjustment mechanisms and portfolio optimization agreements in Connecticut and Ohio.

Combination Utilities
Combination Utilities Served as Engagement Director for Liberty's role as the Arizona Corporation Commission's fuels expert in a pending rate case for APS. Liberty's work included the identification of any required, specific adjustments to...

AI summary The text outlines various engagements by Liberty in auditing and examining utility companies across different states, focusing on fuel costs, power procurement practices, cost-allocation methods, and management audits of affiliate transactions and corporate operations.

Electricity
ndiscriminatory access to network infrastructure to third parties, and (i) cost pools, overhead factors, and allocation of common costs among utility and non-utility affiliate activities and entities. Project Manager for Liberty's major co...

AI summary The text outlines various consulting engagements by Liberty, focusing on utility restructuring, cost management, and affiliate arrangements. It includes work with the New Hampshire Public Utilities Commission, Virginia State Corporation Commission, and Hawaii Public Utilities Commission, covering topics such as cost allocation, asset management, and corporate governance.

Testimony
Testimony Nova Scotia Utility and Review Board - testimony on the prudence of fuel procurement, affiliate relationships associated with fuel management, and use of an automatic adjustment clause to recover fuel costs. Arizona Corporation C...

AI summary The testimony section outlines various regulatory proceedings across multiple jurisdictions, focusing on fuel procurement, affiliate relationships, rate increases, and management audits. These testimonies were presented to different utility commissions and regulatory bodies, addressing issues such as prudence of fuel procurement, management-audit recommendations, and interconnection agreements.

Commission-Sponsored Studies
Commission-Sponsored Studies Served as a Lead Consultant in an audit of the fuel and purchased-power procurement practices and costs of Arizona Public Service Company for the Arizona Corporation Commission. Responsible for examining all as...

AI summary The text outlines various consulting roles undertaken by Liberty in audits related to fuel and energy procurement practices for multiple utility companies across different states and regions, including Arizona, Nova Scotia, Ohio, and Kentucky.

Fuels Management
Fuels Management Project Manager and Lead Consultant for Liberty's process-improvement project for Alabama Electric Cooperative, Inc. This project included analysis of operations and development of recommendations for improvement of polici...

AI summary The text outlines various fuel management projects led by a consultant for multiple utility companies, including policy development, system analysis, and organizational restructuring to improve fuel procurement, transportation, and inventory management practices.

Other Experience
Other Experience President, Management Insight - Formed this management consulting firm providing specialized consulting to users and suppliers in the energy industry. Assisted clients in fuel-supply evaluation and procurement, fuel manage...

AI summary The text outlines the professional experience of an individual in the energy sector, including roles in fuel management, marketing, and consulting. It details experience in contract negotiation, fuel supply evaluation, and strategic planning across various energy-related industries and regions.

Exhibit LCG-2 Variability of NSPI Fuel Costs Millions of Dollars (CAD)
Exhibit LCG-2 Variability of NSPI Fuel Costs Millions of Dollars (CAD) Power Fuel & Purchased Power 315.7 318.7 336.3 332.4 420.1 Fuel for 0.8 0.8 0.8 on HFO &Gas - (4.5) Total Fuel & Purchased Power 299.8 326.1 280.6 302.5 373.6 Total Fue...

AI summary Exhibit LCG-2 presents the variability of NSPI fuel costs over time, showing fluctuations in millions of dollars and the total fuel cost per megawatt-hour (MWH). The data highlights changes in fuel and purchased power costs, including specific figures for different periods.

N-16Review of NSPI's Fuel Costs on behalf of Avon Valley Greenhouses et al. (AVON) REDACTED (Large File - 38 MB) 31 passages
REVIEW OF NOV A SCOTIA POWER INCORPORATED'S FUEL COSTS
REVIEW OF NOV A SCOTIA POWER INCORPORATED'S FUEL COSTS For Stewart McKelvey Halifax, Nova Scotia On behalf of: Avon Valley Greenhouses et al. December 20, 2006

AI summary This document is a review of Nova Scotia Power Incorporated's fuel costs, prepared by Stewart McKelvey on behalf of Avon Valley Greenhouses and others, dated December 20, 2006.

Introduction
Introduction Nova Scotia Power, Inc. (NSPI) has requested a rate increase using 2007 as a test year. The total fuel and purchased power forecast for 2007 is C$498.7 million, an increase of C$68.5 million over the fuel amount currently set...

AI summary Nova Scotia Power, Inc. (NSPI) has requested a rate increase, citing higher commodity costs, load increases, and decreased gas resale margins as the main factors. The largest component of the increase is attributed to oil-related price increases, followed by coal and decreased gas resale margin.

DETAILED COMPONENTS OF NSPI'S REQUESTED RATE INCREASE
DETAILED COMPONENTS OF NSPI'S REQUESTED RATE INCREASE Increased Commodity Costs: million C$ Increased Heavy Fuel Oil (HFO) pricing $24.7 2006 import coal disallowance $15.7 Increased Light Fuel Oil (LFO) pricing $5.2 Increased natural gas...

AI summary NSPI has requested a rate increase, citing increased commodity costs, load increase, and other factors. Key components include higher fuel oil and natural gas prices, a fuel switch at Tufts Cove, and adjustments related to load and capacity factors. The total requested increase is $40.1 million in commodity price increases and $19.6 million in increased load costs.

Section 7
When the higher fuel costs are broken out to determine their impact on an mWh basis, the rising HFO and LFO prices cause double digit increases in the electricity production cost per mWh. Moreover, the aggregate of all fuels causes a rise...

AI summary The text highlights a significant 13% increase in electricity production costs per megawatt from 2006 to 2007, driven by rising fuel prices. This increase is deemed inappropriate given forecasts of declining oil and coal prices in the following years.

NSPI 2006 AND 2007 FUEL COSTS PER mWh
NSPI 2006 AND 2007 FUEL COSTS PER mWh (C$/mWh) 2006C 2007 Increase 20000 2007 merease Solid Fuel a Natural Gas Bunker C Diesel All Fuels Power Imports IPPs a Includes the disallowance in 2006. Without the disallowance, 2006C solid fuel was...

AI summary The text presents a table showing NSPI's fuel costs per mWh for 2006 and 2007, including various fuel types and a note about a disallowance in 2006 that affects the reported costs. The table lacks detailed numerical data and contains placeholders.

Summary Findings
Summary Findings Projections for oil (HFO and LFO) and natural gas prices play a much greater role in NSPI' s 2007 test year calculations than in previous rate cases. NSPI in establishing test year costs for HFO, LFO, and natural gas relie...

AI summary The document criticizes NSPI's use of futures prices for oil and natural gas in calculating 2007 test year costs, arguing that this method is unreliable and results in unrepresentative costs. It also highlights flawed contract decisions leading to high fixed prices for 2007–2009 and recommends disallowing certain cost increases due to incorrect projections and improved market conditions.

NSPI's HFO Costs
NSPI's HFO Costs Of the total fuel rate increase of C$68.50 million requested by NSPI, some is attributable to higher HFO costs (NSPI Direct Evidence , October 2006 p. 7). Of the C$40.1 million in increased commodity costs, HFO accounts fo...

AI summary NSPI requested a C$68.50 million fuel rate increase, with a portion attributed to higher HFO costs. The 2006 HFO prices were significantly lower than the projected 2007 prices, which are based on a forward price curve. This increase, combined with inventory and hedging factors, led to a C$24.70 million rate increase request for 2007.

TABLE 4 NSPI FORECASTED HFO BURN AND PRICE BY STATION
TABLE 4 NSPI FORECASTED HFO BURN AND PRICE BY STATION 2006 2007 mmBtu C$ (000s) C$mmBtu mmBtu C$(000s) C$/mmBtu Lingan Trenton 5 Trenton 6 Point Tupper Tufts Cove Source: Liberty IR-10, Attachment 2

AI summary Table 4 presents forecasted HFO burn and price by station for NSPI for the years 2006 and 2007. The table includes columns for mmBtu, C$ (000s), and C$/mmBtu, but no data is provided for specific stations such as Lingan, Trenton 5, Trenton 6, Point, Tupper, and Tufts Cove. The source is Liberty IR-10, Attachment 2.

Section 16
Actual NSPI prices and volumes in 2006 to September are substantially different from both the forecast for 2006 /mmBtu so Liberty IR-66, Attachment 2) and the actual expenditure /mmBtu so Liberty IR-33, Attachment 1, p. 1; see Table 6). Th...

AI summary NSPI's actual prices and volumes of HFO in 2006 differ significantly from forecasts and budgets, primarily due to a labor dispute affecting a major customer. This has impacted the compliant unit cost and overall expenditure for the year.

Section 18
The forward HFO price curve from which the forecast is derived was calculated on July 31, 2006 based on market indicators at the time (Avon IR-27, Attachment 2) (Table 7). The same document, however, shows estimated 2006 price projections...

AI summary The forward HFO price curve was calculated on July 31, 2006, using market indicators. The document also provides estimated HFO prices for October and November 2006, which are higher than the spot prices for those months.

Section 20
Most of the HFO is burned in units 1 through 3 at Tufts Cove. However, smaller volumes are also burned at Trenton, and Point The HFO is delivered from Tufts Cove truck Heavy fuel oil is the only major petroleum product demand for which is...

AI summary Heavy fuel oil (HFO) demand has significantly declined since the 1970s, with continued reductions driven by stricter environmental regulations in Europe. Most HFO is burned at Tufts Cove, with smaller volumes used at Trenton and Point.

Section 22
Heavy fuel oil refinery output has historically been concentrated in Europe where refineries have relied primarily upon the heavier crudes from the Middle East to produce a product slate with a substantial heavy oil component (Table 9). As...

AI summary Heavy fuel oil refinery output has been concentrated in Europe, particularly in the Netherlands, Belgium, and the UK, which are major exporters. However, the United States is the world's largest exporter of heavy fuel oil.

Preamble
HFO, defined by the IEA as heavy fuel oil containing more than 1.0% sulfur, is a product with a geographically limited market: the three largest consumers in the world in 2004 (latest data available) were, in order, Mexico, Japan and Canad...

AI summary The text discusses the market for HFO (Heavy Fuel Oil) and its declining value due to limited demand and increasing discounts compared to premium crude oils like WTI. NSPI selected July 2006 as the peak WTI price for setting its forward market price, which later declined significantly.

FIGURE 12 U.S. "STRANDED" DOMESTIC OIL RESOURCES IN EXISTING OIL FIELDS AND THE IMPACT OF C02 EOR TECHNOLOGY
EIA, Annual Energy Outlook 2007, pp. 4-5 28 New York Times, December 12, 2006 27 EIA, International Energy Outlook 2006, June 2006, p. 31 Source: National Oceanic and Atmosphere Administration. It is also important to remember how HFO pric...

AI summary The text discusses the relationship between HFO and WTI prices, noting that HFO trades about $20/bbl below WTI. It references NSPI's selection of HFO futures prices and the context of crude oil pricing in 2006, with data from EIA and IEA.

NSPI's LFO Costs
NSPI's LFO Costs Of the total fuel rate increase of C$68.50 million requested by NSPI, some million is attributable to higher LFO costs (UARB IR-4). NSPI has also requested C$16.1 million in the rate increase to cover the cost of a load in...

AI summary NSPI requested a C$68.50 million fuel rate increase, with a significant portion due to higher LFO costs. Increased utilization of combustion turbines burning diesel has led to higher diesel consumption and costs. LFO prices are not hedged due to variable volume, making forecasting difficult. The 2007 Rate Case involves higher diesel usage compared to the 2006C case.

Section 51
As in the case of HFO, in selecting at the end of July 2006 as the point in time for setting a forward market price for LFO, NSPI selected the month with the absolute highest average West Texas Intermediate oil price in history. Similarly,...

AI summary The text discusses the selection of July 2006 as a reference point for LFO pricing, noting the peak in WTI oil prices and subsequent decline by December 2006. It also highlights the global demand for LFO, particularly in the U.S., and notes weaker growth in Canada due to increased use of natural gas for heating.

TABLE 14 WORLD LIGHT FUEL OIL DEMAND, 1971-2004 (OOO's bbls/day)
TABLE 14 WORLD LIGHT FUEL OIL DEMAND, 1971-2004 (OOO's bbls/day) World OECD OECD Europe Pacific USA Canada 1971 12,009 4,303 924 2,910 478 1973 14,036 4,996 1,223 3,296 520 1978 16,138 5,168 1,483 3,661 534 1990 17,819 4,722 2,132 3,064 41...

AI summary Table 14 presents historical data on world light fuel oil demand from 1971 to 2004, showing trends across different regions and countries. The data highlights changes in consumption patterns over time, with specific figures for the World, OECD, USA, and Canada.

NSPI's Natural Gas Resale
NSPI's Natural Gas Resale In requesting a fuel price increase for 2007, NSPI has assumed a decreased gas resale margin of C$6.4 million in 2007, compared to the 2006 approved rates (NSPI Direct Evidence, p. 7). This is a consequence of the...

AI summary NSPI requested a fuel price increase for 2007 due to a decreased gas resale margin of C$6.4 million, attributed to increased gas consumption at Tufts Cove Units 1-3 during April to October 2007, reducing the volume available for resale.

Section 57
This step change in the use of natural gas at Tufts Cove in 2007 is a product of the NSPI HFO price projection based on the July 31, 2006 futures price for HFO (see above). When combined with the futures price projection of the same date f...

AI summary The shift in fuel use at Tufts Cove from HFO to natural gas in 2007 was influenced by price projections based on July 31, 2006 futures prices. However, these projections were deemed too high due to factors like record HFO stocks, a forecast of a warmer winter, and declining economic growth in 2007.

NSPI's Solid Fuel Costs
NSPI's Solid Fuel Costs NSPI is seeking an increase in coal costs of C$15.7 for 2007 over its allowed fuel charges in 2006. NSPI notes that it is seeking to recover the C$15.7 million by which the 2006 fuel charges were reduced by the Nova...

AI summary NSPI is requesting an increase in coal costs for 2007, citing a reduction in 2006 fuel charges by the NSUARB. NSPI based its 2007 coal cost projections on existing contracts and market forecasts, using bids and forward price curves for uncontracted volumes.

TABLE24 SUMMARY OF NSPI'S SOLID FUEL CONTRACTS AS OF BEGINNING SEPTEMBER 2006 (OOO's tonnes)
TABLE24 SUMMARY OF NSPI'S SOLID FUEL CONTRACTS AS OF BEGINNING SEPTEMBER 2006 (OOO's tonnes) Product Supplier 2006 2007 2008 2009 2010 OPEN (Tonnes) A STATE OF THE STATE OF THE STATE OF THE STATE OF THE STATE OF THE STATE OF THE STATE OF T...

AI summary The table summarizes NSPI's solid fuel contracts as of September 2006, listing products, suppliers, and quantities for the years 2006 to 2010. However, the data appears incomplete or corrupted, particularly in the '2010' column, which contains repeated text instead of numerical values.

Section 80
The utilization of futures prices to form an estimation of spot prices and contract prices at some future point in time is endorsed by NSPI' s fuel expert, EVA (NSPI, Direct Evidence, pp. 20-21, Figure 2.3.5). This methodology establishing...

AI summary The document discusses the use of futures prices to estimate spot prices and contract prices, noting that this method has been questioned due to its inaccuracy in predicting actual spot prices for oil and natural gas. It references NSPI's failure to lock in long-term coal contracts in 2002 and 2003, leading to disallowed costs in 2006. The efficacy of using futures prices to predict market changes is tested by examining 2002 and 2003 data.

Section 81
etermine if NSPI, with aid of monitoring futures prices, would have been able to predict the turn in the market in September and October 2003, which led to a rapid run-up in coal prices in early 2004. In 2002 TFS API #2 Calendar 2003 trade...

AI summary The text discusses the effectiveness of futures prices in predicting coal price movements, noting that during 2002-2003, futures prices closely followed spot prices but failed to predict the rapid rise in coal prices in early 2004. It highlights that futures prices were influenced by current market conditions rather than future trends.

Section 82
imply reflected market conditions in the spot market. Thus, it is with coal as well as for oil and natural gas, futures prices are not very reliable in predicting future prices in the physical market. Source: McCloskey's Coal Report; Tradi...

AI summary The text discusses the relationship between futures prices and spot prices for commodities like coal, oil, and natural gas, noting that futures prices are not reliable predictors of future physical market prices. It also mentions that for storable commodities, future prices are generally higher than spot prices due to the cost-of-carry. NSPI has entered into agreements that lower projected solid fuel prices for 2007 below those in the Rate Case.

是5000年底的100万
是5000年底的100万 建筑技术 等。25%。 The coal is for delivery to This is a contract that had been und der negotiation for a significant part of 2006. As part of the negotiation EVA was retained, 7世 被敌人法验证法 不够不 经的复数特殊 计一段模型 张 连到了15年 63年 维尼亚州西北部市的市场 经产品...

AI summary The II coal contract is expected to reduce solid fuel costs for 2007 by C$5.5 million. The contract was under negotiation for a significant portion of 2006 and EVA was retained as part of the negotiation.

Section 84
• Total solid fuel cost reduction from -ontract: C$5,543,287 or C$5.5 million. still leaves about low sulfur coal according to Figure 2.10 in the Direct Evidence (p. 57). For the pricing of this one can look to NSPI's coal consultants whos...

AI summary The text discusses the reduction in solid fuel costs from a contract, estimating a C$5.5 million saving. It also references coal price forecasts for 2007, noting that prices are expected to fall due to increased supply. The analysis considers the price differential between coal exported to Europe and North America and estimates potential savings based on these forecasts.

&lt;sup>39 Hill & Associates, 2006 Edition, International Coal Trade: Supply, Demand & Prices to 2015, p. E-1
&lt;sup>39 Hill & Associates, 2006 Edition, International Coal Trade: Supply, Demand & Prices to 2015, p. E-1 issued an RFP solicitation are unknown as of the time of writing. However, NSPI indicated that it would decide on whether or not...

AI summary The text discusses concerns about a long-term coal contract negotiated by NSPI, highlighting issues such as the lack of a formal tender process, the allocation of low sulfur coal to a mine with labor problems, and the contract being overpriced based on EVA forecasts. The contract is expected to be exercised in 2007 with significant financial implications.

Section 98
Most of the increase in steam coal imports to China is from Australia and Indonesia, although the Australian coal volumes from the official statistics appears to be significantly greater than Indonesian imports, discussions with Indonesian...

AI summary The text discusses coal import trends to China, highlighting significant imports from Australia and Indonesia, with concerns about illegal coal from Indonesia. It also notes China's increasing coal production, particularly in coastal regions, and the liberalization of domestic steam coal prices. Indonesia's coal production is expected to rise significantly, with projections for 2006 and 2007.

Section 103
Source: XStrata Coal, April 3, 2006. The buildup in export capacity in the Pacific in 2005 due to high shipping rates did not spill over into the Atlantic as it has in some past years. Total Pacific origin coals moving into the Atlantic ma...

AI summary In 2005, export capacity in the Pacific increased due to high shipping rates, but this did not significantly impact the Atlantic market. Australian and Chinese coal exports declined, while Indonesian coal increased. By 2006, Australian coal exports to Europe were rising, suggesting potential impacts on Atlantic market pricing in 2007.

NSPI's Foreign Exchange Usage
NSPI's Foreign Exchange Usage Almost the entire commodity energy budget of NSPI is denominated in U.S. Dollars, including imported coal, natural gas and HFO. This leads to a net requirement of US$272 million for 2007 (CA IR-11). In conduct...

AI summary NSPI's commodity energy budget is largely in U.S. Dollars, leading to a $272 million requirement in 2007. The company uses an exchange rate of 1.18 for its analysis, though the actual rate has been lower since 2005. NSPI uses foreign exchange hedges and relies on bank forecasts, which predict rates between 1.10 and 1.15 for 2007. A lower exchange rate in 2007 resulted in a $14.7 million savings on fuel costs.

LIST OF RELEVANT COAL PROJECTS
W of coal-fired independent power project in Eastern Sumatra, Indonesia. - For the developers of the Pingshou coal project in China ongoing advise (1982-1989) on economic feasibility and coal prices. - •For several Japanese steel companies...

AI summary The text outlines various advisory and analytical services provided for coal-related projects and industries globally, including economic feasibility studies, price trend analyses, litigation support, and market assessments for coal and power sectors in multiple countries.

N-18Direct Testimony - Nancy Brockway on behalf of the Consumer Advocate REDACTED (Large File - 37 MB) 6 passages
Preamble
1 2 3 4 5 6 7 8 9 10 11 12 13 Q. 14 Is the record clear as to why the Company was unable or unwilling to provide any fuel cost forecasts of any kind before hearings in P-883? 15 16 A. 17 18 19 20 21 22 23 24 No, it is not clear why the Com...

AI summary The document discusses the Company's failure to provide timely fuel cost forecasts in the P-883 proceeding, raising concerns about its transparency and the potential impact on rate decisions. The Company had access to fuel experts and continuous guidance from EVA, yet did not share forecasts until after hearings had closed.

Section 18
ations" is a component of generation business risk. - 7 Q. 8 Please discuss these aspects of Dr. Morin's analysis of risk, beginning with the risk of a regulatory finding of imprudence. 10 A. 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 If...

AI summary The witness discusses the risk of regulatory findings of imprudence related to NSPI's fuel procurement, stating that there is no basis for such a finding if NSPI is operating prudently. The witness also references past rate cases (P-881 and P-882) and notes that the Board has ruled to cut off consideration of imprudence impacts as of P-882.

Section 19
eflexive concerns of investors as to the likelihood of imprudence disallowances in the future. 1 Q. 2 Turning to the issue of the lack of a fuel clause, what is Dr. Morin's argument? 3 - 4 A. 5 6 7 8 9 Dr. Morin asserts that the lack of a...

AI summary Dr. Morin argues that the absence of a fuel cost adjustment clause increases NSPI's business risk compared to other utilities. However, the response refutes this by pointing out that Dr. Morin double-counts the risk and overlooks Nova Scotia's regulatory practices, such as the future test year and frequent rate increases.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Consumer Advocate Question IR-2: Please provide a copy of any forecasts of fuel costs, and of revenue from export sales and gas sales, prepared by or on behalf of NSPI for fuel costs for any y...

AI summary The Consumer Advocate requested fuel cost forecasts and revenue from export and gas sales by NSPI for 2007–2011. NSPI responded that such information is not available, but provided three hypothetical fuel cost scenarios of $434 million, $484 million, and $534 million as part of a previous response to SEB IR-1.

p. 238 NSPI PANEL- CROSS-EXAM. BY MS. RUBIN
p. 238 NSPI PANEL- CROSS-EXAM. BY MS. RUBIN - 655. Q. Now, NSPI has estimated that it has incurred cost savings to date as a result of the shutdown of Stora, that's correct? - A. (Biunden) Yes, our fuel expense in 2006 is less than it othe...

AI summary The cross-examination discusses NSPI's cost savings from the shutdown of Stora, noting reduced fuel expenses in 2006 and projections for the remainder of the year. It also touches on potential revenue loss versus avoided fuel costs and the impact of Stora's operations on annualized cost savings.

Citations to Dr. Roger Morin, Evidence in P-884 Entities against which NSPI's risk is compared:
Citations to Dr. Roger Morin, Evidence in P-884 Entities against which NSPI's risk is compared: Page (line) Type of Risk/Factor Specific Risk Compared Entity 116(28-30) business power generation risk - S&P score Canadian utilities. major i...

AI summary The document discusses various risks and comparisons related to Nova Scotia Power Inc. (NSPI), including business, regulatory, and financial risks. It compares NSPI's risk factors with other Canadian and U.S. utilities, focusing on metrics like bond ratings, fuel cost recovery, and capital structures.

N-20Direct Testimony and Exhibit - Alan Rosenberg on behalf of SEB - REDACTED (Large File - 20 MB) 23 passages
MEMORANDUM
MEMORANDUM RECEIVED JAN 1 5 2007 Nova Scotia Utility and Review Board January 10, 2007 To: DavidS. MacDougall, Esq. Mcinnes Cooper Re: Clarifications and Errata Sheet for Direct Evidence of Alan Rosenberg I would ask that you disseminate a...

AI summary Alan Rosenberg requests clarification and an errata sheet for his direct evidence, noting a discrepancy in fuel expense forecasts for 2005 between his table and Dr. John Stutz's testimony. He also mentions an error in converting a US dollar figure to Canadian dollars in Table 3 and Schedule 4 of his testimony.

10 Q ON WHOSE BEHALF ARE YOU APPEARING IN THIS PROCEEDING?
10 Q ON WHOSE BEHALF ARE YOU APPEARING IN THIS PROCEEDING? - 11 A I am appearing on behalf of Stora Enso Port Hawkesbury Limited and Bowater - 12 Mersey Paper Company Limited, collectively SEB. These are NSPI's two largest - 13 customers a...

AI summary The witness appears on behalf of Stora Enso Port Hawkesbury Limited and Bowater Mersey Paper Company Limited, collectively SEB, and discusses six issues related to NSPI's 2007 rate proposal, including comparative analysis, fuel inclusion principles, rate base normalization, rejection of deferred fuel costs, rejection of a 'true up' for ELI-2P RTP rates, and results of a Cost of Service Study.

1 Q WHAT ARE THE RESULTS OF YOUR COMPARATIVE ANALYSIS?
1 Q WHAT ARE THE RESULTS OF YOUR COMPARATIVE ANALYSIS? 2 A For the 41 other utilities that I looked at, all but two were less expensive than the 3 comparable rate for NSPI. The Industrial Index for the other utilities ranged from 43 4 to 1...

AI summary The comparative analysis shows that most North American utilities are less expensive than NSPI, with the Industrial Index ranging from 43 to 101. The expert concludes that NSPI's proposed rates would be significantly more expensive than those of other utilities. Fuel costs for the other utilities are based on base rates or fuel adjustment clause rates from October 2006. NSPI has repeatedly filed for rate increases tied to rising fuel costs.

1 Q PLEASE SUMMARIZE YOUR EVIDENCE AND RECOMMENDATIONS WITH 2 REGARD TO FUEL MATTERS. 3 A First, I show why fuel costs should not be based on 2007 forecasts alone, but should 4 also look ahead at 2008 fuel costs. Second, I show that NSPI has historically over 5 estimated its fuel costs in the context of rate applications. Third, I show that there is 6 evidence that fuel costs for 2007 and 2008 could very well be less than the costs that 7 NSPI employed for purposes of this rate filing. Fourth, I recommend an adjustment to 8 the fuel costs that should be used for setting rates in this proceeding. In particular, I 9 recommend that fuel costs should be at least $68 million less than that requested by 10 NSPI. Fifth, I recommend that the Board adopt a balancing account that would serve 11 to protect both NSPI and customers from large discrepancies between the actual fuel 12 cost incurred and the amount that I recommend for purposes of setting new rates. 13 Q DO YOU ADDRESS ANY ISSUES OF POSSIBLE IMPRUDENCE OR 14 UNNECESSARILY HIGH PURCHASED FUEL EXPENSE OR OTHER FACTORS 15 THAT MAY UNDULY ESCALATE THE STATED FUEL COSTS? 16 A No. Those issues will be addressed by other witnesses for SEB, and perhaps by 17 other stakeholders. Nevertheless, I would like to bring to the Board's attention four 18 areas where NSPI's judgment may inappropriately skew its fuel cost forecast. 19 The first issue pertains to the fact that NSPI has not relied upon a specific 20 market forecast for petcoke. Instead, it has simply imputed a future price for petcoke 21 that lies at a level that makes NSPI indifferent to buying petcoke 22 (Reference the response to SEB IR-5). Frankly, I do not see why such an
riate and it may bias the fuel forecast upwards. Thus, I urge the 1 Board to fully explore this matter, although I am not in a position to make a specific 2 recommendation on this issue at this time. 3 The second issue pertains to NSPI's c...

AI summary The witness argues that NSPI's fuel cost forecasts are based on outdated data and may be biased upwards. They highlight issues with NSPI's use of petcoke price assumptions, the use of a 'consensus' forecast for solid fuel prices that appears to be a single source, and abnormally long maintenance periods leading to higher replacement costs. The witness recommends adjusting fuel costs downward and adopting a balancing account to manage discrepancies.

11 Q WHY SHOULD FUEL COSTS THAT FORM THE BASIS FOR THESE NEW RATES 12 BE BASED ON 2007 AND 2008 FUEL COSTS?
11 Q WHY SHOULD FUEL COSTS THAT FORM THE BASIS FOR THESE NEW RATES 12 BE BASED ON 2007 AND 2008 FUEL COSTS? 13 A In Decision NSPI-P-875, in dealing with the subject of fuel costs based on a 2002 test 14 year, the Board (on page 29, emphasi...

AI summary The document discusses the rationale for using 2007 and 2008 fuel costs as the basis for new rates, referencing a prior Board decision that emphasized the need for prospective ratemaking. The Board adjusted coal costs by 10% to better reflect expected future costs, and the argument is made that NSPI should update its cost of service methodology to account for increased peak usage.

6 Q WHY WOULD YOU EXPECT THE RATES THAT ARE ESTABLISHED IN THIS 7 PROCEEDING TO BE IN EFFECT FOR MOST IF NOT ALL OF 2008 AS WELL?
6 Q WHY WOULD YOU EXPECT THE RATES THAT ARE ESTABLISHED IN THIS 7 PROCEEDING TO BE IN EFFECT FOR MOST IF NOT ALL OF 2008 AS WELL? 8 A For one thing, after this Decision, there should not be any large new amortization 9 items coming into ra...

AI summary The response explains that established rates are expected to remain in effect for most of 2008 due to the absence of large amortization items, stable fuel cost forecasts, and the historical pattern of rate increases. It also notes that frequent rate applications may provoke political backlash.

- 5 A The evidence is shown on the following table.
- 5 A The evidence is shown on the following table. TABLE 1 Fuel Cost Per MWh - Forecast Versus Actual Application Forecast Cost Actual Cost Overage 2002 Application $29.74 $28.22 5.4% 2003 Application $26.72 $22.76 17.4% 2005 Application...

AI summary The table compares forecast and actual fuel costs per MWh for various applications from 2002 to 2006, showing the overage percentages. The forecast consistently exceeded actual costs, with the average over forecast being 12.7%.

Preamble
\ NSPI is forecasting its actual 2006 fuel costs at - · However, this is mainly due to much lower sales, in part brought about by the Stora shutdown. The figure of $30.83 is my own estimate of what their fuel costs would have been under mo...

AI summary The text discusses concerns over Nova Scotia Power Inc.'s (NSPI) overestimation of fuel costs for 2007. It points out that NSPI used outdated forward prices for oil and gas, ignored lower coal prices, and did not use the most recent foreign exchange rates. An analysis suggests that updating these inputs would reduce NSPI's forecasted fuel costs by approximately $38.7 million.

1 Q WOULD YOU LIKE TO ADD ANY CAVEATS TO SCHEDULE 4?
1 Q WOULD YOU LIKE TO ADD ANY CAVEATS TO SCHEDULE 4? 2 A Yes. As I stated, the basis for pricing out the open tonnages of solid fuel in Schedule 3 4 are the average of the August 2006 and September 2006 bids and contracts for 4 delivery in...

AI summary The witness suggests that the pricing of open tonnages of solid fuel in Schedule 4 should consider Mr. Gubbins' analysis of coal prices for 2007, which may be more credible. Additionally, the impact of updated oil and gas forwards could be greater if the HFO/gas fuel mix at Tufts Cove is reoptimized.

14 Q HOW MUCH OF THE DECREASE THAT YOU CALCULATED IS ATTRIBUTABLE
14 Q HOW MUCH OF THE DECREASE THAT YOU CALCULATED IS ATTRIBUTABLE 15 TO THE DIFFERENT FOREX RATE THAT YOU USED? 16 A Approximately $14 million of the $38.7 million is directly attributable to using 1.13 as 17 the FOREX rate instead of 1.18.

AI summary The decrease calculated is partially attributable to the use of a different foreign exchange (FOREX) rate. Approximately $14 million of the $38.7 million decrease is directly linked to using a FOREX rate of 1.13 instead of 1.18.

18 Q ARE YOU AWARE THAT NSPI HEDGES ITS US DOLLAR REQUIREMENTS?
18 Q ARE YOU AWARE THAT NSPI HEDGES ITS US DOLLAR REQUIREMENTS? 19 A Yes. NSPI states that its guidelines are to hedge 30% to 60% of each of the four 20 forward years and only have a maximum of 30% open for the next 12 months. The 21 hedge...

AI summary NSPI hedges 30% to 60% of its US dollar requirements over 20 forward years, with a maximum of 30% open for the next 12 months. The hedging strategy is meant to protect both NSPI and customers. The Board is asked whether it is fair to adjust the test year fuel cost by the full amount of the calculated reduction, with a response suggesting that if the Board is convinced of NSPI's prudent actions, 70% of a $14 million reduction could be included in test year expenses.

7 Q IN THE 2002 RATE CASE DECISION, IT STATES IN PARAGRAPH NUMBER 85,
7 Q IN THE 2002 RATE CASE DECISION, IT STATES IN PARAGRAPH NUMBER 85, 8 If the rate-making process were based on the most up-to-date 9 numbers, as opposed to forward-looking data derived from 10 experience over the longer term, each month...

AI summary The text discusses the Board's position on using updated information in the rate-making process, emphasizing that relying on the most up-to-date data rather than forward-looking data can lead to frequent changes in revenue requirements. It also addresses concerns about NSPI's use of stale data and the fairness of allowing unilateral discretion in choosing fuel forecast timing.

17 Q WHAT EVIDENCE DO YOU HAVE THAT NSPI'S FUEL COSTS PER MWH IN 2008 18 WOULD BE LESS THAN ITS COST PER MWH FOR 2007?
17 Q WHAT EVIDENCE DO YOU HAVE THAT NSPI'S FUEL COSTS PER MWH IN 2008 18 WOULD BE LESS THAN ITS COST PER MWH FOR 2007? 19 A In the first place, the most recent outlook for fuel prices9 , as published by the Energy 20 Information Administra...

AI summary The response provides evidence that NSPI's fuel costs per MWH in 2008 would be lower than in 2007, citing declining fuel prices, a 17-month low in fuel oil prices, and a decline in imported low sulfur coal prices over the past 12-18 months.

Section 32
1 Q BASED ON NSPI'S HISTORY OF OVER-FORECASTING ITS FUEL COSTS, AND 2 THE EVIDENCE THAT SUGGESTS THAT 2008 FUEL COSTS, PER MWH, WILL 3 RECEDE FROM 2007 LEVELS, WHAT NORMALIZING ADJUSTMENT ARE YOU 4 RECOMMENDING FOR PURPOSES OF SETTING RATE...

AI summary The witness recommends a $68 million normalization adjustment to NSPI's fuel costs, citing historical over-forecasting and expected global fuel cost trends. The recommendation is based on public data and analysis provided in the exhibit schedules.

TABLE3
TABLE3 Reduction to NSPI's Fuel Forecast Million I (1) Solid Fuel 2007 Reduction $9.2 Commodity Related (2) 8.8 FOREX Related (3) =(1)+(2) $18.0 Total Solid (4) Oil and Gas 2007 Reduction 13.8 Commodity Related (5) 5.5 FOREX Related (6) =...

AI summary The text discusses a fuel cost reduction calculation for NSPI in 2007 and 2008, including commodity and FOREX-related adjustments. The witness clarifies that the normalization adjustment does not reflect disallowances or modifications based on imprudence or better fuel management, assuming NSPI's fuel management aligns with best practices.

Section 36
6 It should also be noted that NSPI acknowledges that it has not had any trouble 7 to date in securing capital and it has not had to post any letters of credit in order to 8 purchase fuel. 9 Furthermore, while I do agree that, all other th...

AI summary NSPI acknowledges it has not faced challenges in securing capital or posting letters of credit for fuel purchases. The Board emphasizes that NSPI's financial health should not override ratepayer interests, citing a past decision where $15.7 million in fuel costs were disallowed. The Board questions whether NSPI can address concerns about potential deviations between actual fuel costs and those used in rate calculations.

Section 37
FUEL COSTS WILL 4 MATERIALLY DEVIATE FROM THE AMOUNT OF FUEL THAT YOU SUGGEST 5 FORM THE BASIS OF THE NEW RATES. IN THAT CASE, CAN YOU OFFER ANY 6 SUGGESTIONS THAT MIGHT ASSUAGE SUCH CONCERNS? 1 Q 7 A Yes. In that case, for the period Apri...

AI summary The text discusses concerns about fuel costs deviating from those used to set new rates and suggests a mechanism to address such deviations. It proposes tracking differences in actual fuel costs and deferring excess variances beyond a specified threshold to ensure stability.

8 4. RATE BASE ADJUSTMENT
8 4. RATE BASE ADJUSTMENT 9 Q DO YOU HAVE ANY CHANGES TO NSPI'S PROPOSED RATEMAKING RATE 10 BASE? 11 A Yes. I recommend that the Board reduce the that 12 NSPI has included in rate base from $47.5 million to $9.3 million. 13 Q HOW DID NSPI...

AI summary The document discusses a recommendation to reduce Nova Scotia Power Inc.'s (NSPI) proposed rate base from $47.5 million to $9.3 million, arguing that using the 2007 forecast is more appropriate as the new rates will take effect in April 2007. Additionally, the recommendation opposes NSPI's request to retroactively defer fuel costs, citing issues with regulatory fairness and precedent.

9 Q BUT IF FUEL COSTS DO INCREASE IN 2007 AND NEW RATES ARE NOT PUT 10 INTO EFFECT UNTIL APRIL 1, IS THAT NOT UNFAIR TO NSPI?
9 Q BUT IF FUEL COSTS DO INCREASE IN 2007 AND NEW RATES ARE NOT PUT 10 INTO EFFECT UNTIL APRIL 1, IS THAT NOT UNFAIR TO NSPI? No. Subject only to any legislative limitation that may come into force, NSPI has complete discretion as to when...

AI summary The question challenges NSPI for delaying rate filings until October 10, leading to new rates not taking effect until April 2007. The response states that NSPI has discretion in filing rate cases and that any delay is the responsibility of NSPI's management, not a justification for customers paying an additional $18.5 million.

4 Q WHY DOES NSPI ARRIVE AT THEIR ANOMALOUS AND MISLEADING RESULT?
4 Q WHY DOES NSPI ARRIVE AT THEIR ANOMALOUS AND MISLEADING RESULT? 5 A As best I can determine (because NSPI does not provide intervenors with an 6 electronic version of its workpapers}, this inaccuracy is introduced because NSPI 7 allocat...

AI summary NSPI's method of allocating gas resale profits to the month of sale leads to an inaccurate representation of winter electricity costs, artificially lowering the apparent cost of electrical energy consumption in the winter and undermining the effectiveness of demand-side management (DSM).

14 Q HOW DID YOU DERIVE YOUR MONTHLY FUEL COSTS?
14 Q HOW DID YOU DERIVE YOUR MONTHLY FUEL COSTS? 15 A I essentially derived an actual cost per MWh of fuel burned by dividing the actual fuel 16 cost in each month, as provided in NSPI's response to SEB IR-55, by the total MWh 17 system re...

AI summary The witness explains how monthly fuel costs were derived by dividing actual fuel costs by total MWh system requirement and allocating them to classes. They also address the allocation of profit from resold gas and note that their method does not fully address the Board's concern about high load factor customers being overcharged.

IN YOUR OPINION, HOW SHOULD THIS BOARD ARRIVE AT AN APPROPRIATE DISALLOWANCE FOR THE PRUDENTLY ALLOWED PORTION OF NSPI'S COAL COSTS?
IN YOUR OPINION, HOW SHOULD THIS BOARD ARRIVE AT AN APPROPRIATE DISALLOWANCE FOR THE PRUDENTLY ALLOWED PORTION OF NSPI'S COAL COSTS? Ms. Hennings has calculated what NSPI's coal costs would have been if they had been purchased at market pr...

AI summary The text discusses how the Board should determine an appropriate disallowance for NSPI's coal costs, suggesting that if the Board finds NSPI's costs imprudent, a reasonable disallowance would be half the difference between calculated market prices and actual test year costs, based on the 'used and useful' test.

Estimation of Proforma Fuel Cost For Normal Sales Volumes
Estimation of Proforma Fuel Cost For Normal Sales Volumes Line Description Amount (000) Source Nine months reduction due to Stora Enso shutdown and warmer weather 1 2 3 Fuel GWh Avoided Cost per MWh $ $ 74,500 1,026 72.61 Management Report...

AI summary The text provides an estimation of proforma fuel cost for normal sales volumes, including details on fuel GWh avoided cost, compliance MWh forecast, additional fuel cost, and proforma fuel cost per MWh. The calculations are based on data from management reports and tables.

N-21Direct Evidence - Colin V. Gubbins (Revised) on behalf of SEB - REDACTED 12 passages
HISTORY
HISTORY Nova Scotia Power is seeking a revision of electricity rates for 2007 as from April 1 st 2007. As a major element of cost, the manner in which NSPI purchases fuel is crucial in determining the rates that they seek from their custom...

AI summary Nova Scotia Power is seeking a rate revision for 2007, with a focus on fuel purchasing strategies. The Board has historically criticized NSPI's fuel purchasing decisions, particularly entering into coal contracts during market peaks and inadequate long-term contracts leading to exposure to price surges. The Board emphasizes the need for a portfolio of contracts to minimize risk, though caution is advised due to market instability.

[REDACTED]
[REDACTED] For the first 11 months of 2006 as illustrated in the following graph, the FOB (loaded into vessel) price of Colombian coal as recorded by the McCloskey Group has been $US 53.80 (basis 11700 Btu I lb) rather than $• as predicted...

AI summary The FOB price of Colombian coal for the first 11 months of 2006 was $53.80 per ton, as recorded by the McCloskey Group, contradicting the $• prediction by Hill and Associates used by NSPI in their 2006 submission.

Figure 2.10 of the application shows the following tonnage of coal to be uncommitted for 2007
Figure 2.10 of the application shows the following tonnage of coal to be uncommitted for 2007 Commodity Tonnage Heat Content Btu/Lb Forecast Price $C/MT FOB Low Sulphur Coal • • • Mid Sulphur Coal • • • High Sulphur Coal • • • Petroleum Co...

AI summary Figure 2.10 of the application outlines the tonnage of coal uncommitted for 2007. NSPI used a different methodology for calculating the price of uncommitted low sulphur coal in 2007 compared to 2006, where Hill and Associates' long-term forecast was previously relied upon.

Preamble
While this may have been the case, it is our understanding from responses supplied by NSPI that they were •. Their own advisors, EVA, also produce forecasts of prices that, ●, would have been available to EVA in advising NSPI of future pri...

AI summary The text discusses forecasts of future prices for high CV low sulphur Colombian coal, produced by EVA and other entities, and mentions that these forecasts were available to NSPI in advising them on future price movements. A graph comparing forecasts from multiple entities is referenced.

[REDACTED]
[REDACTED] In support of these forecasts Hill and Associates are of the view ● [Executive Summary International Coal Trade Supply Demand & Prices to 2015 Para E1] McCloskey's recent 'Steam Coal Forecaster Issue no 43' states in Para 1 on p...

AI summary The document discusses coal price forecasts, noting that prices are expected to decline in 2006 and 2007 due to supply and demand imbalances. NSPI's fuel procurement strategy is analyzed, highlighting the reliance on long-term contracts and the impact of adjusting short-term purchases based on 2006 prices.

Section 14
Extending this analysis to medium sulphur and high sulphur coal employing • forecasts\ (their load point basis is consistent with NSPI's point of purchasing practice) and in the case of petroleum coke the forecasts commissioned from • in N...

AI summary The analysis extends to medium and high sulphur coal, using forecasts consistent with NSPI's purchasing practice, and highlights overestimates for 2007 based on petroleum coke forecasts commissioned in November 2006.

The Use of • Information
The Use of • Information • • The forward price curve for API2 represents energy trader's views of the delivered price of coal into Europe going forward. This represents a valuable tool for locking in the forward price of coal if you are co...

AI summary The document discusses the use of forward price curves for API2, a tool that helps utilities lock in coal prices for future delivery. It highlights the relationship between fuel prices and electricity prices, noting that utilities may pay a premium to ensure margins, which can cause forward curves to rise into contango, despite historical trends showing prices tend to fall over time.

Compliance with NSPI Fuel Manual.
Compliance with NSPI Fuel Manual. We note that across the information there is \bullet in the definition of what constitutes a long term contract. The latest Fuel Manual defines a long term contract as \bullet. While we are not hung up on...

AI summary The document discusses NSPI's compliance with the NSPI Fuel Manual, highlighting inconsistencies in the definition of long-term contracts and the extent of coal commitments under medium-term contracts. It argues that NSPI has no long-term contracts in place and that their coal commitments exceed the limits set by the Fuel Manual.

Timing of Purchasing Decisions
Timing of Purchasing Decisions While we have concerns that NSPI appear to be disregarding their own procedures, in our past expert testimony we have argued for a flexible purchasing strategy that recognises the extraordinary movement in co...

AI summary The text discusses concerns about Nova Scotia Power Inc.'s (NSPI) purchasing decisions, particularly entering into long-term coal contracts at high prices when market conditions were unfavorable. It argues that these decisions led to unnecessary costs and suggests that NSPI should have adopted a more flexible strategy, waiting for market normalization before committing to long-term contracts.

Subsequent Purchases of Coal
Subsequent Purchases of Coal Subsequent to the application, NSPI have made further purchases of coal. It has replaced • tonnes of • coal with • coal purchased on • contract, and supplemented their purchase programme with a further • tonnes...

AI summary NSPI made subsequent coal purchases after the application, replacing some coal with purchases under a new contract, which may have prevented them from benefiting from lower market prices in 2007. The impact of this decision is estimated at $•, and there is concern about why the Board was not informed of these decisions during the application process.

Over Run into Ql 2008
Over Run into Ql 2008 It is our understanding that the electricity rates as approved by the Board will cover the first quarter of 2008 and possibly subsequent years. Since NSPI have less coal committed in 2008, and the price that they buy...

AI summary The document discusses the potential savings in fuel costs for NSPI in the first quarter of 2008 due to lower coal prices and changes in coal commitments. It estimates significant savings from reduced fuel costs across various fuel types, with total annual savings projected to be $270.4 million.

CONCLUSION
CONCLUSION If the rates agreed are to run until the end of March 2008 at the earliest, it is important to calculate the overestimate of costs for the three months of 2008 in addition to the 9 months in 2007. 2007 9 months overestimate = 9/...

AI summary The document calculates the overestimation of costs for NSPI from April 2007 to March 2008, considering both the agreed rates and the impact of purchasing decisions made in 2005 and 2006. It determines that a disallowance should be made for solid fuel costs during this period.

N-22Direct Testimony and Exhibit - Michael Gorman (on behalf of Stora Enso/ Bowater) 3 passages
1 Q WHY SHOULD NSPI'S AUTHORIZED RETURN ON EQUITY BE REDUCED IF A 2 FUEL DEFERRAL OR SIMILAR MECHANISM IS APPROVED? 3 A A reduction to NSPI's authorized return on equity is appropriate if the Board approves 4 a fuel deferral account or similar regulatory mechanism in this proceeding. Such 5 regulatory mechanisms can lower NSPI's operating risk by helping to stabilize cash 6 flow via fuel cost recovery. Implementing regulatory mechanisms that reduce this 7 operating risk will shift fuel price volatility risk to customers from NSPI, thus reducing 8 NPSI's risk and increasing customers' price variability risk. 9 Further, in the Board's order in authorizing NSPI's current 9.55% return on 10 equity, the Board clearly found that that authorized return on equity was made in 11 recognition that a Fuel Adjustment Mechanism (FAM) would not be implemented. 12 The evidence in that case indicated that if a FAM was implemented, NSPI's cost 13 would be approximately 0.50 percentage points lower. 14 As such, if a fuel deferral or similar mechanism is implemented, reducing 15 NSPI's authorized return on equity is appropriate in recognition of the operating risk 16 reduction, and customers are entitled to reduced non-fuel rates as compensation for 17 assuming NSPI's fuel cost risk. 18 2. LOWER INTEREST RATES 19 Q PLEASE EXPLAIN WHY YOU BELIEVE LONG~TERM CANADIAN BOND YIELDS 20 HAVE DECLINED SIGNIFICANTLY RELATIVE TO THE COST OF CAPITAL 21 ANALYSES SUPPORTING NSPI'S CURRENT AUTHORIZED RETURN ON
CURRENT AUTHORIZED RETURN ON 23 A NSPI's current authorized return on equity was originally set by the Board in its 24 Decision NSUARB-NSPI-P-881, 2005 NSUARB 27, March 31, 2005. In that 22 EQUITY. 1 Decision, the Board found a 9.55% retur...

AI summary The authorized return on equity for NSPI may be reduced if a fuel deferral mechanism is approved, as it lowers NSPI's operating risk and shifts fuel price volatility to customers. The current 9.55% return on equity was set in 2005 based on a 5.0% Canadian bond yield, but long-term bond yields have since declined significantly.

Preamble
1 return on equity reduction of 0.6% if a FAM was approved. As such, if the Board 2 approves a fuel deferral or other regulatory mechanism in this proceeding, then 3 NSPI's authorized return on equity should be reduced by approximately 0.5...

AI summary The text discusses a potential reduction in Nova Scotia Power Inc.'s authorized return on equity if a fuel deferral or other regulatory mechanism is approved by the Board, with a suggested reduction of approximately 0.5 percentage points.

5 Q WHAT RETURN ON EQUITY WOULD BE APPROPRIATE FOR NSPI IN THIS 6 PROCEEDING IF A FUEL DEFERRAL OR SIMILAR REGULATORY MECHANISM 7 IS APPROVED?
5 Q WHAT RETURN ON EQUITY WOULD BE APPROPRIATE FOR NSPI IN THIS 6 PROCEEDING IF A FUEL DEFERRAL OR SIMILAR REGULATORY MECHANISM 7 IS APPROVED? 8 A Excluding consideration of adoption of a fuel deferral mechanism, NSPI's current 9 9.55% aut...

AI summary The response discusses the appropriate return on equity (ROE) for NSPI in the proceeding, considering a fuel deferral mechanism. It suggests reducing the current authorized ROE of 9.55% by at least 55 basis points to 9.0% without the mechanism. With a proposed fuel deferral mechanism, the ROE should be reduced by less than 0.5%, and potentially 0.25 percentage points, resulting in an ROE of 8.75%.

N-26RIR 1 - Manfred Raschke, ISIS to NSUARB -REDACTED 3 passages
RESPONSE TO INFORMATION REQUESTS
RESPONSE TO INFORMATION REQUESTS To: Board Staff Nova Scotia Utility and Review Board From: Manfred Raschke, ISIS Nova Scotta Utility and Review Board IR-1: Reference Testimony of Manfred Raschke, Pages 3-4 Please provide a summary table s...

AI summary The response to an information request by Manfred Raschke, ISIS, asks for a summary table of recommended changes to the NSPI's test year fuel and purchased power costs of $498.7 million, including the recommended total fuel and purchased power costs and reasoning.

Please see the table below, which makes the adjustments proposed in the Summary Findings of the ISIS Testimony. The footnotes to the table explain the
Please see the table below, which makes the adjustments proposed in the Summary Findings of the ISIS Testimony. The footnotes to the table explain the Fuel by Type Million C$ Proposed Rates Test Year Forecast 2007 Proposed ISIS Revisions S...

AI summary The table presents proposed adjustments to fuel costs for different fuel types based on the Summary Findings of the ISIS Testimony. Solid fuel, bunker C, and diesel are among the fuels with proposed revisions, while natural gas and furnace remain unchanged. The total fuel cost for generation is reduced from 491.8 to 448.4 million C$.

RESPONSE TO INFORMATION REQUESTS
RESPONSE TO INFORMATION REQUESTS To: Board Staff Nova Scotia Utility and Review Board From: Manfred Raschke, ISIS reduction in LFO costs, but rather an estimate was made of a reduction of C$2.6 million from the requested C$5.2 million need...

AI summary The response discusses the reduction in LFO costs and the impact of HFO costs on natural gas availability for resale. It notes that ISIS did not prepare a separate natural gas forecast and highlights inconsistencies between the $6.4 million figure and oil price forecasts.

N-28RIR 1 to 12 - Manfred Raschke to NSPI REDACTED 6 passages
RESPONSE TO INFORMATION REQUESTS
RESPONSE TO INFORMATION REQUESTS To: NSPI From: Manfred Raschke IR-1: Please describe the scope of your engagement by A von in NSPI's 2007 Rate Application. Response: ISIS was requested by A von to review the fuel portions of NSPI' s Rate...

AI summary Manfred Raschke responds to an information request regarding ISIS's engagement in NSPI's 2007 Rate Application, stating that ISIS was asked to review the fuel portions and assess the reasonableness of fuel forecasts.

RESPONSE TO INFORMATION REQUESTS
RESPONSE TO INFORMATION REQUESTS To: NSPI From: Manfred Raschke IR-4: Please explain your understanding as to how NSPI's hedging activities affect its HFO and natural gas costs in the test year. Response: NSPI uses a hedging program that i...

AI summary NSPI explains its hedging program, which aims to reduce the impact of market price fluctuations on HFO and natural gas costs. The response highlights the use of financial instruments with fixed prices to manage floating price obligations, but notes a lack of clarity in documenting hedging decisions and approval levels.

RESPONSE TO INFORMATION REQUESTS
RESPONSE TO INFORMATION REQUESTS To: NSPI From: Manfred Raschke IR-5: Please list the factors that could cause oil prices to spike or increase in 2007. Response: Among the factors that could cause oil factors to spike or increase in 2007 a...

AI summary The response outlines factors that could cause oil prices to spike in 2007, including hurricanes, terrorist attacks, and geopolitical conflicts. It also notes that market psychology and stock levels influence price impacts, citing recent trends in fuel oil consumption and investor behavior.

RESPONSE TO INFORMATION REQUESTS
RESPONSE TO INFORMATION REQUESTS To: NSPI From: Manfred Raschke IR-6: Please provide your understanding of the value of volume options in coal supply agreements. What is the appropriate way to value options? Response: The contractual~sion...

AI summary The response explains the value of volume options in coal supply agreements, emphasizing flexibility and price protection. It discusses valuation methods such as the Black-Scholes and binomial models, noting challenges in obtaining volatility data for coal. The responder also mentions that including such options may lead to higher fixed prices in contracts.

RESPONSE TO INFORMATION REQUESTS
RESPONSE TO INFORMATION REQUESTS To: NSPI From: Manfred Raschke IR-8: Reference page 2 middle paragraph "Such a 13% increase in electricity cost due to charges in commodity prices in 2007 seems highly inappropriate when consensus forecasti...

AI summary The response discusses the impact of near-term commodity price fluctuations on fuel and purchase power forecasts, noting that a diversified portfolio of fuel contracts helps levelize prices but limits the ability to benefit from significant price drops. The majority of the commodity cost increase is attributed to higher oil prices, specifically Heavy Fuel Oil (HFO) and Light Fuel Oil (LFO).

IR-10: Reference page 17 second paragraph
IR-10: Reference page 17 second paragraph - (a) Does Dr. Raschke suggest that global oil prices have increased enough to slow global economic growth? How much of an increase in oil prices is necessary to slow growth of global economies? -...

AI summary Dr. Raschke discusses the impact of high oil prices on global economic growth, noting that while increased prices may slow growth, the effects are moderated by globalization and central bank policies. He contrasts current conditions with past oil crises and highlights the Federal Reserve's focus on inflation.

N-31RIRs 1 to 5 - Consumer Advocate Response to IRs from NSPI 2 passages
IR-1 Reference page 7
IR-1 Reference page 7 Are Ms. Brockway or the CA requesting as a result of Ms. Brockway's evidence on fuel cost estimates that the Board revisit and increase the ELI 2P-RTP base energy charge in the current proceeding? If so, what level of...

AI summary The question asks whether Ms. Brockway or the CA is requesting the Board to increase the ELI 2P-RTP base energy charge based on fuel cost estimates. It also inquires about the proposed increase and its evidentiary support, with a note that non-ELI customers may need to cover any difference between past and current fuel cost estimates.

IR-4 Reference pages 18 to 23
al rate case. c) With respect to fuel costs incurred in the first quarter of a calendar year 2007 test period, please explain how recovery of such costs breaches the test year approach to ratemaking. The test year approach develops an esti...

AI summary The document discusses concerns about the proposed method of recovering fuel costs in the rate case, arguing that it deviates from the test year approach by including costs incurred before rate changes and locking in higher costs. It also questions whether the Consumer Advocate and Ms. Brockway support a fuel adjustment mechanism that allows for rate decreases when fuel costs decline.

N-32RIRs 1 to 16 - Nancy Brockway (on behalf of Consumer Advocate) to Stora Enso/ Bowater (SEB) 2 passages
RESPONSES TO INFORMATION REQUESTS
RESPONSES TO INFORMATION REQUESTS To: Stora Enso Port Hawkesbury Limited and Bowater Mersey Paper Company Limited ("SEB") From: Nancy Brockway (On behalf of the Consumer Advocate) Nova Scotia Utilitr a.ul~Ufi.w Board - IR-1. On page 4, Ms....

AI summary The Consumer Advocate, Nancy Brockway, explains that the $52.12 base energy charge for ELIIR-2 customers is consistent with a fuel cost range of $430 to $434 million, citing COSS runs and Dr. Stutz's calculations. The charge includes a credit for economic interruptibility based on the same fuel cost budget.

IR-9. On page 27, Ms. Brockway discusses tolerable burdens for residential households:
IR-13. Please specifically identify all low-income energy programs that Ms. Brockway is recommending in this proceeding, and quantify how the funding of -those programs will impact other ratepayers. RESPONSE: See the answer to question 9a....

AI summary The document includes questions and responses related to low-income energy programs, Mr. Colton's report, and the impact of recommendations on revenue requirements. It also references a past Board decision regarding fuel cost allocation and asks for further evidence on hourly versus monthly allocation methods.

N-34RIR 1 to 6 - NSPI to John Antonuk, Donald T. Spangenberg, Jr. and John B. Adger, Jr, Liberty Consulting Group 2 passages
IR-2 Question:
RESPONSE TO INFORMATION REQUEST TO: John Antonuk, Donald T. Spangenberg, and John B. Adger, Jr. The Liberty Consulting Group FROM: Nova Scotia Power Inc. IR-2 (Continued) of the attached Discussion Summary took place between the time of ou...

AI summary Nova Scotia Power Inc. responds to an information request regarding the fuel adjustment mechanism, noting that its structure determines the extent to which it can mitigate the risk of over- or under-recovery of prudently incurred fuel costs. The response also references a prior rate case and discusses the need for a reasonable and realistic evaluation of alternatives.

IR-5 (Continued)
IR-5 (Continued) Budgeted Costs: $240,000 Final Costs: $240,000 Note: Report is Confidential Focused Audit of Affiliate Transactions and Management Audit of South Jersey Gas Company, for the New Jersey Board of Public Utilities Budgeted Co...

AI summary The text discusses Nova Scotia Power Inc.'s response to a question regarding the use of mid-2006 fuel price estimates for rate-setting, with Liberty Consulting Group arguing that more recent data should be used due to fuel price volatility and the need to minimize over- or under-collection of fuel costs.

N-35RIR 1 to 8 - Stora Enso/ Bowater (SEB) to John Antonuk, Donald T. Spangenberg, Jr. and John B. Adger, Jr., Liberty Consulting Group 1 passage
Response:
Response: - a. The information in the chart on page 12 of the Liberty evidence was taken directly from the NSPI response to SEB IR-94. Corresponding contract information was provided by NSPI in its response to SEB IR-95, including the spec...

AI summary The response indicates that information in the chart on page 12 of the Liberty evidence was directly sourced from NSPI's response to SEB IR-94, with additional contract details provided in the response to SEB IR-95, including supplier, contract length, and classification of fuels.

N-37RIR 1 to 11 - NSPI to John Stutz [Board Counsel Consultant] 2 passages
IR-2 Reference page 12, line 12
IR-2 Reference page 12, line 12 Dr Stutz identifies, as a factor which could cause NSPI's fuel cost forecast to be too high, the fact that NSPI included in its "low case" forecast an assumption that a large industrial customer (assumed by...

AI summary Dr. Stutz's evidence suggests that NSPI's low-case fuel cost forecast may be overstated due to the assumption of a large industrial customer (Stora Enso) closing in 2007. This assumption is considered a reasonable possibility and supports Dr. Stutz's recommendation to reject NSPI's request to defer first-quarter fuel costs.

IR-8 Reference page 13, lines 7-13
IR-8 Reference page 13, lines 7-13 - a) Please confirm that Dr Stutz: - i) recommends that rates for the test year should be based on the best estimate of costs for the test year based on evidence, regardless of their relationship to histo...

AI summary The document includes information requests to Dr. Stutz regarding fuel cost estimation for rate-setting and potential mechanisms to align 2008 rates with actual costs. Dr. Stutz recommends using the best estimate of test year costs and acknowledges historical data may be useful. A Fuel Adjustment Mechanism (FAM) is suggested as a potential solution.

N-38RIRs 1 to 10 - Colin Gubbins (on behalf of Stora Enso/ Bowater) to NSPI - REDACTED 2 passages
Response:
Response: I was requested to review and provide comments on NSPI's solid fuel procurement practices as they relate to the present application. - IR-3 Please provide data, in excel spreadsheets, for the following figures in your testimony:...

AI summary The requestor asked NSPI to provide detailed data on solid fuel procurement practices, including specific figures and explanations related to coal prices, forward pricing, and data sources. The data includes forecasts, comparisons, and plots for various time periods and regions.

Response:
Response: This information has been redacted and is only being provided to parties to the confidentiality undertaking. IR-5 Please provide a complete copy of "Steam Coal Forecaster Issue no 43" that you reference on the top of page 5 of yo...

AI summary The document contains redacted information provided under a confidentiality undertaking. It references a request for a complete copy of 'Steam Coal Forecaster Issue no 43' mentioned in testimony.

N-40RIRs 1 to 13 - Dr. Alan Rosenberg [SEB] to NSPI 12 passages
Question No. IR-4:
Question No. IR-4: Please provide the following information for each of the utilities listed in Exhibit AR-1: - a. Mix of fuels in 2005 as measured by Btus purchased or generation. - b. Delivered prices of each fuel YTD 2006. - c. Average...

AI summary The document requests specific fuel-related information for utilities listed in Exhibit AR-1, including fuel mix in 2005, delivered fuel prices for 2006, and average coal quality for 2006.

Reference Fuel Cost Evidence.
Reference Fuel Cost Evidence. Please identify, in your qualifications , your experience as an expert witness with respect to fuel costs and fuel procurement.

AI summary The text requests the identification of an expert's experience with fuel costs and procurement, specifically in the context of being an expert witness.

Response:
Response: Dr. Rosenberg is not offering testimony in this case on fuel procurement, but only on the calculation of fuel costs given more recent evidence on actual purchases and gas and oil price forwards, as well as the accuracy of previou...

AI summary Dr. Rosenberg is not testifying on fuel procurement but on the calculation of fuel costs based on recent evidence and the accuracy of NSPI's previous forecasts. He has extensive experience in energy economics and serves as an advisor to the City of New York on energy procurement and risk management.

Question No. IR-6:
Question No. IR-6: Please list all investor owned electric utilities in North America of which you are aware that do not have fuel adjustment mechanisms. Please identify whether the utility provides any or all of generation, distribution a...

AI summary The question asks for a list of investor-owned electric utilities in North America that do not have fuel adjustment mechanisms and whether they provide generation, distribution, and/or transmission services.

Question No. IR-7:
Question No. IR-7: Please list all utilities that have a fuel adjustment mechanism similar to the one which you advocate for NSPI on pages 23 through 25 of your testimony. For each, please provide documentation as to each specific mechanis...

AI summary The document requests a list of utilities with fuel adjustment mechanisms similar to the one advocated for NSPI, along with specific documentation for each mechanism.

Response:
Response: Dr. Rosenberg is not proposing a fuel adjustment mechanism in this case, but rather a fuel deferral mechanism. Utilities that have fuel adjustment mechanisms normally defer fuel costs to match their fuel recovery. Dr. Rosenberg i...

AI summary Dr. Rosenberg is proposing a fuel deferral mechanism rather than a fuel adjustment mechanism, arguing that it is more advantageous to the utility. He notes that most utilities use fuel adjustment mechanisms to defer fuel costs.

Question No. IR-8:
Question No. IR-8: - a. Please provide copies of testimony by this consultant in other proceedings and jurisdictions, if any, in which: - i. The consultant has suggested that a fuel forecast be reduced to account for "a tendency to oversta...

AI summary The document requests information on a consultant's past testimony regarding fuel forecasts, normalization adjustments in ratemaking, examples of regulator decisions reducing test year expenses, and the application of normalization when future expense increases are anticipated.

Response:
Response: a. - i. Dr. Rosenberg has not offered testimony, prior to this case, suggesting that a fuel forecast be reduced to account for a tendency to overstate or overestimate fuel costs. However, it should also be noted that: ( 1) in cas...

AI summary Dr. Rosenberg has not previously testified about reducing fuel forecasts due to overestimation, but acknowledges regulatory precedents where forecasts were adjusted based on past misforecasting. An example is cited from the ATCO Electric Ltd. 2005-2006 General Tariff Application.

Response to Question No. IR-8 (continued):
Response to Question No. IR-8 (continued): The term pro-forma adjustment is consonant with the expression "normalization" as Dr. Rosenberg uses that term of art on pages 12-13 of his testimony. Thus, the very concept of a future test year...

AI summary The document discusses the use of 'pro-forma adjustment' and 'normalization' in rate-making, referencing a 2002 Nova Scotia Power rate case. It emphasizes that rate-making should be prospective, not retroactive, and that fuel costs in the test year must be adjusted to reflect more accurate, normalized estimates. A 10% reduction in coal costs was deemed reasonable to align with historical averages.

Question No. IR-9:
Question No. IR-9: Please provide complete copies of all testimony prepared by you in the last 10 years (redacted as appropriate) related to the adoption or rejection of a fuel adjustment mechanism.

AI summary The document requests complete copies of testimony related to the adoption or rejection of a fuel adjustment mechanism over the past 10 years, with appropriate redactions.

Response:
Response: With the exception of his testimony in NSPI's 2005 Rate Application, to the best of his recollection, Dr. Rosenberg has not testified on that topic in the last ten years, nor is he testifying on the adoption or rejection of a fue...

AI summary Dr. Rosenberg has not testified on the adoption or rejection of a fuel adjustment mechanism in this case, except for his testimony in NSPI's 2005 Rate Application.

Response:
Response: a. Dr. Rosenberg recalls that before deregulation New York state for many years used fuel clauses with a sharing and/or a deadband. Dr. Rosenberg has not conducted research on all such utilities, as he is only addressing the situ...

AI summary Dr. Rosenberg discusses historical fuel cost adjustment mechanisms in New York and references a report on incentive-based fuel adjustment mechanisms (BFAM). He notes that a deadband and sharing feature was recommended for approval of a FAM in a prior proceeding, but the regulator declined to approve it.

N-40RIRs Attachment SEB-NSPI - 4a (Large File - 40 MB) 1 passage
Attachment SEB-NSPI-4a
Attachment SEB-NSPI-4a Name of Respondent (518) Fuel The state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the...

AI summary The provided text is a table fragment titled 'Attachment SEB-NSPI-4a' identifying respondents in a regulatory proceeding. It lists 'Fuel' as a respondent name but contains repetitive, nonsensical text ('the state of the state of...') in the associated data cells, providing no substantive information or arguments.

N-40RIRs Attachment SEB-NSPI - 2d (Large File - 20 MB) 71 passages
EXPLANATORY STATEMENT
EXPLANATORY STATEMENT By its order in Docket #18148 (consolidating Docket #18152) issued May 29, 1981, the Alabama Public Service Commission abolished Rate FT, effective upon the replacement thereof by procedure to be defined in the rates,...

AI summary The text explains the transition of the Alabama Public Service Commission's rate structure following an order issued on May 29, 1981. The order abolished 'Rate FT' and replaced it with a fuel cost recovery system modeled after Georgia's procedure. Specifically, 'Rate ECR' (Energy Cost Recovery) is being implemented to replace the previous Energy Cost Adjustment and its associated rules. Additionally, certain tax provisions from Rate FT are being retained and redesignated as 'Rate T'.

ENERGY COST RECOVERY FACTOR CALCULATION PROCEDURE (RATE ECR FORMULA)
ENERGY COST RECOVERY FACTOR CALCULATION PROCEDURE (RATE ECR FORMULA) The Energy Cost Recovery factor to be applied to each kilowatt-hour supplied by the Company under any base rate schedule of which this Rate ECR is made a part shall be ca...

AI summary The text outlines the calculation procedure for the Energy Cost Recovery Factor (ECRF) applied to retail kilowatt-hour sales. The ECRF is determined by summing the Estimated Total Energy Cost (ETEC) and the CF ETS. The ETEC component includes three primary elements: (1) estimated fossil fuel and emission allowance costs from specific Uniform System of Accounts, (2) estimated nuclear fuel costs, and (3) estimated purchased energy costs, excluding capacity or demand charges. The formula accounts for costs at the Company's plants, shared capacity, and affiliated company operations.

RATE ECR A SOUTHERN COMPANY ENERGY COST RECOVERY RATE
RATE ECR A SOUTHERN COMPANY ENERGY COST RECOVERY RATE PAGE EFFECTIVE DATE REVISION 3of6 November, 2001 Billings Second identifiable cost of fossil and nuclear fuel (together with costs, gains, or losses associated with emission allowances)...

AI summary This section of the document defines the Energy Cost Recovery (ECR) rate for Southern Company. It specifies that the rate is designed to recover the identifiable costs of fossil and nuclear fuels, including any associated gains or losses from emission allowances. It also accounts for the estimated average cost of these fuels in instances where specific costs are not actually identifiable, particularly regarding estimated inter-system sales.

Preamble
- (4) Gains, losses and costs associated with Company's utilization of futures, options and over the counter derivatives (including, without limitation, futures contracts, puts, calls, caps, floors , collars, and swaps) for the purpose of...

AI summary The text outlines the methodology for calculating the Energy Cost Recovery (ECR) factor, specifically focusing on the correction factor (CF) used to adjust prior estimates to actual data. It describes the process for calculating net under- or over-recoveries for retail customers by subtracting wholesale and retail energy cost recoveries from total energy costs. Additionally, it addresses the transition from the Fuel Tariff (FT) Energy Cost Adjustment to the ECR rate, requiring initial estimates for specific months in 1981.

A V AILABILilY !North Carolina Onlyl
A V AILABILilY !North Carolina Onlyl Service supplied under the Company's rate schedules are subject to approved fuel charge adjustments, if any, over or under the Rate set forth in the approved rate schedules. Adjustments are made pursuan...

AI summary The text specifies that services supplied under the Company's rate schedules are subject to approved fuel charge adjustments, which may be above or below the established rates. These adjustments are governed by North Carolina General Statute 62-133.2 and are subject to the orders of the North Carolina Utilities Commission.

APPROVED FUEL CHARGE ADJUSTMENTS
APPROVED FUEL CHARGE ADJUSTMENTS The Commission has ordered effective for service rendered on and after July I, 2006 that such an adjustment shall be included in the Company's rate schedules and an appropriate fuel cost adj ustment rider b...

AI summary The Commission approved adjustments to the fuel charge component of the Company's rate schedules, effective for service rendered on or after July 1, 2006. This includes the requirement for the Company to file an appropriate fuel cost adjustment rider. The Approved Fuel Cost was increased from the 1.1032 ¢/kWh base established in 1991 to 1.6770 ¢/kWh.

APPROVED FUEL COST
APPROVED FUEL COST The Approved Fuel Cost of I.6770 ¢I kWh will remain in effect until a new cost of fuel is established by the Commission.

AI summary The Commission has confirmed that the Approved Fuel Cost of I.6770 ¢/kWh will remain in effect. This rate is sustained until the Commission establishes a new fuel cost.

The following shows the calculation of the Approved Fuel Charge Adjustments:
The following shows the calculation of the Approved Fuel Charge Adjustments: Fuel Cost Effective Fuel Cost Effective July I, 2005. E-7. Sub 780 July I, 2006, E-7, Sub 805 Base Fuel Cost Effective November 12, 1991 Docket No. E-7, Sub 487 1...

AI summary The document provides a detailed calculation of the Approved Fuel Charge Adjustments for two periods: July 1, 2005, and July 1, 2006. It outlines the progression from the Base Fuel Cost Effective (established in 1991) through various adjustments including approved fuel costs, Experience Modification Factors (EMF), and interest. The calculations account for a Deferred Tax Decrement Rider and the Gross Receipts Tax Multiplier to determine the final change in rates for the respective periods.

APPLICABILITY
APPLICABILITY This adjustment is applicable to and is a part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of Fuel in an amount to the nearest one ten-thousandth...

AI summary The text specifies the applicability of a fuel cost adjustment to the Utility's South Carolina retail electric rate schedules. It outlines that the Public Service Commission will include fuel costs in the base rates, calculated to the nearest one ten-thousandth of a cent using a specific formula (F=EIS + G/S1), subject to the Commission's determination of reasonableness and propriety.

Where:
Where: F = Fuel cost per kilowatt-hour included in base rate, rounded to the nearest one ten-thousandth of a cent. E = Total Projected system Fuel costs: (A) Fuel consumed in the Utility's own plants and the Utility's share of fuel consume...

AI summary The text provides the methodology for calculating the Fuel cost per kilowatt-hour (F) included in the base rate. It specifies that the total projected system fuel costs (E) must include fuel consumed in the Utility's own plants and its share of jointly owned or leased plants. It further defines the inclusion criteria for fossil fuel and nuclear fuel costs based on specific accounts within the Commission's Uniform System of Accounts for Public Utilities and Licensees, while excluding specific items like rental payments.

Plus
Plus (B) Fuel costs related to purchased power (and applicable S02 emission allowances) such as those incurred in unit power and limited term power purchases where the fossil fuel costs and applicable S02 emission allowances associated wit...

AI summary The text defines specific fuel costs eligible for inclusion in the Fuel Tariff (FT). These include costs associated with purchased power (such as unit and limited-term power purchases) where fossil fuel costs and SO2 emission allowances are identifiable in billing statements. Additionally, it defines 'firm generation capacity purchases' as costs incurred to address capacity deficiencies or maintain reserve levels, specifically excluding reservation charges, option charges, and other capacity-related fees.

Minus
Minus (D) The cost of fuel and applicable S02 emission allowances recovered through intersystem sales including the fuel costs and applicable S02 emission allowances related to economy energy sales and other energy sold on an economic disp...

AI summary The text defines the methodology for calculating fuel costs (F) and sulfur dioxide (S02) emission allowances in the context of energy sales. It distinguishes between intersystem sales, economy energy sales, and non-billing transactions like diversity energy. The calculation incorporates projected system kilowatt-hour sales, cumulative jurisdictional fuel revenue differences, and revenue-related tax factors. It specifically cites a fuel cost of 1.7760 cents per kilowatt-hour from a South Carolina Public Service Commission Order.

STANDARD CONTRACT RIDER NO. 60 FUEL COST ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES
STANDARD CONTRACT RIDER NO. 60 FUEL COST ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES A. The applicable charges for electric service to the Company's retail customers shall be increased or decreased, to the nearest 0.001 mill ($0.000...

AI summary The document outlines the methodology for Standard Contract Rider No. 60, which establishes the Fuel Cost Adjustment applicable to all retail rate schedules. It specifies that charges for electric service to retail customers will be adjusted—increased or decreased to the nearest 0.001 mill per KWH—based on a formula designed to recover or credit the costs associated with fuel. The formula is defined as the Fuel Cost Adjustment Factor, calculated by dividing total projected system fuel costs by estimated total energy sales, minus a fixed correction factor.

where:
where: - 1. "F" is the estimated expense of fuel based on a three-month average cost beginning with the first month of the billing cycle and consisting of the following costs: - (a) the average cost of fossil fuel consumed due to the opera...

AI summary The text defines the methodology for calculating the fuel cost adjustment factor for native load customers. It specifies the components of estimated fuel expenses (F), including fossil and nuclear fuel costs for company-owned units and purchased energy, as well as estimated kilowatt-hour sales (S). The formula includes modifications for utility receipts taxes, a mechanism to reconcile differences between estimated and actual incremental fuel costs, and a specific fixed adjustment rate of $0.004520 per kilowatt-hour effective from 2007.

APPLICABILITY
APPLICABILITY Electric service billed under rate schedules having a Fixed Fuel Factor Clause shall be subject to a Fixed Fuel Factor.

AI summary The document specifies the applicability of the Fixed Fuel Factor. It states that electric service billed under rate schedules that include a Fixed Fuel Factor Clause will be subject to the Fixed Fuel Factor.

The Fixed Fuel Factors recognize loss adjustments due to different voltage levels of service:
The Fixed Fuel Factors recognize loss adjustments due to different voltage levels of service: Energy Loss Factor Fixed Fuel Factor ($/KWH) A. Texas System 1.00000 0.03631 (I) B. Transmission Voltage (If customer is not specified below and...

AI summary The document outlines the Fixed Fuel Factors and Energy Loss Factors for the Empire District Electric Company. It specifies different fuel factors based on voltage levels of service, including transmission, primary, and secondary voltages. Additionally, it introduces the '16 YRIDER (Rider ECR)' (Energy Cost Recovery Rider), which allows the company to recover energy costs as defined in the tariff for specific rate schedules.

38.1 RECOVERY OF ENERGY COST
38.1 RECOVERY OF ENERGY COST (NR) Energy Cost Recovery Rider ECR ("Rider ECR") defines the procedure by which the "Energy Cost Rate" of Entergy Arkansas, Inc. ("EAI''. or "Company") shall be initially established and periodically redetermi...

AI summary The text describes the Energy Cost Recovery Rider (Rider ECR) for Entergy Arkansas, Inc. (EAI). This rider establishes the procedures for the initial determination and periodic redetermination of the 'Energy Cost Rate.' The primary purpose of this rate is to recover the Company's net fuel and purchased energy costs, which are specifically defined within the Rider ECR framework.

38.3 ANNUAL REDETERMINATION
38.3 ANNUAL REDETERMINATION On or before March 15 of each year beginning in 1999, the Company shall file a redetermined Energy Cost Rate with the Commission. The redetermined Energy Cost Rate shall be determined by application of the Energ...

AI summary The text outlines the annual redetermination process for the Energy Cost Rate (ECR) for Entergy Arkansas, Inc. The Company is required to file a redetermined rate by March 15 annually, calculated using a specific formula and accompanied by supporting workpapers. The rate must reflect projected energy costs for the upcoming 12-month period, including a true-up adjustment for over- or under-recoveries from the previous calendar year. These rates are effective for a twelve-month 'Rider Cycle' starting in April.

ENERGY COST RATE FORMULA
ENERGY COST RATE FORMULA ECR ENERGY COST RATE ECR (TUA + PEC) / PES (RT) WHERE, TUA TRUE-UP ADJUSTMENT FOR THE ENERGY COST PERIOD INCLUDING CARRYING CHARGES (1) = \sum_{j=1}^{12} (EC_j - (RR_j - PTU_j)) \ (1 + CCR \ ((21 - j) / 12)) (RT) W...

AI summary The text provides the mathematical formula for the Energy Cost Rate (ECR), which is calculated by dividing the sum of the True-Up Adjustment (TUA) and Projected Energy Cost (PEC) by the Projected Energy Sales (PES). The formula specifically defines the True-Up Adjustment, which accounts for energy costs including carrying charges, and details the components of energy costs such as fuel expenses charged to specific accounts, excluding certain retained share fuel charges for the Grand Gulf project.

FUEL COST RECOVERY SCHEDULE: "FCR-18"
FUEL COST RECOVERY SCHEDULE: "FCR-18" 才是"我们的是否是不是这个一个是否是不是我们的人的,我们就是我们的人的人的人的人的人的人的人的人的人的人的人的人的人的人,我们就是这个人的人的人,我们就是这一个 是44年的基金全部经济1000元(1900年)。 CHARLES AND REPORT OF THE PACE THE PACE DEMICION DACENO PAGE EFFECTIVE DATE KEVIOIUN PAGE NO. 1...

AI summary The provided text is a fragment of a regulatory document titled 'FUEL COST RECOVERY' regarding Schedule 'FCR-18'. It contains a table header and some illegible or nonsensical placeholder text in Chinese and English. The document indicates it pertains to bills rendered for the billing month of July 2006, but it does not contain substantive arguments, data, or narrative content in this specific chunk.

APPLICABILITY:
APPLICABILITY: This schedule is applicable to and becomes a part of each retail rate schedule in which reference is made to the Fuel Cost Recovery Schedule.

AI summary The document specifies the scope of the Fuel Cost Recovery Schedule, stating that it is applicable to and integrated into every retail rate schedule that makes reference to the Fuel Cost Recovery Schedule.

All bills rendered subject to the Fuel Cost Recovery Schedule shall be respectively increased in an amount equal to:
All bills rendered subject to the Fuel Cost Recovery Schedule shall be respectively increased in an amount equal to: Secondary Distribution customers 3.0248¢ per kWh Primary Distribution customers 2.9767¢ per kWh Transmission customers 2.9...

AI summary The document specifies the rate increases for various customer classes subject to the Fuel Cost Recovery Schedule. It defines the specific cents-per-kWh amounts for Secondary Distribution customers (3.0248¢), Primary Distribution customers (2.9767¢), and Transmission customers (2.9389¢). The text also introduces the definition of Fuel Costs, which the subsequent section of the document would detail.

Section 62
- (1) fossil, nuclear, bio-mass (including renewable) fuel and emission allowances consumed in the Company's own plants, and the Company's share of fossil, nuclear, and bio-mass (including renewable) fuel and emission allowances consumed i...

AI summary The text outlines the specific components and adjustments used to calculate energy costs, particularly focusing on the treatment of fossil, nuclear, and biomass fuels, as well as emission allowances. It details the inclusion of costs from jointly owned plants, energy purchased for specific reasons, and net energy costs of purchases on an economic dispatch basis. Furthermore, it specifies deductions for costs recovered through intersystem sales, retail gains from emissions allowance sales, and a portion of wholesale market opportunity sales.

SCHEDULE: "FCR-18"
SCHEDULE: "FCR-18" PAGE EFFECTIVE DATE 2 of 2 With Bills Rendered for the Billing Month of July 2006 REVISION Original Zanionsproventendenning Co. 2 of 2 VVIIIn Bills Rendered for the Billing Month of July 2006 Original 9.00 - (7) net gain...

AI summary The document is a portion of Schedule 'FCR-18', which outlines specific components of a fuel cost recovery calculation. It specifically identifies the inclusion of net gains and losses from the Natural Gas and Oil Procurement and Hedging Program, as established in Docket No. 16134-U, as a factor in the calculation.

SENIOR CITIZEN- LOW INCOME ASSISTANCE:
SENIOR CITIZEN- LOW INCOME ASSISTANCE: Qualifying customers, after certification by the Company, will be eligible for a fuel cost recovery credit of $6.00 monthly at their primary residence. To qualify, the customer must be certified as el...

AI summary The document outlines the 'SENIOR CITIZEN- LOW INCOME ASSISTANCE' program, which provides a monthly fuel cost recovery credit of $6.00 to qualifying customers at their primary residence. Eligibility is determined by the Company following a certification process based on the R-15 tariff or its successor. The provision specifies that there shall be no net credits and no carry-over of credits between billing periods.

22. Employees Discount.
22. Employees Discount. Regular employees who have been in the Company employ for six months or more and are the head of the family or mainly responsible for maintenance of the premises they occupy may, at the discretion of the Company, se...

AI summary The document outlines the eligibility and pricing structure for residential electric bill discounts available to regular employees of the Company. To qualify, employees must have at least six months of service and be the primary residents of their premises. Specific rates are provided for standard service, storage water-heating systems, and time-of-day (TOD) load-management devices, with the latter featuring differentiated on-peak and off-peak pricing.

23. Fuel Cost Adjustment.
23. Fuel Cost Adjustment. A. The energy charges set forth in all rate schedules and those energy charges that are either included in the capacity or demand charges of such rate schedules or in the minimum billings under such rate schedules...

AI summary The text defines the methodology for the Fuel Cost Adjustment, specifying how energy charges in all rate schedules—including capacity and demand charges or minimum billings—will be adjusted. The adjustment is calculated based on the formula (F/S) minus a constant of $0.008609 per kWh, with changes rounded to the nearest 0.001 mill per kWh.

where:
where: 1. "F" is the estimated expense of fuel based on a three-month average cost beginning with the month immediately following the current billing cycle month and consisting of the following costs: (Cont'd on Sheet No. 3.18) ISSUED BY C...

AI summary The document provides a technical definition for 'F', which represents the estimated expense of fuel based on a three-month average cost starting after the current billing cycle month. It is part of the Thirty-second Revised Sheet No. 3.18 for the Indiana Michigan Power Company, issued under the authority of the Indiana Utility Regulatory Commission. The document specifies the effective date as December 23, 1997, and identifies the issuing officer as Coulter R. Boyle, III.

TERMS AND CONDITIONS OF SERVICE
TERMS AND CONDITIONS OF SERVICE (Cont'd from Sheet No. 3.17) - (a) the average cost of fossil and nuclear fuel consumed in the Company's own plants, such cost being only those items listed in Account 151 and Account 518 (exclusive of spent...

AI summary The text outlines the technical definitions and formulas used to calculate fuel costs and energy sales for a utility's rate structure. It specifies the inclusion of fossil and nuclear fuel costs from the Federal Energy Regulatory Commission's Uniform System of Accounts, excluding spent nuclear fuel disposal costs. It also defines 'S' as the estimated kilowatt-hour sales, calculated by summing net generation, purchases, and interchange-in, while subtracting intersystem sales, energy losses, and company use.

TERMS AND CONDITIONS OF SERVICE
TERMS AND CONDITIONS OF SERVICE (Cont=d from Sheet No. 3.18) - B. The adjustment factor as computed above shall be further modified to allow the recovery of gross receipts taxes and other similar revenue based tax charges occasioned by the...

AI summary The text outlines the terms and conditions for fuel cost adjustments, including mechanisms to recover gross receipts taxes and adjustments based on incremental fuel costs from the previous three months. It further specifies that certain subsections are suspended due to a 2005 Settlement Agreement (Cause No. 42045-S1). During this suspension, I&M is required to file semi-annual applications for fixed fuel adjustment charges, ensuring that fuel costs are not offset by other expense decreases and that the charges do not result in an unauthorized return.

APPLICABLE.
APPLICABLE. To Tariffs R.S., R.S.-L.M.-T.O.D. R.S.-T.O.D., S.G.S., M.G.S., M.G.S.-T.O.D., L.G.S., Q.P., C.I.P .-T.O.D., C.S.-l.R.P., M.W.,.O.L., end S.L. 1. The fuel clause shall provide for periodic adjustment per kwh of sales equal to th...

AI summary The text outlines the methodology for a fuel clause adjustment mechanism, which periodically adjusts the per-kWh sales rate based on the difference between fossil fuel costs in a base period and a current period. It defines 'Fuel costs (F)' to include costs from the utility's own plants, shared plants, and substitute power for forced outages, while excluding specific capacity charges and costs from intersystem sales. It also specifies the treatment of forced outages, noting that costs from Acts of God or public unrest may be included with Commission approval.

TARIFF F.A.C. (Cont'd) (Fuel Adjustment Clause)
TARIFF F.A.C. (Cont'd) (Fuel Adjustment Clause) - 5. Sales (S) shall be all kwh's sold, excluding intmystem sales. Where, for any reason billed system sales cannot be coordinated with the fuel costs for the billing period, sales may be equ...

AI summary This section outlines the regulatory requirements for a utility's Fuel Adjustment Clause (F.A.C.). It defines 'Sales' (S) as all kilowatt-hours sold, excluding intersystem sales, and specifies that fuel costs include the invoice price plus transportation charges. The regulation mandates that utilities submit fuel purchase contracts, justify price escalations, and provide detailed cost support for tariff filings. Furthermore, it establishes a framework for oversight, including monthly filings, public hearings every six months to review past adjustments, and a comprehensive biennial review to disallow improper expenses.

AVAILABILITY OF SERVICE
AVAILABILITY OF SERVICE This schedule is a mandatory rider to all electric rate schedules. (1) The charge per KWH delivered under the rate schedules to which this fuel clause is applicable shall be increased or decreased during each month...

AI summary The text outlines the mandatory 'Availability of Service' fuel clause rider, which establishes the formula for monthly adjustments to the charge per KWH delivered. It defines how fuel costs (F) are calculated, including fossil fuel consumption in own plants, costs for forced generation or transmission outages, and costs for energy purchased for reasons other than economic dispatch. It specifically excludes capacity or demand charges and requires fuel costs to be based on weighted average inventory costing.

Fuel Adjustment Clause
Fuel Adjustment Clause - (4) Sales (S) shall be all KWH's sold, excluding inter-system sales. 11\/here, for any reason, billed system sales cannot be coordinated Vvith fuel costs for the billing period, sales may be equated to the sum of (...

AI summary This document excerpt outlines the technical specifications and definitions for the Fuel Adjustment Clause (FAC). It defines the calculation of 'Sales (S)' as all kilowatt-hours sold excluding inter-system sales, while specifying that utility used energy is included. It defines the 'cost of fossil fuel' as the invoice price including transportation costs per the FERC Uniform System of Accounts. Additionally, it establishes the base period ending September 2004, the current period for billing, and the effective date of the clause.

FUEL CLAUSE RIDER
FUEL CLAUSE RIDER Kingsport Power is authorized under the terms of this rider to adjust customers' bills in each applicable tariff whenever the unit cost of fuel in the charges for power purchased from Appalachian Power Company under Feder...

AI summary The Fuel Clause Rider authorizes Kingsport Power to adjust customer billing based on the fluctuating unit cost of fuel purchased from Appalachian Power Company. The adjustment is triggered when the actual fuel cost deviates from a base unit price of 15.8563 mills per KWH, adjusted for losses. Calculations are performed monthly based on the most recent available calendar month data to ensure that customers pay the actual cost of fuel for the power consumed.

Fuel Clause Adjusment ...... ........ ... .... .. ........ ..... .. ..... .... . 2.6827 mills per kWh
Fuel Clause Adjusment ...... ........ ... .... .. ........ ..... .. ..... .... . 2.6827 mills per kWh TARIFF ENERGY CHARGE FUELADJMT. TOTAL ENERGY CHARGE R.S Residential 4.873 ¢I kWh 0.26827 ¢ I kWh 5.14 127 ¢ I kWh R.S E Employee 4.142 ¢/...

AI summary The document outlines the Fuel Clause Adjustment for Louisville Gas and Electric Company, effective October 2, 2006. It specifies a fuel adjustment rate of 2.6827 mills per kWh. The text provides a detailed tariff table listing various customer classes—including Residential, Small General Service, Medium General Service, Large General Service, Industrial Power, and Public Services—detailing their respective energy charges, fuel adjustments, and total energy charges.

Fuel Adjustment Clause
Fuel Adjustment Clause insurrection or acts of the public enemy, then the Company may, upon proper showing, with the approval of the Commission, include the fuel cost of substitute energy in the adjustment. (3) Sales (S) shall be determine...

AI summary The text outlines provisions regarding the Fuel Adjustment Clause, specifically addressing the inclusion of substitute energy costs during times of insurrection or acts of the public enemy, subject to Commission approval. It also defines the methodology for determining Sales (S) in kilowatt-hours, which includes the summation of net generation, purchases, and interchange-in.

Subtract:
Subtract: - (d) inter-system sales including economy energy and other energy sold on an economic dispatch basis - (e) total system losses - Pursuant to the Public Service Commission's Order in Case No. 2004-00466 dated May 24, 2005, the Fu...

AI summary The document outlines specific deductions to be made from a calculation, including inter-system sales of economy energy and total system losses. It also references a Public Service Commission Order (Case No. 2004-00466) establishing the effective date for the Fuel Adjustment Clause as July 2005. The document serves as a formal update to a previous sheet, with an effective date of June 30, 2005.

APPLICABILITY
APPLICABILITY This adjustment is applicable to and is a part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of fuel in an amount to the nearest one-thousandth of...

AI summary The text defines the methodology for calculating the fuel cost per kilowatt-hour (F) to be included in the Utility's South Carolina retail electric rate schedules. It establishes a formula accounting for total projected system fuel costs (E), including fuel consumed in own plants, purchased power (unit, limited term, and economy), and intersystem sales, divided by projected system kilowatt-hour sales (S). The calculation also incorporates a cumulative difference (G) between fuel revenues and expenses. The current fuel cost is set at 2.500 cents per kilowatt-hour.

Where:
Where: - F = Fuel cost per kilowatt hour included in base rate, rounded to the nearest one-thousandth of a cent. - E = Total projected system fuel costs: - (A) Fuel consumed in the Utility's own plants and the Utility's share of fuel consu...

AI summary The document defines the methodology for calculating the 'F' component of the rate, which represents the fuel cost per kilowatt-hour included in the base rate. It specifies the components of total projected system fuel costs (E), including fuel consumed in the Utility's own or jointly owned plants. The definition distinguishes between fossil fuel costs, which must include specific items from Account 151 and S02 emission allowances, and nuclear fuel costs, which are derived from Account 518 with specific exclusions for rental payments and double-counting.

PLUS
PLUS (B) Fuel costs related to purchased power and applicable S02 emission allowances such as those incurred In unit power and limited term power purchases where the fossil fuel costs and applicable S02 emission allowances associated with...

AI summary The text defines the scope of 'PLUS' (Purchased Power and Limited-term power) fuel costs. It specifies that these costs include fuel and S02 emission allowances for power where such costs are identifiable and clearly stated on billing statements. Additionally, it defines 'firm generation capacity purchases' as costs incurred to address capacity deficiencies or maintain reserve levels, explicitly excluding specific reservation and option charges while including total delivered costs.

PLUS
PLUS (C) Fuel costs related to purchased power and applicable S02 emission allowances such as short term, economy and other where the energy is purchased on an economic dispatch basis, including the total delivered cost of economy purchase...

AI summary The text defines 'PLUS' (Purchased Power and Limited-term power) in the context of fuel cost calculations. It specifies that PLUS includes fuel costs for purchased power and applicable S02 emission allowances (short-term, economy, etc.) when energy is purchased on an economic dispatch basis. This includes the total delivered cost of economy purchases intended to displace higher-cost generation at a cost lower than the utility's avoided variable costs. Conversely, energy receipts without monetary payments, such as diversity energy and storage energy payback, are excluded from this definition.

MINUS
MINUS (D) The cost of fossil fuel and applicable S02 emission allowances recovered through Intersystem sales including the fuel costs and applicable S02 emission allowances related to economy energy sales and other energy sold on an econom...

AI summary The text defines the components of the 'MINUS' calculation for the Energy Cost Recovery Rider (Rider ECR) for Southwestern Electric Power Company. It specifies that the calculation accounts for the cost of fossil fuels and S02 emission allowances recovered through intersystem sales, specifically excluding non-billing transactions like diversity energy and storage payback. It also establishes variables for projected system kilowatt-hour sales and jurisdictional fuel revenue differences, while noting that S.C. Code Ann. Sec. 58-27-865 governs the calculation.

RECOVERY OF ENERGY COST
RECOVERY OF ENERGY COST Energy Cost Recovery Rider ("Rider ECR ") defines the procedure by which the "Energy Cost Rate" of Southwestern Electric Power Company ("SWEPCO" or "Company") shall be initially established and periodically redeterm...

AI summary The text introduces the Energy Cost Recovery Rider (Rider ECR), which establishes the procedure for determining and periodically redetermining the 'Energy Cost Rate' for Southwestern Electric Power Company (SWEPCO). The primary purpose of this rate is to recover the Company's net fuel and purchased energy costs as defined within the specific provisions of the Rider ECR.

ENERGY COST RATE
ENERGY COST RATE The Energy Cost Rate to be initially effective under this Rider ECR shall be determined in the manner prescribed by the Arkansas Public Service Commission ("APSC" or "Commission") in its final order in Docket No. 98-339-U...

AI summary The text outlines the methodology for determining and applying the Energy Cost Rate under the Energy Cost Recovery Rider (ECR). The rate is initially established based on the Arkansas Public Service Commission's final order in Docket No. 98-339-U and is subject to annual redetermination. The rate applies to monthly billing energy (kWh) for all customers, with estimated usage applied to unmetered service. Calculations are precise to the nearest $0.000001 and rounded to the nearest cent for billing.

ANNUAL REDETERMINATION
ANNUAL REDETERMINATION On or before March 15 of each year beginning in 2000, the Company shall file a redetermined Energy Cost Rate with the Commission. The redetermined Energy Cost Rate shall be determined by application of the Energy Cos...

AI summary The document outlines the annual redetermination process for the Energy Cost Recovery Rider (Rider ECR) for the Southwestern Electric Power Company. The Company is required to file a redetermined Energy Cost Rate by March 15 annually, calculated using a specific formula and supported by detailed workpapers. The rate must account for projected energy costs for the upcoming 12-month period and include a true-up adjustment for any over-recovery or under-recovery from the preceding calendar year.

ADJUSTMENTS
ADJUSTMENTS If prior to the annual redetermination of the Energy Cost Rate, Staff or the Company becomes aware of an event that is reasonably expected to occur and/or has occurred which will materially impact the Company's Energy Cost, eit...

AI summary The text outlines the procedures for adjusting the Energy Cost Rate Formula within the Energy Cost Recovery Rider (ECR). It specifies that if an event occurs that materially impacts the Company's Energy Cost prior to the annual redetermination, either the Staff or the Company may propose an adjustment. Additionally, it establishes a threshold for interim revisions, allowing for proposals if the cumulative over-recovery or under-recovery balance exceeds ten percent (10%) of the Historical Energy Cost Period.

PAYMENT FOR SERVICE
PAYMENT FOR SERVICE AT CT Payment for Service Rider- See Rate Schedule 44. AT Original: Sheet No: R-27.3 Sheet 3 of 14 Replacing: Sheet No: Name of Company: SOUTHWESTERN ELECTRJC POWER COMPANY Kind of Service: Electric Class of Service: Al...

AI summary This document segment identifies the 'Payment for Service Rider' as a component of Rate Schedule 44 for the Southwestern Electric Power Company. It specifically references Rate Schedule No. 27, titled 'ENERGY COST RECOVERY RIDER (RJDER ECR),' which pertains to the recovery of energy costs for all classes of electric service.

ENERGY COST RATE FORMULA
ENERGY COST RATE FORMULA ECR ENERGYCOSTRATE ECR = \frac{TUA + (PEC \ JAF)}{PES} \ LCF + (M \ LCF) WHERE, TUA = \sum_{j=1}^{12} ((EC_j \ JAF) - (RR_j - PTU_j)) \ \left(1 + CCR \ \frac{21 - j}{12}\right) Where, E0 = ENERGY COST FOR MONTH) OF...

AI summary The document defines the mathematical formula for the Energy Cost Recovery Rider (ECR) for the Southwestern Electric Power Company. It details the components of the ECR calculation, including the Total Unit Average (TUA), Projected Energy Costs (PEC), and Junior Adjustment Factors (JAF), as well as the historical energy cost components (Fe, Pe, MST, and DHMV). The formula is intended to determine the rider rate based on fuel costs and system costs for all electric classes of service.

ATTACHMENT A (continued) Where
ATTACHMENT A (continued) Where Fe1 FUEL EXPENSE CHARGED TO ACCOUNT 501 LESS ACCOUNT 501 COSTS THAT FIT THE DEFINITION OF FERC ACCOUNT 152, LESS FUEL COST ASSOCIATED WITH SALES TRANSACTIONS IN MONTH j OF THE HISTORICAL ENERGY COST PERIOD Pe...

AI summary This document excerpt provides the mathematical formulas and definitions for components of the Energy Cost Recovery Rider (Rider ECR) for the Southwestern Electric Power Company. It specifies how fuel expenses, purchased energy expenses, and sales margins from affiliated and non-affiliated companies are calculated relative to historical energy cost periods. It also includes a specific adjustment for the Dolet Hills Mining Venture (DHMV) savings based on accumulated deferred fuel.

ATTACHMENT A (continued)
ATTACHMENT A (continued) If DHMV SAVINGfi.i > DHLC ACCUMULATED DEFERRED FUELj AND lf0.5 • DHMV SAVINGfi.i S UNAMORTIZED LITIGATION COS1j THEN DHMV;· = DHLC ACCUMULATED DEFERRED FUELj + 0.5• (DHMV SAVINGfi.i- DHLC ACCUMULATED DEFERRED FUEL)...

AI summary The document provides specific mathematical formulas and logic for calculating the Distribution Heat and Maintenance Value (DHMV) for the Southwestern Electric Power Company. It details the conditions under which DHMV is calculated based on savings, accumulated deferred fuel, and unamortized litigation costs. It also defines the DHMV Benchmark based on the total mmBTU delivered by the Dolet Hills Lignite Company during the Historical Energy Cost Period.

PRE-MERGER
PRE-MERGER Company Base Off-System Sales margin in The Test Year Threshold Level for 15% Sharing by Shareholders in Off-System Sales Threshold Level for 50% Sharing by Shareholders in Off-System Sales SWEPCO $583,539 $758,600 $1,167,078 (b...

AI summary The document outlines the post-merger financial arrangements for off-system sales margins in Southwestern Electric Power Company's (SWEPCO) Arkansas retail jurisdiction. It establishes a base off-system sales margin of $758,600 to be included in the Energy Cost Recovery Rider and credited to customers annually. It further specifies a tiered sharing structure: for margins between $758,600 and $1,167,078, 85% is credited to customers and 15% to stockholders; for margins exceeding $1,167,078, the split is 50% to customers and 50% to stockholders.

ATTACHMENT A (continued)
ATTACHMENT A (continued) (7) Costs associated with the lignite supply to the Do let Hills Power Plant will be treated in the following manner:

AI summary The document provides a specific instruction regarding the treatment of costs associated with the lignite supply to the Dolet Hills Power Plant. This section serves as a placeholder for the methodology used to account for these specific fuel costs within the broader regulatory framework.

Treatment ofthe Dolet Hills Mining Venture Adjustment
Treatment ofthe Dolet Hills Mining Venture Adjustment In consideration of expected fuel cost savings resulting from the replacement of the former mine operator, SWEPCO will be allowed to recover the costs associated with the Do let Hills L...

AI summary The document outlines the regulatory treatment for the Dolet Hills Mining Venture (DHMV) adjustment for Southwestern Electric Power Company (SWEPCO). To protect ratepayers from high fuel costs associated with the Dolet Hills Lignite Company (DHLC), SWEPCO is permitted to recover costs only up to a calculated DHMV Benchmark. This benchmark is based on specific contractual quantities and prices, adjusted annually by the GDP Implicit Price Deflator. Costs exceeding this benchmark are designated as a negative DHMV Adjustment and must be deferred for ratemaking purposes.

FUEL ADJUSTMENT RIDER- LOUISIANA
FUEL ADJUSTMENT RIDER- LOUISIANA All kilowatt-hours sold will be adjusted to reflect the current cost offuel. For electric service billed under applicable rate schedules for which there is no metering, the monthly usage shall be estimated...

AI summary The document outlines the methodology for calculating the Fuel Adjustment Factor (F AF) for electric service in Louisiana. It specifies that all kilowatt-hours sold will be adjusted based on current fuel costs. For unmetered services, the Company will estimate monthly usage to apply the factor. The calculation formula incorporates variables such as the Fuel cost per kilowatt-hour (F), Junior Adjustment Factor (JAF), Implicit Price Deflator (I), Load Factor (LF), S02 emission allowances (S), Annual Load Factor (ALF), Maintenance and System Taxes (M), and other specific cost components.

Definitions
Definitions F = Fuel Cost: Fuel costs incurred by the Company for the second preceding month for retail jurisdictional sales. The cost of fossil fuel shall include only those items includible in FERC Account 151 , less excludable costs def...

AI summary This document provides technical definitions for various components used to calculate fuel costs and service riders within the Louisiana Service Territory. It defines 'Fuel Cost' (F) based on FERC accounts, including costs for consumed fuel, purchased energy, and revenues from sales. It also establishes formulas for the Jurisdictional Allocation Factor (JAF), Loss Factor (LF), Average Loss Factor (ALF), Interest (I), and a specific Surcharge formula used to account for variances in fuel recovery.

Definitions:
Definitions: A = Cumulative Over/Under Recovery (Third Preceding Month) B =Fuel Cost/kWH Delivered \left[ \left( \frac{(F \ JAF) + I}{K} \right) \ LF \right] - \left( (S / ALF) \ LF \right) (Second Preceding Month) - C = LA retail jurisdic...

AI summary This document excerpt provides a list of mathematical definitions and variables used in a regulatory tariff manual for the Public Utility Commission of Texas. It defines components for calculating fuel costs, recovery factors, and specific costs associated with the South Hallsville Mine reclamation for the Southwestern Electric Power Company (SWEPCO). The formulas involve variables for fuel costs, load factors, emission allowances, and kilowatt-hour sales.

FIXED FUEL FACTOR
FIXED FUEL FACTOR Electric service billed under applicable rate tariffs shall be subject to this Fixed Fuel Factor in accordance with the Substantive Rules of the Public Utility Commission of Texas Section 25.237. T I T The Fixed Fuel Fact...

AI summary The document outlines the application of a 'Fixed Fuel Factor' to electric service billed under applicable rate tariffs. It specifies that this factor is governed by the Substantive Rules of the Public Utility Commission of Texas Section 25.237. The factor is calculated by multiplying the factor by the kilowatt-hour (kWh) sales read, estimated, or determined during a billing month under a specific metering voltage provision.

The Fixed Fuel Factors are:
The Fixed Fuel Factors are: Service Voltage February- July Aug January Transmission- 138 kV $.034499 $.023743 Transmission- 69 kV $.034835 $.023975 Primary Substation \ $.035007 $.024093 Primary $.035308 $.024300 Secondary $.036301 $.02498...

AI summary The document provides a table of Fixed Fuel Factors for various service voltages in Nova Scotia. It specifies the fuel cost per kilowatt-hour for Transmission (138 kV and 69 kV), Primary Substation, Primary, and Secondary services, categorized by two seasonal periods: February-July and August-January.

Southwestern PUBLIC SERVICE Company
Southwestern PUBLIC SERVICE Company COMMISSION SCHEDULE SHEET RATE SCHEDULE NUMBER PUCT 11/-69 FUELCOSTRECOVERYFACTOR TARIFF NUMBER 7100.20 CANCELLIN 7100.19 Page 1 of2

AI summary The provided text is a header and table excerpt from a regulatory proceeding involving the Southwestern Public Service Company. It identifies the relevant commission (PUCT), specific schedule numbers (11/-69), and a rate schedule number (7100.20) associated with the 'FUELCOSTRECOVERYFACTOR'. It also notes the cancellation of tariff number 7100.19. The document serves as a structural reference for fuel cost recovery components within the utility's tariff structure.

FUEL COST RECOVERY FACTOR
FUEL COST RECOVERY FACTOR Application of fuel cost recovery factors are as follows:

AI summary The document provides a section heading regarding the Fuel Cost Recovery Factor, indicating that the subsequent text will detail the specific application of factors used to recover fuel costs. While the provided snippet is a heading and lacks specific data points, it establishes the context for how fuel costs are integrated into the rate structure.

SECONDARY DISTRIBUTION FUEL COST RECOVERY FACTOR:
SECONDARY DISTRIBUTION FUEL COST RECOVERY FACTOR: The Secondary Distribution fuel cost recovery factor to be billed is 2.2887¢ per kilowatt hour and shall apply when service is metered at less than approximately 12 kV.

AI summary The text specifies the Secondary Distribution fuel cost recovery factor, which is set at 2.2887¢ per kilowatt hour. This rate is applicable for electrical services metered at voltages below approximately 12 kV.

PRIMARY DISTRIBUTION FUEL COST RECOVERY FACTOR:
PRIMARY DISTRIBUTION FUEL COST RECOVERY FACTOR: The Primary Distribution fuel cost recovery factor to be billed is 2.2574¢ per kilowatt hour and shall apply when service is metered at greater than or equal to approximately 12 kV and less t...

AI summary The document specifies the Primary Distribution fuel cost recovery factor, establishing a rate of 2.2574¢ per kilowatt hour. This factor is applicable to electricity services metered at voltages ranging from approximately 12 kV to less than 69 kV.

SUB-TRANSMISSION FUEL COST RECOVERY FACTOR:
SUB-TRANSMISSION FUEL COST RECOVERY FACTOR: The Sub-transmission fuel cost recovery factor to be billed is 2.1608¢ per kilowatt hour and shall apply when service is metered at approximately 69 kV and less than approximately 115 kV or loss...

AI summary The document specifies the Sub-transmission fuel cost recovery factor to be billed at a rate of 2.1608¢ per kilowatt hour. This rate is applicable to services metered at approximately 69 kV and less than approximately 115 kV, as well as instances where loss compensated meters are utilized to include losses to the sub-transmission system.

BACKBONE-TRANSMISSION FUEL COST RECOVERY FACTOR:
BACKBONE-TRANSMISSION FUEL COST RECOVERY FACTOR: The Backbone transmission fuel cost recovery factor to be billed is 2.1485¢ per kilowatt hour and shall apply when service is metered at greater than or equal to approximately 115 kV or loss...

AI summary The document specifies the Backbone transmission fuel cost recovery factor, which is set at 2.1485¢ per kilowatt hour. This rate is applicable to services metered at approximately 115 kV or greater, as well as loss-compensated meters that include losses to the backbone transmission. The rate is scheduled to take effect starting with the November 2003 billing cycle.

FUEL CHARGE RIDER-B
FUEL CHARGE RIDER-B The charge for service under Virginia Electric and Power Company's Filed Rate Schedules 1, IP, IS, IT, IW, 5, 5C, 5P, 6, GS-I, GS-2, GS-2T, GS-3, GS-4, 6TS, 7, 8, IO, 25, 27, 28 and 29, as well as applicable energy char...

AI summary The document outlines a rate increase of 0.135 cents per kilowatt-hour for various service schedules of the Virginia Electric and Power Company. This increase is specifically designated as 'Fuel Charge Rider-B,' which is intended to recover the Virginia fuel deferral balance as of December 31, 2003, in accordance with a previous settlement. The rider is supplementary to Fuel Charge Rider-A and is scheduled to remain in effect until the balance is recovered or until June 30, 2007.

STATE CORPORATION COMMISSION
STATE CORPORATION COMMISSION AT RICHMOND, JANUARY 18,2006 I iGJ~ J~.J ,... ~,:::J '•·. 21 4 APPLICATION OF APPALACHIAN POWER COMPANY CASE NO. PUE-2005-00090 To revise its fuel factor pursuant to § 56-249.6 of the Code ofVirginia

AI summary This document marks the beginning of a regulatory proceeding before the State Corporation Commission in Richmond, Virginia. The proceeding involves an application by Appalachian Power Company to revise its fuel factor in accordance with § 56-249.6 of the Code of Virginia. The case, identified as PUE-2005-00090, focuses on the adjustment of fuel costs associated with the utility's operations.

ORDER ESTABLISHING FUEL FACTOR
ORDER ESTABLISHING FUEL FACTOR On October 21, 2005, Appalachian Power Company ("Appalachian" or the "Company") filed with the State Corporation Commission ("Commission") an application along with testimony, exhibitS, and a proposed tariff...

AI summary Appalachian Power Company filed an application with the State Corporation Commission to increase its fuel factor from 1.420 to 1.785 per kWh, effective January 1, 2006. The company argues this adjustment is necessary to recover appropriate fuel expenses for the 2006 calendar year. The Commission established a procedural schedule, allowing for interim implementation of the factor while investigating the application. Several parties, including the Division of Consumer Counsel and the Old Dominion Committee, filed notices of participation.

BEFORE THE NORTH CAROLINA UTILITIES COMMISSION
BEFORE THE NORTH CAROLINA UTILITIES COMMISSION In the Matter of Application by Carolina Power & Light Company, ) ORDER APPROVING d/b/a Progress Energy Carolinas, Inc. for Authority to ) FUEL CHARGE Adjust Its Electric Rates Pursuant to G.S...

AI summary This document represents the formal heading of a regulatory proceeding before the North Carolina Utilities Commission. It identifies the application filed by Carolina Power & Light Company (operating as Progress Energy Carolinas, Inc.) seeking authority to adjust its electric rates. The proceeding is governed by G.S. 62-133.2 and NCUC Rule RS-55, specifically concerning the approval of a fuel charge adjustment.

For the Attorney General:
For the Attorney General: Len G. Green, Assistant Attorney General, North Carolina Department of Justice, Post Office Box 629, Raleigh, North Carolina 27602-0629 Public Staff witness Edwards testified that he generally agreed with PEC, pro...

AI summary The Commission reviewed whether transaction-related hedging costs incurred by PEC to stabilize natural gas costs should be recoverable as fuel costs. While CIGFUR II argued that these costs fall outside the scope of G.S. 62-133.2, the Commission agreed with Public Staff and PEC. The Commission concluded that direct, transaction-related costs arising from prudent efforts to mitigate natural gas price volatility should be recoverable as fuel costs, provided they meet the standards of reasonableness and prudence.

IT IS, THEREFORE, ORDERED as follows:
IT IS, THEREFORE, ORDERED as follows: 1. That, effective for service rendered on and after October 1, 2006, PEC shall adjust the base fuel component in its North Carolina retail rates by an increment of 0.784 ¢/kWh (0.81 0 ¢/kWh including...

AI summary The Board orders an adjustment to the base fuel component of the retail rates for PEC, effective October 1, 2006. The base fuel component will increase by an increment of 0.784 ¢/kWh (or 0.81 ¢/kWh including gross receipts tax) over the amount previously approved in Docket No. E-2, Sub 537. The order specifies that this increment is to remain in effect until a further order is issued.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 1 (Large File - 22 MB) 22 passages
MONTHLY RATE (Cont'd)
MONTHLY RATE (Cont'd) Schedule Code Generation OATT Transmission Retail Transmission Distribution Total 310 Transmission Voltage: Customer Charge ($) 575.00 575.00 Demand Charge ($/KW) 7.07 1.55 0.04 0.00 8.66 Off-Peak Excess Demand Charge...

AI summary The document provides a detailed breakdown of the monthly rate components for various utility services, including generation, transmission, and distribution. It specifies customer charges, demand charges (including off-peak excess demand), and energy charges per kilowatt-hour. Additionally, it defines specific charges for distribution reactive demand exceeding 50% of metered demand and establishes the Generation Levelized Fuel Factor at 1.785¢ per KWH.

\ Subject to:
\ Subject to: Standard Contract Rider No. 60-Fuel Cost Adjustment Standard Contract Rider No. 62—Qualified Pollution Control Property Revenue Adjustment Standard Contract Rider No. 63—SO 2 and NO x Emission Allowance Adjustment Standard Co...

AI summary The document lists several Standard Contract Riders that modify the terms of utility contracts. These riders address various cost adjustments and credits, including fuel costs, pollution control property revenue, emission allowances, merger savings, demand side management, purchased power costs for peak load, Midwest ISO management costs, summer reliability, and clean coal operating costs. These adjustments are effective as of November 1, 2006.

Issued: November 1, 2006
Issued: November 1, 2006 Fuel Cost Rider 60 in Rates Fuel Adjust. Jan '06 Apr '06 Jui'06 Oct '06 ./ $ 0.014484 $ 0.000232 0 014484 ,~-<~?~f-=t. £.~ 0.014484 0.001052 J 0.007713/ 0.014484 Average 0.002307/ ._l_u_Rc_14_-_o_u_K_E_E_N_ER_G_Y_I...

AI summary This document provides a quarterly rider update for Keen Energy Services for the first and second quarters of 2006. It lists specific monetary adjustments for various riders, including Fuel Rider 60, Qualified Pollution-Rider 62, Emission Allowance Riders, DSM On-Going Expenses, Midwest ISO Management Cost and Revenue Adjustment, Summer Reliability Adjustment, and Clean Coal Operating Cost. The data is broken down by specific customer classes (RS, cs, LLF, HLF, TS) and specifies effective dates for the adjustments.

- (2) Effective April 2006, Will be applied to Customers Billing starting with June 2006 bills.
- (2) Effective April 2006, Will be applied to Customers Billing starting with June 2006 bills. JUL -SEPT 2006 QUARTER 3 RS cs LLF HLF TS Fuel Rider 60 $0.010520 $0.010520 $0.010520 $0.010520 $0.010520 Qualified Pollution-Rider 62 $0.00148...

AI summary The document provides a detailed schedule of various rate riders and adjustments applicable to customer billing starting in June 2006. It specifies rates for different service types, including Residential Service (RS), Commercial Service (CS), Large Load Fuel (LLF), High Load Fuel (HLF), and Transmission Service (TS). The riders include fuel costs, pollution-related charges, emission allowances, merger savings credits, demand-side management (DSM) expenses, and various reliability and operating cost adjustments.

- (2) Efffectlve First Billing Cycle of September 2006
- (2) Efffectlve First Billing Cycle of September 2006 OCT - DEC 2006 QUARTER 4 RS cs LLF HLF TS Fuel Rider 60 $0.007713 $0.007713 $0.007713 $0.007713 $0.007713 Qualified Pollution-Rider 62 $0.001480 $0.001560 $0.001516 0.652214111 $0.0011...

AI summary The document presents a table of various rate riders and their associated costs for the October - December 2006 quarter. It specifies the specific dollar amounts for components including the Fuel Rider, Qualified Pollution-Rider, Emission Allow. Rider, Merger Savings Credit, Demand-Side Management (DSM) On-Going Expenses, Midwest ISO Management Cost and Revenue Adjustment, Summer Reliability Adjustment, and Clean Coal Operating Cost across different service types (RS, CS, LLF, HLF, TS). It also notes that the Rate HLF factor is billed on non-coincident demand.

STANDARD CONTRACT RIDER NO. 60 FUEL COST ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES
STANDARD CONTRACT RIDER NO. 60 FUEL COST ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES A. The applicable charges for electric service to the Company's retail customers shall be increased or decreased, to the nearest 0.001 mill ($0.000...

AI summary The document defines Standard Contract Rider No. 60, which establishes the mechanism for the Fuel Cost Adjustment applicable to all retail rate schedules. It specifies that electric service charges for the Company's retail customers will be adjusted (increased or decreased) to the nearest 0.001 mill per KWH. The adjustment is designed to recover or credit fuel costs based on a specific formula involving the ratio of fuel costs to sales (F/S) minus a constant of $0.014484.

where:
where: - 1. "F" is the estimated expense of fuel based on a three-month average cost beginning with the first month of the billing cycle and consisting of the following costs: - (a) the average cost of fossil fuel consumed due to the opera...

AI summary The text defines the methodology for calculating the fuel cost adjustment factor, specifically identifying the components of fuel expense (F) and estimated kilowatt-hour sales (S). It outlines the inclusion of fossil and nuclear fuel costs for native load customers, net energy costs for economic dispatch, and adjustments for utility receipts taxes. Additionally, it specifies a fixed fuel cost adjustment rate of $0.007713 per kilowatt-hour effective October 2006 and provisions for recovering costs for power purchases exceeding monthly benchmarks.

STANDARD CONTRACT RIDER NO. 63 S02AND NOx EMISSION ALLOWANCE ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES
STANDARD CONTRACT RIDER NO. 63 S02AND NOx EMISSION ALLOWANCE ADJUSTMENT APPLICABLE TO ALL RETAIL RATE SCHEDULES A. The applicable charges for electric service to the Company's retail customers shall be increased or decreased, to the neares...

AI summary The text describes a specific contractual rider (No. 63 S02) designed to adjust retail electric service charges based on the costs of Sulfur Dioxide (SO2) and Nitrogen Oxides (NOx) emission allowances. The adjustment is calculated to the nearest 0.001 mill per kWh using a specific mathematical formula. This mechanism ensures that the Company can recover or credit the costs associated with these environmental emission allowances across all retail rate schedules.

where:
where: - 1. " S02" and "NOx'" emission allowances costs shall be defined as the estimated expense of S02 and NO. emission allowances applicable to native load customers based on estimated average costs over the three month period beginning...

AI summary The text defines the methodology for calculating SO2 and NOx emission allowance costs for native load customers. It specifies that costs are based on three-month average estimates, including costs from the Company's own generating units (per FERCUSOFA standards), costs from purchased energy for economy and reliability, and net gains or losses from allowance trading. The formula includes adjustments for utility receipts taxes and a reconciliation mechanism to align estimated costs with actual costs incurred.

Standard Contract Rider No. 67 Recovery of Preapproved Purchased Power Costs to Meet Retail Customer Peak Load Requirements (Purchased Power Tracker)
Standard Contract Rider No. 67 Recovery of Preapproved Purchased Power Costs to Meet Retail Customer Peak Load Requirements (Purchased Power Tracker) On April 17, 2004, the Commission approved the recovery of certain jurisdictional purchas...

AI summary The document outlines Standard Contract Rider No. 67, which establishes a mechanism for the recovery of preapproved purchased power costs. These costs are specifically associated with meeting the peak load requirements of retail customers within the IURC jurisdiction. The rider ensures that these charges are recovered separately from the fuel adjustment charge. It specifies that retail electric service rates will be increased based on a formula involving a Purchased Power Factor to account for the estimated costs of purchased power.

STANDARD CONTRACT RIDER NO. 71 CLEAN COAL OPERATING COST REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS
STANDARD CONTRACT RIDER NO. 71 CLEAN COAL OPERATING COST REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS The applicable charges for electric service to the Company's retail customers, shall be increased or decreased to the nearest 0.00...

AI summary Standard Contract Rider No. 71 establishes a mechanism for adjusting retail electric service charges to recover clean coal operating costs, specifically depreciation and operation and maintenance expenses. The adjustment is to be updated and reconciled by the Company at least every six months. The rider specifies that charges shall be adjusted to the nearest 0.001 mill per kWh, with the specific revenue adjustment factor determined by a formula based on various cost and rate group components.

STANDARD CONTRACT RIDER NO. 71 CLEAN COAL OPERATING COST REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS .
STANDARD CONTRACT RIDER NO. 71 CLEAN COAL OPERATING COST REVENUE ADJUSTMENT APPLICABLE TO RETAIL RATE GROUPS . Clean Coal Clean Coal Operating Cost Operating Cost Revenue Adjustment Line Revenue Adjustment Factor Per Line No. Retail Rate G...

AI summary The document outlines Standard Contract Rider No. 71, which establishes the Clean Coal Operating Cost Revenue Adjustment for various retail rate groups. It provides specific revenue adjustment factors per kilowatt-hour (KWH) and non-coincident kilowatts (KW) for different customer categories, including Residential Service (RS), Commercial Service (CS), and various industrial and transmission service rates. The rider became effective on November 1, 2006.

APPROVED FUEL CHARGE ADJUSTMENTS
APPROVED FUEL CHARGE ADJUSTMENTS The Company's approved fuel charge adjustments, if any; pursuant to North Carolina General Statute 62-133.2, will apply to all service supplied under this Schedule. The currently approved adjustments are in...

AI summary The document confirms that the Company's approved fuel charge adjustments, in accordance with North Carolina General Statute 62-133.2, are applicable to all services provided under the specified Schedule. It further notes that the currently approved adjustments are already incorporated into the Rate provided in the filing.

AVAILABILITY (North Carolina Only)
AVAILABILITY (North Carolina Only) Service supplied under the Company's rate schedules are subject to approved fuel charge adjustments, if any, over or under the Rate set forth in the approved rate schedules. Adjustments are made pursuant...

AI summary The text specifies that services provided under the Company's rate schedules are subject to approved fuel charge adjustments. These adjustments may result in costs above or below the established rates and are governed by North Carolina General Statute 62-133.2, as ordered by the North Carolina Utilities Commission.

APPROVED FUEL CHARGE ADJUSTMENTS
APPROVED FUEL CHARGE ADJUSTMENTS The Commission has ordered effective for service rendered on and after July 1, 2006 that such an adjustment shall be included in the Company's rate schedules and an appropriate fuel cost adjustment rider be...

AI summary The Commission has approved an increase in the Approved Fuel Cost, effective July 1, 2006, raising it from the 1.1032 ¢/kWh rate established in 1991 to 1.6770 ¢/kWh. The Commission ordered the Company to include this adjustment in its rate schedules and to file a corresponding fuel cost adjustment rider to implement the changes to the fuel component.

APPROVED FUEL COST
APPROVED FUEL COST The Approved Fuel Cost of 1.6770 ¢ / kWh will remain in effect until a new cost of fuel is established by the Commission.

AI summary The Commission has established that the Approved Fuel Cost of 1.6770 ¢/kWh will remain unchanged until a new cost of fuel is determined by the Commission.

The following shows the calculation of the Approved Fuel Charge Adjustments:
The following shows the calculation of the Approved Fuel Charge Adjustments: Fuel Cost Effective Fuel Cost Effective July 1, 2005, E-7, Sub 780 July 1, 2006, E-7, Sub 805 Base Fuel Cost Effective November 12, 1991 Docket No. E-7, Sub 487 1...

AI summary The document provides a detailed breakdown of the calculation for Approved Fuel Charge Adjustments for two specific periods: July 1, 2005 (E-7, Sub 780) and July 1, 2006 (E-7, Sub 805). It outlines the components of the net fuel factor, including base fuel costs, adjustments, Experience Modification Factors (EMF), and the impact of the Deferred Tax Decrement Rider. The calculation concludes by showing the final change in rates resulting from these adjustments.

Preamble
As a result of the Commission June 27, 2006 Order in Docket No. E-7, Sub 805, the Approved Fuel Cost, Experience Modification Factor and Deferred Tax Decrement Rider are included in the current rate schedules effective for service on and a...

AI summary The text notes that the Commission's June 27, 2006 Order in Docket No. E-7, Sub 805 resulted in the inclusion of the Approved Fuel Cost, Experience Modification Factor, and Deferred Tax Decrement Rider in the rate schedules effective July 1, 2006. This order, which accounts for the Company's gross receipts tax expense, led to a rate increase of 0.4027 ¢/kWh across all rate schedules compared to the previous period.

APPLICABILITY
APPLICABILITY This adjustment is applicable to and is a part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of Fuel in an amount to the nearest one ten-thousandth...

AI summary The text defines the applicability of a fuel cost adjustment within the Utility's South Carolina retail electric rate schedules. It specifies that the Public Service Commission will include fuel costs in the base rates, calculated to the nearest one ten-thousandth of a cent using a specific formula (F=E/S + G/S1), provided the Commission deems the costs reasonable and proper.

Where:
Where: F = Fuel cost per kilowatt-hour included in base rate, rounded to the nearest one ten-thousandth of a cent. E = Total Projected system Fuel costs: (A) Fuel consumed in the Utility's own plants and the Utility's share of fuel consume...

AI summary The text defines the components used to calculate the fuel cost per kilowatt-hour included in the base rate. It specifies that total projected system fuel costs consist of three components: (A) fuel consumed in the Utility's own or jointly owned plants, including fossil fuel costs and emission allowances; (B) fuel costs for purchased power like unit and limited-term purchases, including 'firm generation capacity purchases' to address capacity deficiencies; and (C) fuel costs for purchased power on an economic dispatch basis, including transmission charges and economy purchases.

Minus
Minus - (D) The cost of fuel and applicable S02emission allowances recovered through intersystem sales including the fuel costs and applicable S02 emission allowances related to economy energy sales and other energy sold on an economic dis...

AI summary The text outlines the methodology for calculating fuel costs (F) and associated SO2 emission allowances for intersystem energy sales. It specifies that fuel costs are recovered for economy energy and other energy sold on an economic dispatch basis, while excluding non-billing transactions like diversity energy or storage energy payback. The calculation incorporates projected system kilowatt-hour sales, cumulative differences between jurisdictional fuel revenues and expenses, and the appropriate revenue-related tax factor.

APPLICABILITY
APPLICABILITY This adjustment is applicable to and is a part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of Fuel in an amount to the nearest one ten-thousandth...

AI summary The text outlines the applicability of a fuel cost adjustment formula to the Utility's South Carolina retail electric rate schedules. It specifies that the Public Service Commission will include fuel costs in base rates, rounded to the nearest one ten-thousandth of a cent, based on a formula that calculates fuel costs as the sum of energy and generation costs divided by system capacity (F = E/S + G/S).

N-40RIRs Attachment SEB-NSPI - 2a, pt. 4 (Large File - 19 MB) 11 passages
TEMPORARY SURCHARGE
TEMPORARY SURCHARGE For Bills rendered on and after April 21, 2006, there shall be a Temporary Surcharge as set forth below consistent with a Commission Order in Case No. 87-0669-E-C dated April 13, 2006. This Surcharge is subject to recon...

AI summary The document establishes a Temporary Surcharge for bills rendered on or after April 21, 2006, as mandated by Commission Order Case No. 87-0669-E-C. This surcharge is subject to reconciliation and is intended to remain in effect until a new ENEC proceeding or equivalent fuel recovery mechanism is established. The surcharge is included in the minimum charge of the Rate Schedule and is applied to customer bills prior to the calculation of tax surcharges.

I. Cost of Fuel Rider No. 59Z
I. Cost of Fuel Rider No. 59Z Pursuant to North Carolina General Statute 62-133.2 and Docket No. E-2, Sub 889, the Monthly Rate includes an increment of 0.810 cents per kilowatt-hour, effective for service rendered on and after October 1,...

AI summary The document specifies a rate increment under the Cost of Fuel Rider No. 59Z. This rider adds 0.810 cents per kilowatt-hour to the Monthly Rate, effective for service rendered on or after October 1, 2006, in accordance with North Carolina General Statute 62-133.2 and Docket No. E-2, Sub 889.

FUEL ADTIJSTMENT
FUEL ADTIJSTMENT Fuel costs of $.02500 per kWh are included in the kWh charges and are subject to adjustment by order of the Public Service Commission of South Carolina.

AI summary The document specifies that fuel costs of $0.02500 per kWh are incorporated into the kilowatt-hour (kWh) charges. These charges are subject to periodic adjustments as ordered by the Public Service Commission of South Carolina.

Definitions and Basic Concepts (continued):
Definitions and Basic Concepts (continued): Adjusted Actual NPC: Adjusted Actual NPC is the annual sum of the monthly total Company amounts properly recorded in FERC Account Numbers: 501 (Steam Power Generation - Fuel), 503 (Steam Power Ge...

AI summary The text defines key components of the Price Comparison and Amortization Mechanism (PCAM), specifically the Adjusted Actual Net Power Costs (NPC) and the Deferred NPC Adjustment. Adjusted Actual NPC includes costs for coal, steam, natural gas, purchased power, and wheeling, excluding unpredictable events like hydro normalization or forced outages. The Deferred NPC Adjustment is a retail tariff charge calculated based on monthly differences between Adjusted Actual NPC and Base NPC, incorporating factors such as the Dead Band, Sharing Proportions, and Symmetrical Interest.

ADJUSTMENT FOR FUEL COSTS
ADJUSTMENT FOR FUEL COSTS Fuel cost of $.02516 per Kwhr. are included in the energy charge and are subject to adjustment by order of the Public Service Commission of South Carolina.

AI summary The document specifies that a fuel cost of $0.02516 per Kwhr is included in the energy charge. It further notes that this specific cost component is subject to adjustment by the Public Service Commission of South Carolina.

APPLICABILITY
APPLICABILITY This adjustment is applicable to and is part of the Utility's South Carolina retail electric rate schedules. The Public Service Commission has determined that the costs of fuel in an amount to the nearest one-thousandth of a...

AI summary The text specifies the applicability of a fuel cost adjustment for the Utility's South Carolina retail electric rate schedules. It states that the Public Service Commission will include fuel costs in the base rates, calculated to the nearest one-thousandth of a cent using a specific formula (F = E_S + G_S1), provided the Commission deems the costs reasonable and proper.

Where:
Where: - F = Fuel cost per kilowatt hour included in base rate, rounded to the nearest one-thousandth of a cent. - E = Total projected system fuel costs: - (A) Fuel consumed in the Utility's own plants and the Utility's share of fuel consu...

AI summary The text defines the specific components and methodologies used to calculate fuel costs within the base rate. It establishes the definition for 'F' as the fuel cost per kilowatt-hour and 'E' as the total projected system fuel costs. The calculation for 'E' includes fuel consumed in the Utility's own or jointly owned/leased plants, specifying the inclusion of fossil fuel costs from Account 151 of the Uniform System of Accounts and S02 emission allowances, while detailing specific exclusions and inclusions for nuclear fuel.

PLUS
PLUS (B) Fuel costs related to purchased power and applicable S02 emission allowances such as those incurred in unit power and limited term power purchases where the fossil fuel costs and applicable S02 emission allowances associated with...

AI summary The text defines the scope of 'PLUS' costs, specifically focusing on fuel costs associated with purchased power and SO2 emission allowances. It specifies that these costs must be identifiable in billing statements for unit and limited-term power purchases. Additionally, it defines 'firm generation capacity purchases' as costs incurred to address capacity deficiencies or maintain reserve levels, explicitly excluding certain reservation and option charges.

MINUS
MINUS (D) The cost of fossil fuel and applicable S02 emission allowances recovered through intersystem sales including the fuel costs and applicable S02 emission allowances related to economy energy sales and other energy sold on an econom...

AI summary The text defines the 'MINUS' component of a fuel cost calculation for Southwestern Electric Power Company. It specifies that the cost of fossil fuels and SO2 emission allowances associated with intersystem sales, economy energy sales, and other energy sold on an economic dispatch basis are excluded from certain calculations. It clarifies that energy deliveries without billing transactions, such as diversity energy and storage energy payback, are not considered sales. The calculation also incorporates a revenue-related tax factor and notes that S.C. Code Ann. Sec. 58-27-865 takes precedence in case of conflict.

Adjustments:
Adjustments: Fuel Adjustment: In addition to all other charges, the amount of the Customer's bill will be adjusted by an amount per kilowatthour calculated according to the formula in the Energy Cost Recovery Rider - Arkansas. Tax Adjustme...

AI summary The document outlines two specific billing adjustments for customers. The Fuel Adjustment modifies the bill per kilowatt-hour based on the formula established in the Energy Cost Recovery Rider - Arkansas. Additionally, the Tax Adjustment increases the bill by the proportionate part of any new or increased tax rates as dictated by the Tax Adjustment Rider - Arkansas.

2006 Fuel Adjustment Factors- Arkansas
2006 Fuel Adjustment Factors- Arkansas Transmission - Transmission - Primary Billing Month 138kV 69kV Substation Primary Secondary January $0.032698 $0.033016 $0.033179 $0.033464 $0.034406 February $0.032698 $0.033016 $0.033179 $0.033464 $...

AI summary The document provides a detailed schedule of 2006 fuel adjustment factors for Arkansas. It specifies monthly rates for various transmission levels, including 138kV and 69kV lines, as well as Primary and Secondary Substation rates. The data shows consistent monthly values for each category throughout the calendar year, reflecting the cost adjustments applied to electricity billing for that period.

N-40RIRs Attachment SEB-NSPI - 2h 22 passages
Rate: LPS-TOD (eff. 10/2/06) Pursuant to Interim Order
Rate: LPS-TOD (eff. 10/2/06) Pursuant to Interim Order WIGHTHY KVV U j Load Factor 0% Monthly kWh 0 Total A CONTRACTOR AND AND AND AND AND AND AND AND AND AND Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 50 MV √ Firm n Line Des...

AI summary The document presents a rate structure for LPS-TOD, effective October 2, 2006, pursuant to an interim order. It details a specific billing schedule for a customer with a monthly load of 50,000 kW and 32,850,000 kWh. The rate components include a fixed customer charge, demand charges, off-peak excess demand charges, energy charges, a fuel factor, and a customer-owned meter credit, culminating in a total monthly cost of $1,163,498 and a mill rate of 35.42.

Voltage: Transmission Power Factor: 90% Assumes Substation Ownership
Voltage: Transmission Power Factor: 90% Assumes Substation Ownership ASSUME TIONS Firm Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 Interruptible Monthly kW 0 Load Factor 0% Monthly kWh 0 Total Monthly kW 50,000 Load Factor 90%...

AI summary The document provides a detailed cost calculation for a 50 MW firm load with a 90% load factor under the High Load Factor Service (HLF) rate structure. It breaks down monthly costs including customer charges, demand charges adjusted for power factor, energy charges, kVAr charges, and various riders such as fuel adjustments, pollution control, and emission allowances. Additionally, it includes a comparative table of fuel costs and fuel adjustment riders for Duke Energy Indiana (PSI Energy) and a reference to Duke Power Company.

Assumes Substation Ownership
Assumes Substation Ownership ASSUMPTIONS Firm MonthlykW 0 I Load Factor 100% Monthly kWh 0 lnterru~tible MonthlykW 50,000 Load Factor 90% Monthly kWh 32,850,000 Total MonthlykW 50,000 Load Factor 90% Monthly kWh 32,850,000 , Max Int. I Min...

AI summary The document outlines a rate structure for Duke Power Company in North Carolina, specifically for customers assuming substation ownership. It provides a detailed breakdown of costs for both Firm and Interruptible Power Services. The Firm Rate includes facilities charges, seasonal demand charges (Summer and Winter), and energy charges for On-Peak and Off-Peak usage, along with a fuel-in-rates adjustment. The Interruptible Power Service (Rider IS) features a lower facilities charge and a significant demand credit. Total costs are calculated including a 4.50% state sales tax.

Adjustment for fuel in rates
Adjustment for fuel in rates Change in Rates Eff. 9/04 Eff. 7/05 Eff. 7/06 Eff. 8/06 ¢/kWh Energy Rates: Jan 2006 0.3429 On-Pk 4.4132 4.5943 4.7788 4.4296 Apr2006 0.3429 Off-Pk 2.2778 2.4589 2.6434 2.2942 Jul 2006 0.5738 Difference: Oct 20...

AI summary The document presents a table detailing historical rate changes for Duke Power Company in South Carolina, specifically focusing on energy rates for On-Peak and Off-Peak periods between September 2004 and August 2006. It highlights a specific adjustment for fuel in rates, showing fluctuations in ¢/kWh and calculating the differences between various effective dates. The data tracks the progression of electricity costs, ending with a calculated difference of -0.001155 $/kWh for the period.

Rate OPT Effective: October 1, 2006 Rate IS Effective: April 28, 2006 Voltage: Transmission Power Factor: 90% Assumes Substation Ownership
Rate OPT Effective: October 1, 2006 Rate IS Effective: April 28, 2006 Voltage: Transmission Power Factor: 90% Assumes Substation Ownership ASSUMPTIONS Firm MonthlykW 0 Load Factor 100%' MonthiykWh 0 llnterruQtible MonthiykW 50,000 Load Fac...

AI summary This document outlines the cost components and rate structures for two types of transmission power service: Optional Power Service (Rate OPT) and Interruptible Power Service (Rate IS). It provides a detailed breakdown of facilities charges, demand charges (tiered by season and capacity), and energy charges (tiered by peak/off-peak usage) for a 50,000 kW load. The data includes specific cost calculations for both firm and interruptible service types, including a fuel adjustment for Rate OPT.

Max Int. / Min Firm
Max Int. / Min Firm Line Description Rates Units Cost 1 Customer Charge - Firm $170.00 1 $ 170 2 Customer Charge - Interr $28.40 1 28 Demand Charge: 3 Summer (JJAS) $11.45 16,667 190,833 4 Winter 7.70 33,333 256,667 5 Total 50,000 $447,500...

AI summary The document provides a detailed cost breakdown for a 'Max Int. / Min Firm' rate structure. It outlines specific charges including Customer Charges for Firm and Interruptible services, Demand Charges for Summer and Winter periods (including Interruptible Credits), and Energy Charges based on hourly usage. The calculation concludes with a total cost of $1,730,815, incorporating an Electricity Cost Recovery (ECR) mechanism and reflecting a final rate of 52.69 mills per kWh.

Rider M1 reduces units by 2%
Rider M1 reduces units by 2% ASSUMPTIONS Firm Rider M1 Reduc Monthly kW 0 0 Load Factor 100% 100% Monthly kWh 0 0 Interruptible Monthly kW 50,000 49,000 Load Factor 90% 90% Monthly kWh 32,850,000 32,193,000 Total MonthlykW 50,000 49,000 Lo...

AI summary The document provides a detailed cost calculation for a customer under Rider M1, which includes a 2% unit reduction. It breaks down various charges and credits, including Firm Customer Charges, Interruptible Customer Charges, and seasonal On Peak and Excess kW charges for both Summer and Winter periods. The calculation accounts for specific M1 Credits, Demand Credits from a settlement agreement, and various riders such as the M27 Fuel Adjustment, M33 Grand Gulf, and M47 Transition Cost Rider, resulting in a total cost of $1,155,855 at 35.19 mills per kWh.

www.southerncompany.com/gapower/pricing/gpc rates .asp?mnuOpco+gpc&mnuType+com&mnultem-ps
www.southerncompany.com/gapower/pricing/gpc rates .asp?mnuOpco+gpc&mnuType+com&mnultem-ps Voltage: Transmission ASSUMPTIONS Power Factor: 90% Assumes Substation Ownership Firm Monthly kW 0 Load Factor 100% Monthly kWh 0 Interruptible Month...

AI summary The document provides a detailed breakdown of the GPC rates for transmission-level voltage service, specifically for a firm substation ownership scenario with a 50,000 kW capacity and 90% load factor. It outlines a complex tariff structure including base charges, demand charges, and tiered energy charges. Notably, it incorporates the DPEC-1 (Demand Plus Energy Credit) rider, which applies seasonal demand and energy credits, and includes a fuel cost recovery mechanism and state sales tax.

INDIANA MICHIGAN POWER· IN www.aep.com
INDIANA MICHIGAN POWER· IN www.aep.com Voltage; Transmission Power Factor. 90% Assumes Substation Ownership ASSUMPTIONS !Firm MonthlykW 0 Load Factor 100% Monthly kWh 0 lnterru[ltible Monthly kW 50.000 1 Load Factor 90% Monthly kWh 32,850,...

AI summary The document provides a detailed rate schedule for Indiana Michigan Power (AEP) regarding Industrial Power (I.P.) and Interruptible Power (I.R.P.) services effective July 30, 2001. It outlines specific assumptions for firm and interruptible loads, including monthly kW, load factors, and kWh. The tables detail service charges, demand charges per kVA, energy charges per kWh, savings credits, and fuel adjustments, providing a cost breakdown for both firm and interruptible service types.

Note: Fuel Adj. Is combination of Fuel Adj. AND Systems Sales Factor
Note: Fuel Adj. Is combination of Fuel Adj. AND Systems Sales Factor 50 MW Firm Line Description Rates Units Cost Line Description (1) (2) (3) (., 1 —7 Firm Rate: CIP-TOD 1 Service Charge $1,353 1 $1,353 Demand Charge 2 On Peak kW $9.35 50...

AI summary The document provides a detailed rate calculation for the Kentucky Power Company, specifically for the CIP-TOD Firm Rate and the CC IDD Contract Service Interruptible Power (C3-IKF). The breakdown includes service charges, demand charges (on-peak and off-peak kW), energy charges, fuel adjustments, and capacity charges. It also accounts for an environmental surcharge, a Net Merger Savings Rider, and a 6.00% state tax, resulting in a total cost of $1,234,164 and a rate of 37.57 mills per kWh.

Adjustment for Fuel and Fuel included in Rates
Adjustment for Fuel and Fuel included in Rates Fuel Fuel in Total Cost Adjustment Rates of Fuel $/kWh $/kWh $/kWh Jan 2006 0.0029319 0.01651 0.0194419 Apr2006 0.0028528 0.01651 0.0193628 Jul2006 0.0072478 0.01651 0.0237578 Oct 2006 (0.0006...

AI summary The document provides a financial breakdown of fuel costs for Kentucky Utilities Company for the year 2006. It details the quarterly Fuel Adjustment and Fuel included in Rates, expressed in $/kWh. The data shows fluctuations in the Fuel Adjustment, ranging from a negative value in October 2006 to a peak in July 2006. The final calculation determines an Annual Fuel Adjustment of $0.0030870/kWh after subtracting the current fuel included in rates from the total fuel cost.

Transmission Level
Transmission Level ASSUMPTIONS Firm MonthlykW 50,000 Load Factor 90% Monthly kWh 32,850,000 Interruptible MonthlykW 0 Load Factor 0% Monthly kWh 0 Total MonthlykW 50,000 Load Factor 90% Month! kWh 32,850,000 Max Int. I Min Firm Line Descri...

AI summary The document outlines the cost structure for Transmission Level service, based on specific load assumptions including a monthly demand of 50,000 kW and a 90% load factor. It details various charges including customer, demand, and energy charges, alongside fuel adjustments, environmental surcharges, and surcredits (Merger and Value Delivery). It also specifies different curtailable demand credit options based on annual curtailment hour limits.

Adjustment for Fuel and Fuel included in Rates
Adjustment for Fuel and Fuel included in Rates Fuel Fuel in Total Cost Adjustment Rates of Fuel $/kWh ~/kWh ~/kWh Jan 2006 0.0023100 0.01810 0.0204100 Feb 0.0026300 0.01810 0.0207300 Mar 0.0020300 0.01810 0.0201300 Apr 0.0044000 0.01810 0....

AI summary The document provides a monthly breakdown of fuel costs for the year 2006, specifically distinguishing between the Fuel Adjustment and the portion of fuel costs already included in rates. It calculates the total cost of fuel per kWh, determines the average monthly cost, and subtracts the current fuel included in rates to arrive at a net Fuel Adjustment of $0.0062933/kWh. The data pertains to Kingsport Power Company (AEP).

Rate: I.P. - Transmission Level (eft 12/22/97)
Rate: I.P. - Transmission Level (eft 12/22/97) ASSUMPTIONS Firm Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 Interruptible Monthly kW 0 Load Factor 0% Monthly kWh 0 Total Monthly kW 50,000 Load Factor 90% Mont hi kWh 32,850,000...

AI summary The document outlines the rate structure for Industrial Power (I.P.) at the Transmission Level, effective December 22, 1997. It provides a detailed cost breakdown for a 50 MW firm load with a 90% load factor. The rates include a fixed service charge, demand charges based on kW, and energy charges based on kWh. It also accounts for fuel adjustments, a Purchased Power Adjustment Rider, and a prompt payment discount, resulting in a final calculated cost of $1,114,408 with a mill rate of 33.92 mills per kWh.

Rate: LGS· TOU eff. 10/1/06 Rider No. 58 D • Curtaflable Load eff. 10/1/03
Rate: LGS· TOU eff. 10/1/06 Rider No. 58 D • Curtaflable Load eff. 10/1/03 ASSUMPTIONS Firm MonthlykW Load Factor 100% Monthly kWh 0 Interruptible MonthlykW 50,000 Load Factor 90% Monthly kWh 32,850,000 Total Monthly kW 50,000 Load Factor...

AI summary This document outlines the rate structure for Large General Service Time-of-Day (LGS-TOU) with Rider No. 58 D and Curtailable Load for Progress Energy Carolinas, Inc. in North Carolina. It provides a detailed cost breakdown for a 50,000 kW load with a 90% load factor, including basic customer charges, tiered demand charges for summer and winter periods, energy charges for on-peak and off-peak usage, fuel adjustments, and voltage discounts. The final calculation includes a 4.5% sales tax.

Rider No. 58 E - Curtailable Load eff. 711/05
Rider No. 58 E - Curtailable Load eff. 711/05 ASSUMPTIONS Firm MonthlykW 0 Load Factor 100% Monthly kWh 0 Interruptible MonthlykW 50.000 Load Factor 90% Monthly kWh 32,850,000 Total MonthlykW 50,000 Load Factor 90% Monthl kWh 32.850,000 Ma...

AI summary The document outlines the rate structure for Rider No. 58 E - Curtailable Load, effective July 1, 2005, for Progress Energy Carolinas, Inc. in South Carolina. It provides a detailed breakdown of monthly costs for firm and interruptible services, including basic customer charges, tiered demand charges for summer and winter periods, energy charges for on-peak and off-peak usage, fuel adjustments, and voltage discounts. The calculation concludes with a total monthly cost of $1,551,566 based on a 50,000 kW load.

(formerly Carolina Power & Light Company- SC) Adjustment for fuel in rates
(formerly Carolina Power & Light Company- SC) Adjustment for fuel in rates $/kWh Jan 2006 0.0220 Apr2006 0.0220 Jul2006 0.0250 Oct 2006 o.o25o I Average 0.0235 Difference (0.0015) ROCKY MOUNTAIN POWER - ID

AI summary The document provides a historical summary of fuel cost adjustments for the former Carolina Power & Light Company in South Carolina. It lists the specific fuel costs per kilowatt-hour (kWh) for four quarters in 2006, showing a slight increase from January to July, and concludes with an average cost and a calculated difference. The section follows a heading for Rocky Mountain Power in Idaho.

Rate 23, Industrial Power Service eff. 5/1/06 Interruptible Rider- 1/2005
Rate 23, Industrial Power Service eff. 5/1/06 Interruptible Rider- 1/2005 ASSUMPTIONS Firm MonlhlykW 0 Load Factor 100% Monthly kWh 0 Interruptible Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 Total MonthlykW 50,000 Load Factor...

AI summary The document presents a rate calculation for the Industrial Power Service (Rate 23) effective May 1, 2006, specifically focusing on the Interruptible Rider. It outlines cost components for a 50,000 kW load with a 90% load factor, including demand charges, voltage discounts, energy charges, and fuel adjustments. Two interruptible credit options (Option A and Option C) are compared, showing that Option C provides a higher credit and a lower mill per kWh rate than Option A.

14 Mills per kWh
14 Mills per kWh ASSUMPTIONS Firm MonthlykW 0 Load Factor 100% Monthly kWh 0 Interruptible Monthly kW 50,000 Load Factor 90% Monthly kWh 32,850,000 Total MonthlykW 50,000 Load Factor 90% Monlhl kWh 32,850,000 Max Int. I Min Firm Line Descr...

AI summary The document provides a detailed cost calculation for a specific load profile (50,000 kW at a 90% load factor) under the 'Large Light & Power' Firm Rate. It breaks down the monthly costs into demand charges for summer and winter, energy charges, and various riders including a Curtailable Service Rider, Net Merger Savings Rider, and a Fuel Adjustment. The final calculated total cost is $1,387,211, resulting in a rate of 42.23 cents per kWh.

\".tW.v.s .. ve oco om tJ st mP.rSt~r •c: e' tP-sAndTa ri stlega!TarilfAiin s/ is ia na c
\".tW.v.s .. ve oco om tJ st mP.rSt~r •c: e' tP-sAndTa ri stlega!TarilfAiin s/ is ia na c ASSUMPTIONS Rates Effective: 10/22/03 Firm Voltage: Transmission MonlhlykW 50,000 Power Factor. 90% Load Factor 90% Assumes Substation Ownership Mont...

AI summary The document provides a detailed cost breakdown and rate calculation for the Southwestern Electric Power Company in Texas. It outlines assumptions for a firm transmission voltage service with a 50,000 MonthlykW demand and a 90% load factor. The calculation includes demand charges, tiered energy charges, and a fuel adjustment mechanism. The total cost, including a 3.80% state tax, results in a rate of 43.72 mills per kWh.

YlVtW swepr.o com!CpslomerService Rr~tcsAndTarlf1srLeaa!TariffFllingsrrexm;Current.aspx
YlVtW swepr.o com!CpslomerService Rr~tcsAndTarlf1srLeaa!TariffFllingsrrexm;Current.aspx ASSUMPTIONS Rates Effective: February 15, 1984 Firm Voltage: Transmission Monthly kW 0 Power Factor: 90% Load Factor 100% Assumes Substation Ownership...

AI summary The document provides a detailed tariff structure for firm and interruptible electricity rates, effective February 15, 1984. It outlines specific demand charges, energy charges, and various riders—including fuel adjustments, merger savings, and rate reductions—for transmission-level voltage. The data distinguishes between firm service (with 100% load factor assumptions) and interruptible service (with 90% load factor assumptions), calculating total monthly costs and mills per kWh based on specific power factors and consumption volumes.

Preamble
Note: Costs exclude Fuel Cost Surcharges- the fuel cost surcharges for transmission customers are based on actual historical kWh usage recorded during period that the underrecoveriesloverrecoveries accumulated.

AI summary The text provides a technical clarification regarding the exclusion of Fuel Cost Surcharges from specific cost calculations. It specifies that for transmission customers, these surcharges are calculated based on actual historical kilowatt-hour (kWh) usage recorded during the specific period in which the relevant underrecoveries or overrecoveries were accumulated.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 2 (Large File - 15 MB) 15 passages
FIXED FUEL FACTOR
FIXED FUEL FACTOR The above rates are subject to the provisions of Company's Tariff Schedule No. 98 entitled Fixed Fuel Factor.

AI summary The text specifies that the rates mentioned in the preceding section are subject to the provisions set forth in the Company's Tariff Schedule No. 98, which is titled 'Fixed Fuel Factor'.

APPLICABILITY
APPLICABILITY Electric service billed under rate schedules having a Fixed Fuel Factor Clause shall be subject to a Fixed Fuel Factor.

AI summary The text specifies the scope of applicability for the Fixed Fuel Factor. It states that electric services billed under rate schedules that include a Fixed Fuel Factor Clause are required to be subject to the Fixed Fuel Factor.

The Fixed Fuel Factors recognize loss adjustments due to different voltage levels of service:
The Fixed Fuel Factors recognize loss adjustments due to different voltage levels of service: Energy Loss Factor Fixed Fuel Factor ($/KWH) A. Texas System 1.00000 0.03631 (1) B. Transmission Voltage (If customer is not specified below and...

AI summary The document details the Fixed Fuel Factor (FFF) calculations for different voltage levels of service, specifically highlighting loss adjustments. It provides a breakdown of energy loss factors and corresponding Fixed Fuel Factors in dollars per kilowatt-hour ($/KWH) for the Texas System, Transmission Voltage (69,000 volts and higher), Primary Voltage (2,400 to 69,000 volts), and Secondary Voltage (480 volts and below). The rates are categorized by various schedule numbers.

- 18.6.9. Credits shall be applied to bills the month after such credits are earned.
- 18.6.9. Credits shall be applied to bills the month after such credits are earned. AKKANSA 45 PUBL IC SE KVICI - 00 DIVINISSION Revis Repla heet N 34 34 Issued 4/10/95 Name of C Company: THE EN PIRE DISTRI CT ELECTRIC COMPANY Kind of Se...

AI summary The document outlines the Energy Cost Recovery Rider (ECR) for the Connecticut Electric Company. It specifies that credits are applied to customer bills the month following they are earned. The rider establishes a formula to determine the Energy Cost Factor (ECF) per kilowatt-hour, based on the Energy Cost Rate (ECR). The ECR is calculated by summing fuel expenses (FE) and purchased energy expenses (PE) for a specific period, adjusted for carrying charges and other variables.

Agers, Donna
Agers, Donna From: Kim Imhof [[email protected]] Sent: Friday, December 08, 2006 4:55 PM To: Agers, Donna Bill Eichman Cc: Subject: FW: Empire District (Arkansas) - ECR Factors Sensitivity: Confidential Donna, Below are the ECR rat...

AI summary The text is a confidential email from Kim Imhof of Empire District regarding Energy Cost Rate (ECR) factors for the period of October 2005 to March 2007. It notes that annual filings occur on April 1st and reflect fuel costs from the preceding calendar year. The sender mentions that interim filings are permissible if specific criteria are met, referencing an interim filing submitted in October 2005.

ENERGY COST RECOVERY ARKANSAS
ENERGY COST RECOVERY ARKANSAS From To ECR Amount 10-1-05 3-31-06 $0.035365 4-1-06 3-31-07 $0.037657 Thanks, Kim Imhof Regulatory Analyst Empire District Electric Co 417-625-6545 Original Message From: Bill Eichman Sent: Friday, December 08...

AI summary The document contains internal correspondence and data regarding Energy Cost Rate (ECR) factors for Empire District Electric Co. in Arkansas. It specifically lists historical ECR amounts for the periods of October 2005 to March 2006 and April 2006 to March 2007. The correspondence involves communication between a regulatory analyst, a representative from ConsultBai, and Bill Eichman regarding the collection of these factors.

MONTHLY RATE:
MONTHLY RATE: Residential Energy Charge Including Demand Charge: Base Charge$17.00 All consumption (kWh) not greater than 200 hours times the billing demand: First 3,000 kWh All consumption (kWh) in excess of 200 nours and not greater than...

AI summary The text outlines the residential energy charge structure, which includes a base charge of $17.00 and a tiered consumption rate based on the number of hours the billing demand is active. It establishes a minimum monthly bill calculation incorporating the base charge, billing demand, excess kVAR charges, and Fuel Cost Recovery. Additionally, it specifies a separate rate for metered outdoor lighting, capped at the lesser of the standard residential calculation or a flat rate of $38.60 plus Fuel Cost Recovery.

SCHEDULE: "PLL-4"
SCHEDULE: "PLL-4" PAGE 2 of 4 With Bills Rendered for the Billing Month of January, 2006 REVISION Original 3.14 Commercial Energy Charge Including Demand Charge: Base Charge$17.00 All consumption (kWh) not greater than 200 hours times the...

AI summary The document provides a detailed breakdown of the commercial and industrial energy charges for the billing month of January 2006. It specifies the base charges, tiered consumption rates for kilowatt-hours (kWh) based on hours of use, and minimum monthly bill calculations. It also outlines specific pricing for metered outdoor lighting, including a provision to use the lesser of the standard billing calculation or a fixed per-meter rate, both subject to Fuel Cost Recovery.

FUEL COST RECOVERY:
FUEL COST RECOVERY: The amount calculated at the above rate will be increased under the provisions of the Company's effective Fuel Cost Recovery Schedule, including any applicable adjustments.

AI summary The text specifies that the calculated rate will be subject to increases based on the provisions of the Company's effective Fuel Cost Recovery Schedule. This includes any applicable adjustments as defined within that schedule.

FUEL COST RECOVERY SCHEDULE: "FCR-18"
FUEL COST RECOVERY SCHEDULE: "FCR-18" The second of the property of the second of the second of the second of the second of the second of the second of the second of the second of the second of the second of the second of the second of the...

AI summary The provided document is a heading and a table for 'FUEL COST RECOVERY' under Schedule 'FCR-18'. However, the content of the table consists of repetitive, nonsensical placeholder text and does not contain any actual regulatory information, arguments, or data regarding fuel cost recovery.

APPLICABILITY:
APPLICABILITY: This schedule is applicable to and becomes a part of each retail rate schedule in which reference is made to the Fuel Cost Recovery Schedule.

AI summary The document specifies the applicability of the schedule, stating that it becomes an integral part of any retail rate schedule that includes a reference to the Fuel Cost Recovery Schedule.

All bills rendered subject to the Fuel Cost Recovery Schedule shall be respectively increased in an amount equal to:
All bills rendered subject to the Fuel Cost Recovery Schedule shall be respectively increased in an amount equal to: Secondary Distribution customers 3.0248¢ per kWh Primary Distribution customers 2.9767¢ per kWh Transmission customers 2.9...

AI summary The document specifies the rate increases applied to bills subject to the Fuel Cost Recovery Schedule. It provides the exact per kilowatt-hour (kWh) amounts for three different customer categories: Secondary Distribution (3.0248¢), Primary Distribution (2.9767¢), and Transmission (2.9389¢). The text concludes by introducing the definition of 'Fuel Costs' as the cost of specific components.

Preamble
- (1) fossil, nuclear, bio-mass (including renewable) fuel and emission allowances consumed in the Company's own plants, and the Company's share of fossil, nuclear, and bio-mass (including renewable) fuel and emission allowances consumed i...

AI summary The text outlines the methodology for calculating specific energy costs, focusing on fuel and emission allowances for fossil, nuclear, and bio-mass sources. It details the inclusion of costs from own plants, jointly owned plants, and energy purchased for non-specified reasons. It further specifies the treatment of net energy costs for purchases made on an economic dispatch basis, including costs from scheduled outages, while excluding capacity or demand charges. Finally, it accounts for recoveries from intersystem sales and net gains from emissions allowances and wholesale market opportunity sales.

SCHEDULE: "FCR-17"
SCHEDULE: "FCR-17" PAGE EFFECTIVE DATE REVISION PAGE NO. 1 of 2 With Bills Rendered for the Billing Month of June 2005 Original 9.00 AVAILABILITY:

AI summary The provided text is a cover page for Schedule 'FCR-17', which pertains to Fuel Cost Recovery. It specifies that the schedule becomes effective with bills rendered for the billing month of June 2005 and identifies the original revision as page 9.00.

APPLICABILITY:
APPLICABILITY: The MTC will be applied to all customers in the Georgia Power territory as it existed on June 30, 2006 and will be designed to distribute all amounts collected by the MTA to customers in the Georgia Power territory as it exi...

AI summary The text defines the applicability of the Main Terms Charge (MTC) within the Georgia Power territory as of June 30, 2006. It specifies that the MTC is designed to distribute amounts collected by the Main Terms Agreement (MTA) to customers on a per kilowatt-hour basis. However, a specific exclusion is noted: the MTC does not apply to Real-Time Pricing (RTP) customers for usage exceeding their Contract Billing Level (CBL), as these customers are not subject to the higher fuel charges the MTC is intended to compensate.

N-40RIRs Attachment SEB-NSPI - 2c 1 passage
Utilities in Exhibit AR-1, Schedule 1
Utilities in Exhibit AR-1, Schedule 1 Fuel Adjusment Line Utility Company Province Clause 1 Alabama Power Company AL Yes 2 AmerenUE MO No 3 Appalachian Power VA Yes 4 Appalachian Power wv No 5 Aquila Networks- L&P MO No 6 Avista Corporatio...

AI summary The provided text is a table listing various utility companies across different provinces and states in North America. It identifies whether each specific utility company utilizes a 'Fuel Adjustment' mechanism, as indicated in Exhibit AR-1, Schedule 1 of the proceeding.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 5 (Large File - 20 MB) 21 passages
Fuel Adjustment:
Fuel Adjustment: In addition to all other charges, the amount of the Customer's bill will be adjusted by an amount per kilowatt-hour calculated according to the formula in the Fuel Adjustment Rider-Louisiana.

AI summary The document specifies that customer bills will be subject to an additional adjustment per kilowatt-hour. This adjustment is calculated based on a specific formula defined in the Fuel Adjustment Rider-Louisiana.

2006 Fuel Adjustment Factors - louisiana
2006 Fuel Adjustment Factors - louisiana Billing Month Transmission - 138 kV Transmission - 69 kV Primary Substation Primary Secondary January $0.020760 $0.020961 $0.021064 $0.021226 $0.021843 February $0.021392 $0.021600 $0.021707 $0.0218...

AI summary The document provides a detailed schedule of 2006 fuel adjustment factors for Louisiana, categorized by billing month and various transmission and distribution levels (Transmission 138 kV, 69 kV, Primary Substation, Primary, and Secondary). Additionally, it outlines the rates, charges, and fees for large lighting and power service, specifying kilowatt and kilowatt-hour charges based on demand thresholds and referencing Schedule FC for base rate increases.

FIXED FUEL FACTOR
FIXED FUEL FACTOR Electric service billed under applicable rate tariffs shall be subject to this Fixed Fuel Factor in accordance with the Substantive Rules of the Public Utility Commission of Texas Section 25.237. The Fixed Fuel Factor is...

AI summary The document defines the application of the Fixed Fuel Factor to electric service billed under applicable rate tariffs. It specifies that the factor must be applied in accordance with the Substantive Rules of the Public Utility Commission of Texas Section 25.237. The calculation involves multiplying the Fixed Fuel Factor by the kilowatt-hour (kWh) sales, which are read, estimated, or determined based on metering voltage provisions during a specific billing month.

The Fixed Fuel Factors are:
The Fixed Fuel Factors are: Service Voltage February- July Aug - January Transmission- 138 kV $.034499 $.023743 Transmission- 69 kV $.034835 $.023975 Primary Substation \ $.035007 $.024093 Primary $.035308 $.024300 Secondary $.036301 $.024...

AI summary The document provides a schedule of Fixed Fuel Factors for various service voltages and categories, including Transmission (138 kV and 69 kV), Primary Substation, Primary, and Secondary services. The factors are differentiated by season, providing specific rates for the February-July period and the August-January period.

Year To Date 2006 Fuel Adjustment Factors -Texas
Year To Date 2006 Fuel Adjustment Factors -Texas Billing Month Transmission - 138 kV Transmission - 69 kV Primary Substation Primary Secondary January $0.023743 $0.023975 $0.024093 $0.024300 $0.024983 February $0.034499 $0.034835 $0.035007...

AI summary The document provides a detailed table of Year To Date 2006 Fuel Adjustment Factors for the state of Texas. It lists monthly billing factors for various transmission and distribution levels, including 138 kV and 69 kV transmission, Primary Substations, Primary, and Secondary levels. The data shows consistent monthly rates for most of the year, with specific fluctuations in January and August.

Year To Date 2006 Fuel Adjustment Factors D Texas
Year To Date 2006 Fuel Adjustment Factors D Texas Billing Month Transmission - 138 kV Transmission - 69 kV Primary Substation Primary Secondary January $0.023743 $0.023975 $0.024093 $0.024300 $0.024983 February $0.034499 $0.034835 $0.03500...

AI summary The document provides a table of year-to-date 2006 fuel adjustment factors for various service types in Texas, including Transmission (138 kV and 69 kV), Primary Substation, Primary, and Secondary services. It also references specific rate schedules and fuel factors for the Southwestern Public Service Company, including Backbone Service and specific fuel factors for Rate 708 and 709. Additionally, it notes the cancellation of Tariff Number 4300.6 in favor of 4300.7 for Large General Service - Transmission.

LARGE GENERAL SERVICE - TRANSMISSION
LARGE GENERAL SERVICE - TRANSMISSION - BACKBONE SERVICE DISCOUNT: A discount of $1,125 per customer and $0.15 per additional kW of demand per month will be allowed when service is supplied at a voltage of 115 kV or greater. - LOSS ADJUSTME...

AI summary This section outlines the tariff specifications for Large General Service - Transmission. It details a backbone service discount for high-voltage supply (115 kV or greater), loss adjustment protocols for secondary-side metering, and fuel cost recovery mechanisms. It also specifies the character of service (three-phase, 60 hertz, 69,000 volts or above), a minimum three-year contract period, and requirements for customers to pay for line extensions in advance.

Southwestern PUBLIC SERVICE Company
Southwestern PUBLIC SERVICE Company COMMISSION SCHEDULE SHEET RATE SCHEDULE #- With Finn RATE SCHEDULE # - Without Finn PUCTIV-147 Distribution No Notice 714.715.716 Distribution No Notice 684.685,686 Distribution Noticed 717,718.719 Distr...

AI summary The document presents a comparison of rate schedules for Southwestern Public Service Company, specifically contrasting rates with and without 'Finn'. It lists various distribution, transmission, and backbone service categories, including Fuel Factors #3, #5, #7, and #9. Additionally, it notes the cancellation of the Experimental Industrial Interruptible Rate Rider, which was previously available to customers with specific interruptible demand and telemetering capabilities.

LIMITATIONS ON INTERRUPTIONS: Interruptions under this Rider are limited as follows:
pany or those initiated by activation of control equipment by Company, and those resulting from the operation of underfrequency relays installed in connection with instantaneous interruptible service. - FUEL COST RECOVERY: The charge per k...

AI summary The text outlines specific rate components and billing conditions for a utility service. It defines limitations on interruptions caused by control equipment or underfrequency relays, specifies a fuel cost recovery mechanism based on a specific tariff, and establishes payment terms including late fees. Additionally, it details a power factor adjustment based on reactive demand relative to measured kW demand and describes a mechanism for adjusting bills to include various taxes and fees resulting from new or amended laws.

FUEL COST RECOVERY FACTOR
FUEL COST RECOVERY FACTOR Application of fuel cost recovery factors are as follows:

AI summary The document section introduces the application of fuel cost recovery factors within the regulatory proceeding. It serves as a heading for the specific methodology or application rules governing how fuel costs are recovered, though the specific details of the factors are not provided in this brief excerpt.

SECONDARY DISTRIBUTION FUEL COST RECOVERY FACTOR:
SECONDARY DISTRIBUTION FUEL COST RECOVERY FACTOR: The Secondary Distribution fuel cost recovery factor to be billed is 3.6433¢ per kilowatt-hour and shall apply when service is metered at less than approximately 12 kV.

AI summary The document specifies the Secondary Distribution fuel cost recovery factor, establishing a rate of 3.6433¢ per kilowatt-hour. This rate is applicable to services metered at a voltage of approximately 12 kV or less.

PRIMARY DISTRIBUTION FUEL COST RECOVERY FACTOR:
PRIMARY DISTRIBUTION FUEL COST RECOVERY FACTOR: The Primary Distribution fuel cost recovery factor to be billed is 3.5936¢ per kilowatt-hour and shall apply when service is metered at greater than or equal to approximately 12 kV and less t...

AI summary The document specifies the Primary Distribution fuel cost recovery factor, which is set at 3.5936¢ per kilowatt-hour. This rate is applicable to services metered at voltages between approximately 12 kV and 69 kV. This represents a specific cost recovery mechanism for fuel costs associated with primary distribution services.

SUB-TRANSMISSION FUEL COST RECOVERY FACTOR:
SUB-TRANSMISSION FUEL COST RECOVERY FACTOR: The Sub-transmission fuel cost recovery factor to be billed is 3.4397¢ per kilowatt hour and shall apply when service is metered at approximately 69 kV and less than approximately 115 kV or Joss...

AI summary The document specifies the Sub-transmission fuel cost recovery factor, which is set at 3.4397¢ per kilowatt-hour. This rate is applicable to services metered at approximately 69 kV and less than 115 kV, or where Joss compensated meters are utilized to account for sub-transmission losses.

BACKBONE-TRANSMISSION FUEL COST RECOVERY FACTOR:
BACKBONE-TRANSMISSION FUEL COST RECOVERY FACTOR: The Backbone transmission fuel cost recovery factor to be billed is 3.4201 ¢ per kilowatt hour and shall apply when service is metered at greater than or equal to approximately 115 kV or Jos...

AI summary The document specifies the Backbone transmission fuel cost recovery factor, which is set at 3.4201 ¢ per kilowatt hour. This factor is applicable to services metered at approximately 115 kV or higher, as well as instances where Joss compensated meters are utilized to account for losses to the backbone transmission system.

Effective: November 1, 2005 Approved _ _ PURCHASED POWER COST RECOVERY FACTOR (PCRF)

AI summary The document provides the effective date for the Purchased Power Cost Recovery Factor (PCRF) as of November 1, 2005. It serves as a heading for the section detailing the mechanism used to recover costs associated with purchased power within the utility's rate structure.

FUEL COST FACTORS BY $/KWH
FUEL COST FACTORS BY $/KWH #01 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 ## 1 0.030764 0.024302 0.025993 0.025622 0.017074 0.014581 0.016648 0.021543 - - - - #04 - - - - - - - - - - - #06 0.044179...

AI summary The document provides a monthly breakdown of fuel cost factors expressed in dollars per kilowatt-hour ($/kWh) for specific rate classes (identified as #01, #04, and #06) during the first nine months of 2006. The data tracks fluctuations in fuel costs, showing variations across different months, with some months missing data or showing zero values for certain classes.

Base Charges
Base Charges Customer Charge: $1,500 per delivery point per month Demand Charge: $10.36 per kW of billing demand per month plus $0.61 per kW of billing demand per month (environmental adjustment), plus an additional $10.36 per kW per month...

AI summary The text outlines the specific components of the customer charges for electricity delivery. It specifies a fixed monthly base charge of $1,500 per delivery point. It also details demand charges based on billing demand, including a base rate of $10.36 per kW, an environmental adjustment of $0.61 per kW, and penalties for exceeding contract demand. Additionally, it lists monthly kilowatt-hour (kWh) charges including a base rate and a corresponding environmental adjustment.

(This spreadsheet is for reference purposes only. It is not the TV A Rate Schedule or Adjustment Addendum.)
(This spreadsheet is for reference purposes only. It is not the TV A Rate Schedule or Adjustment Addendum.) RATE SCHEDULE Base Rate October 2003 Adjustment Environmental t;· October 2006;' Adjustment FCA ComQosite Rate Residential Service...

AI summary The provided text is a reference spreadsheet detailing historical rate adjustments for various electricity service schedules. It lists base rates, specific adjustments from October 2003 and October 2006 (including environmental adjustments), and Fuel Cost Adjustment (FCA) values to arrive at a composite rate. The data covers residential service, general power service, and various demand charge components for different industrial or commercial schedules.

Applicable also to the second component of the demand charge
Applicable also to the second component of the demand charge October 2003 Environmental October 2006 Composite RATE SCHEDULE Base Rate Adjustment Adjustment FCA Rate Manufacturing Power Service Schedule DSMB Part 1 Demand Charge \ \ Energy...

AI summary The document provides a detailed rate schedule for Manufacturing Power Services, specifically outlining the components of demand charges and energy charges across different schedules (DSMB, DSMC, and DSMD). It compares base rates from October 2003 with adjustments made in October 2006, including Fuel Cost Adjustments (FCA), to arrive at a composite rate. The data specifies different pricing for the first 620 hours of use versus additional kilowatt-hours (kWh).

VIRGINIA SALES AND USE TAX SURCHARGE BY RATE SCHEDULE EFFECTIVE ON AND AFTER JANUARY 1, 2006
VIRGINIA SALES AND USE TAX SURCHARGE BY RATE SCHEDULE EFFECTIVE ON AND AFTER JANUARY 1, 2006 Rate Schedule Sales and Use Tax Surcharge Per kWh 1, 1U $0.00023 1P, 1PU $0.00023 1S, 1SU $0.00023 1T, 1TU $0.00023 1W, 1WU $0.00023 GS-1, GS-1U $...

AI summary The document provides a schedule of the Virginia Sales and Use Tax Surcharge applied per kilowatt-hour (kWh) across various utility rate schedules, effective on and after January 1, 2006. It lists specific surcharge amounts for numerous rate categories, including various GS-series, 1-series, 5-series, and 25-series schedules. The text also introduces the heading for the Fuel Charge Rider-A.

FUEL CHARGE RIDER-B
FUEL CHARGE RIDER-B The charge for service under Virginia Electric and Power Company's Filed Rate Schedules 1, lP, IS, IT, lW, 5, 5C, 5P, 6, GS-1, GS-2, GS-2T, GS-3, GS-4, 6TS, 7, 8, 10, 25, 27, 28 and 29, as well as applicable energy char...

AI summary The document outlines the implementation of Fuel Charge Rider-B for Virginia Electric and Power Company. This rider establishes an increase of 0.135 cents per kilowatt-hour across various filed rate schedules and special contracts. Its specific purpose is to recover the actual fuel deferral balance as of December 31, 2003, in accordance with a previous settlement. The rider is designed to operate concurrently with Fuel Charge Rider-A and is scheduled to remain in effect until the balance is recovered or until June 30, 2007.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 3 (Large File - 23 MB) 28 passages
Preamble
This tariff is subject to a minimum monthly charge equal to the sum of the monthly service charge, the product of the demand charge and the monthly billing demand, the fuel cost adjustment, and the AEP/CSW Net Merger Savings Reduction Ride...

AI summary The text specifies the calculation for the minimum monthly charge applicable to the tariff. This charge is determined by summing four specific components: the monthly service charge, the demand charge multiplied by the monthly billing demand, the fuel cost adjustment, and the AEP/CSW Net Merger Savings Reduction Rider.

Fuel Cost Adjustment .
Fuel Cost Adjustment . This tariff is subject to the Company's fuel cost adjustment determined in accordance with the provisions of Item No. 23 of the Terms and Conditions of Service.

AI summary The text specifies that the tariff is subject to a fuel cost adjustment. This adjustment is determined by the Company in accordance with the provisions set forth in Item No. 23 of the Terms and Conditions of Service.

Fuel Cost Adjustment.
Fuel Cost Adjustment. This tariff is subject to the Company's fuel cost adjustment determined in accordance with the provisions of Item No. 23 of the Terms and Conditions of Service. (Cont'd on Sheet No. 14.2) ISSUED BY JOHN R. SAMPSON VIC...

AI summary The document specifies that the tariff is subject to the Company's fuel cost adjustment, as governed by Item No. 23 of the Terms and Conditions of Service. It notes that the tariff was issued by John R. Sampson, Vice President, and is effective for electric service rendered on or after July 30, 2001, under the authority of the Indiana Utility Regulatory Commission.

22. Employees Discount.
22. Employees Discount. Regular employees who have been in the Company employ for six months or more and are the head of the family or mainly responsible for maintenance of the premises they occupy may, at the discretion of the Company, se...

AI summary The document outlines the eligibility criteria and specific rate structures for employee discounts on residential electric bills. Regular employees with at least six months of service who are primarily responsible for their residence may receive bill reductions. It specifies various rate tiers, including standard service charges, discounted rates for approved energy-storage or load-management water-heating systems, and time-of-day (TOD) rates with distinct on-peak and off-peak pricing.

23. Fuel Cost Adjustment.
23. Fuel Cost Adjustment. A. The energy charges set forth in all rate schedules and those energy charges that are either included in the capacity or demand charges of such rate schedules or in the minimum billings under such rate schedules...

AI summary The document outlines the formula for the Fuel Cost Adjustment (FCA) for electric service. It specifies that energy charges in all rate schedules, including capacity or demand charges and minimum billings, will be adjusted based on a specific calculation. The adjustment factor is determined by the ratio of estimated fuel expenses (F) to a base value (S), minus a constant of $0.008609 per kWh. The fuel expense 'F' is based on a three-month average cost beginning the month following the current billing cycle.

TERMS AND CONDITIONS OF SERVICE
TERMS AND CONDITIONS OF SERVICE (Cont'd from Sheet No. 3.17) - (a) the average cost of fossil and nuclear fuel consumed in the Company's own plants, such cost being only those items listed in Account 151 and Account 518 (exclusive of spent...

AI summary The text outlines specific terms and conditions of service regarding the calculation of fuel costs and energy sales for an electric utility. It defines the components of fossil and nuclear fuel costs, including internal generation, purchases, intersystem sales, and spent nuclear fuel disposal costs. It also provides a formula for estimating kilowatt-hour sales based on net generation, purchases, interchange, sales, and energy losses.

E. Adjustment factors to be applied to the following billing cycle month:
E. Adjustment factors to be applied to the following billing cycle month: _ Jan nuary through March 2006 - - $0.002007/kWh charge. Ap ril through September 2006 - - $0.001651/kWh charge. Oct cober through December 2006 - - $0.001651/kWh Ch...

AI summary The document provides a schedule of adjustment factors applied to specific billing cycles for the years 2006 and 2007. It specifies kilowatt-hour (kWh) charges for three distinct periods: January through March, April through September, and October through December, with the rates varying between $0.001651/kWh and $0.002021/kWh.

ISSUED UNDER AUTHORITY OF THE INDIANA UTILITY REGULATORY COMMISSION DATED AUGUST 23, 2006 IN CAUSE NO. 38702-FAC57
ISSUED UNDER AUTHORITY OF THE INDIANA UTILITY REGULATORY COMMISSION DATED AUGUST 23, 2006 IN CAUSE NO. 38702-FAC57 1/97 Subs station voltage c ustomer - at prim ectly out of a common of a common of the custome of the common of the common o...

AI summary The provided text is a fragmented and repetitive excerpt from a document issued under the authority of the Indiana Utility Regulatory Commission in Cause No. 38702-FAC57. The text appears to be corrupted or improperly formatted, repeating the phrase 'of the common' numerous times, making it impossible to discern any specific arguments, facts, or meaningful content beyond the header information.

APPLICABLE.
APPLICABLE. To Tariffs R.S., R.S.-L.M.-T.O.D. R.S.-T.O.D., S.G.S., M.G.S., M.G.S.-T.O.D., L.G.S., Q.P., C.I.P.-T.O.D., C.S.-I.R.P., M.W.,.O.L., and S.L. 1. The fuel clause shall provide for periodic adjustment per kwh of sales equal to the...

AI summary The document outlines the methodology for calculating the fuel cost adjustment factor within the utility's tariff. It specifies a formula to adjust for the difference in fossil fuel costs per kWh between base and current periods. Key components of the fuel cost (F) calculation include costs from owned/leased plants, energy purchased on an economic dispatch basis, and costs associated with forced outages (defined as nonscheduled losses exceeding six hours). It also specifies inventory costing methods and rules for including costs from Acts of God or other external disruptions.

TARIFF F.A.C. (Cont'd) (Fuel Adjustment Clause)
TARIFF F.A.C. (Cont'd) (Fuel Adjustment Clause) - 5. Sales (S) shall be all kwh's sold, excluding intersystem sales. Where, for any reason billed system sales cannot be coordinated with the fuel costs for the billing period, sales may be e...

AI summary This regulatory text outlines the requirements and procedures for a utility's Fuel Adjustment Clause (F.A.C.). It defines the scope of 'Sales' for fuel cost calculations, specifies that fuel costs must include the invoice price minus discounts, and requires the utility to submit all fuel purchase contracts for Commission review. The regulation establishes a framework for monthly filings, public hearings every six months to review past adjustments, and a comprehensive biennial review to identify and disallow improper expenses or procurement practices.

Agers, Donna
Agers, Donna From: jrw : [email protected] Sent: F Friday, December 08, 2006 8:32 AM To: Agers, Donna Subject: Re: Kentucky Power Adjustments Hi Donna, The fuel adjustment, environmental and net merger credit factors are the same for all cu...

AI summary Donna Agers received a correspondence from Atlantic Power (AEP) regarding Kentucky Power adjustments. The communication clarifies that fuel adjustment, environmental, and net merger credit factors apply uniformly across residential, commercial, and industrial customer classes. It further specifies that residential customers are subject to additional surcharges, including a Home Energy Assistance fee of ten cents per month, a capacity charge, and a demand-side management factor, excluding school taxes or franchise fees.

Month Fuel Adj (/kWh) Capacity Net Merger DSM (/kWh) HEA (per meter)
Month Fuel Adj (/kWh) Capacity Net Merger DSM (/kWh) HEA (per meter) Charge(/kWh) Credit (/kWh) (/dollar) January 06 .0024319 .000847 000595 .000472 .10 .072271 April 06 .0028528 .000824 000595 .000248 .10 003053 July 06 .0072478 .000824 0...

AI summary The provided text is a data table presenting monthly values for various utility charges and adjustments for the year 2006. It includes specific rates for Fuel Adjustment (/kWh), Capacity charges and credits, Demand Side Management (DSM) costs, Home Energy Assessment (HEA) costs per meter, and Net Merger values. The data points are listed for January, April, July, and October of 2006.

The bill amount computed at the charges specified above shall be increased or decreased in accordance with the following:
The bill amount computed at the charges specified above shall be increased or decreased in accordance with the following: Fuel Adjustment Clause Sheet No. 70 Demand-Side Management Surcharge Sheet No. 71 Environmental Cost Recovery Surchar...

AI summary The document specifies the various surcharges and riders that adjust the final bill amount computed from specified charges. These include the Fuel Adjustment Clause, Demand-Side Management Surcharge, Environmental Cost Recovery Surcharge, Merger Surcredit Rider, Value Delivery Surcredit Rider, Franchise Fee Rider, and School Tax. This notice, issued on June 8, 2005, cancels the original sheet issued in July 2004.

AVAILABILITY OF SERVICE
AVAILABILITY OF SERVICE This schedule is a mandatory rider to all electric rate schedules. (1) The charge per KWH delivered under the rate schedules to which this fuel clause is applicable shall be increased or decreased during each month...

AI summary This document outlines a mandatory fuel clause rider for electric rate schedules, establishing the formula for monthly adjustments to the charge per KWH. The adjustment factor is based on the ratio of fossil fuel expenses (F) to KWH sales (S) between a base and current period. It specifies how to calculate fuel costs, including inclusions for forced generation or transmission outages, exclusions for economic dispatch purchases, and provisions for fuel costs recovered through inter-system sales.

FAC Fuel Adjustment Clause
FAC Fuel Adjustment Clause - (4) Sales (S) shall be all KWH's sold, excluding inter-system sales. Where, for any reason, billed system sales cannot be coordinated with fuel costs for the billing period, sales may be equated to the sum of (...

AI summary This document outlines the technical specifications and methodology for the Fuel Adjustment Clause (FAC). It defines 'Sales' as all KWH sold excluding inter-system sales, with specific protocols for when billed sales cannot be coordinated with fuel costs. It specifies that the cost of fossil fuel includes only the invoice price minus discounts, including transportation to the unloading point. The document also establishes the base period (ending September 2004), the base fuel factor (1.810 cents per KWH), and the current period calculation, effective July 2005.

2006 Montly Billing Adjustments
2006 Montly Billing Adjustments Beginning of Fuel Adjustment Factors KU Retail Monthly STOD Cost Recovery Applicable DSM ($Per Kwh) Environmental Cost Recovery Surcharge Applicable to Merger Surcredit Value Delivery Surcredit Effective Bil...

AI summary The document presents a table of monthly billing adjustments for the 2006 period, specifically focusing on various rate components for Industrial Power (I.P.). It details monthly values for fuel adjustment factors, cost recovery applicable to Rate LP, DSM (Demand Side Management) costs, and environmental cost recovery surcharges. Additionally, it tracks Merger Surcredits and Value Delivery Surcredits as percentages of the total bill across different billing cycles from January to December 2006.

MINIMUM CHARGE
MINIMUM CHARGE This tariff is subject to a minimum monthly charge equal to the sum of the service charge, the product of the demand charge and the monthly billing demand and the fuel clause adjustment.

AI summary The text defines the components of the minimum monthly charge for a specific tariff. It specifies that the minimum charge is calculated as the sum of three distinct components: the base service charge, the product of the demand charge multiplied by the monthly billing demand, and the fuel clause adjustment.

FUEL CLAUSE
FUEL CLAUSE When the unit cost of fuel in the charges for power purchased from Appalachian Power Company under Federal Energy Regulatory Commission rate schedule No. 23 is above or below a base unit price of 15.8563 mills per KWH, adjusted...

AI summary The document outlines the fuel clause mechanism for power purchased from Appalachian Power Company under Federal Energy Regulatory Commission rate schedule No. 23. It establishes a base unit price of 15.8563 mills per KWH, adjusted for losses. The clause dictates that the customer's bill will be increased or decreased based on the difference between the actual unit cost of fuel and this base price, using the most recent available calendar month's data.

7. Credits
7. Credits Pursuant to the provisions of this fuder, a permanent Purchased Power Adjustment fuder credit will be applied to each lcilowatt-hour as billed under the Company's filed tariffs, except in the case of the Company's OL tariff whic...

AI summary The document establishes the application of a permanent Purchased Power Adjustment credit to each kilowatt-hour billed under the Company's tariffs. It specifies that while the credit applies generally to all tariffs, the OL tariff will be treated differently, with the credit applied on a per lamp equivalent basis.

Fuel Clause Adjusment .. .. .... .. ...... .... ........ ...... ........ ..... . 2.6827 mills per kWh
Fuel Clause Adjusment .. .. .... .. ...... .... ........ ...... ........ ..... . 2.6827 mills per kWh TARIFF ENERGY CHARGE FUELADJMT. TOTAL ENERGY CHARGE R.S Residential 4.873 ¢/kWh 0.26827 ¢ I kWh 5.14127 ¢ /kWh R.S E Employee 4.142 ¢ /kW...

AI summary The document provides a detailed tariff schedule for fuel clause adjustments, specifically setting the fuel adjustment at 2.6827 mills per kWh. It lists the specific total energy charges for various retail service categories, including Residential, Small General Service, Medium General Service (Primary and Secondary), and Load Management, broken down by on-peak and off-peak periods where applicable. The rates were issued on September 14, 2006, by Dana Waldo.

Effective: October 2, 2006
Effective: October 2, 2006 TARIFF ENERGY CHARGE FUELADJMT. TOTAL ENERGY CHARGE M.G.S Medium Gen. Service (cont'd) Time-of-Day On-peak 8.847 ¢I kWh 0.26827 ¢I kWh 9.11527 ¢/kWh Off-peak 2.755 ¢/kWh 0.26827 ¢I kWh 3.02327 ¢ I kWh L.G.S Large...

AI summary The document presents a tariff schedule effective October 2, 2006, detailing energy charges and fuel adjustment components for various electricity service categories. It specifies rates for Medium Generation Service (Time-of-Day), Large Generation Service (Secondary, Primary, and Subtransmission), Industrial Power (Primary, Subtransmission, and Transmission), Electric Heating General, Church Service, and Public Schools. The data provides a breakdown of the base energy charge, the fuel adjustment amount, and the resulting total energy charge per kilowatt-hour.

Section 130
From: : [email protected] Sent: Monday, December 11, 2006 4:09 PM To: Agers, Donna Subject: Fw: Kingsport Power - Fuel Adjustment See the attached e- mail dated 12/8/06. Forwarded by Thomas L Stephens/RO1/AEPIN on 12/11/2006 05:07 PM Thom...

AI summary This document is an internal email chain from Atlantic Energy Partners (AEP) regarding a fuel adjustment matter for Kingsport Power. The correspondence involves the forwarding of an email from Thomas L. Stephens to Judith R. Willis and others, including representatives from Consultbai, concerning fuel adjustment issues.

The requested Kingsport Power Company Tennessee Retail FAC factors are as follows:
The requested Kingsport Power Company Tennessee Retail FAC factors are as follows: For the Billing Month of Fuel Adjustment Factor (Mills/kWh) January 2006 1.2349 April 2006 1.3678 July 2006 (0.3483) Judith R Willis/AS1/AEPIN

AI summary The document presents the requested Fuel Adjustment Factor (FAC) factors for the Kingsport Power Company Tennessee Retail tariff for three specific billing months in 2006. The factors provided are 1.2349 mills/kWh for January, 1.3678 mills/kWh for April, and a negative adjustment of (0.3483) mills/kWh for July.

AVAILABILITY OF SERVICE
AVAILABILITY OF SERVICE This schedule is a mandatory rider to all electric rate schedules. (1) The monthly amount computed under each of the rate schedules to which this fuel clause is applicable shall be increased or decreased at a rate p...

AI summary The text defines the 'Availability of Service' rider, a mandatory fuel clause for electric rate schedules. It establishes a formula for adjusting monthly amounts based on a fuel cost adjustment factor. The formula accounts for fossil and nuclear fuel costs, including costs from forced outages, while excluding capacity charges and specific economic dispatch purchases. It specifies that fuel costs must be based on weighted average inventory costing and defines 'forced outages' as nonscheduled losses exceeding six hours.

Fuel Adjustment Clause
Fuel Adjustment Clause insurrection or acts of the public enemy, then the Company may, upon proper showing, with the approval of the Commission, include the fuel cost of substitute energy in the adjustment. (3) Sales (S) shall be determine...

AI summary The document excerpt outlines a provision within the Fuel Adjustment Clause regarding the inclusion of substitute energy costs. It specifies that in the event of insurrection or acts of the public enemy, the Company may seek Commission approval to include these costs in the adjustment, provided a proper showing is made. The text also begins to define the methodology for determining Sales (S) in kilowatt-hours.

Subtract:
Subtract: - (d) inter-system sales including economy energy and other energy sold on an economic dispatch basis - (e) total system losses - Pursuant to the Public Service Commission's Order in Case No. 2004-00466 dated May 24, 2005, the Fu...

AI summary The document provides a technical adjustment to a tariff sheet, specifically detailing exclusions and effective dates for the Fuel Adjustment Clause. It specifies that inter-system sales (including economy energy) and total system losses are to be subtracted. It also references a Public Service Commission Order from 2005 establishing the Fuel Adjustment Clause's effectiveness starting in July 2005, while noting the current revision is effective as of June 30, 2005.

RATE
RATE The monthly billing amount under each of the schedules to which this mechanism is applicable, including the fuel clause, shall be increased or decreased by a percentage factor calculated in accordance with the following formula. CESF...

AI summary The text outlines the calculation methodology for the Monthly Environmental Surcharge Factor (MESF). It establishes that the monthly billing amount for applicable schedules will be adjusted by a percentage factor. The formula determines the MESF by subtracting the Base Environmental Surcharge Factor (BESF) from the Current Environmental Surcharge Factor (CESF), where the CESF is calculated as the ratio of the jurisdictional total of approved environmental compliance plan revenue requirements to the total revenue for the current expense month.

LOUISVILLE GAS AND ELECTRIC COMPANY
LOUISVILLE GAS AND ELECTRIC COMPANY MONTHLY ELECTRIC ADJUSTMENTS MONTHLY GAS ADJUSTMENTS Fuel Adjustment Clause !Cents/Kwh) STOD Cost Recovery Applicable to Rate LC !Cents/Kwh) DSM RATES Rate RS Rate GS Rate & VFD & STOD {Cents Per Kwh) LC...

AI summary The document provides a historical monthly data table for Louisville Gas and Electric Company, detailing various electric and gas adjustments from late 2005 through mid-2006. Key metrics include the Fuel Adjustment Clause, STOD Cost Recovery, DSM Rates for various service categories, Environmental Cost Recovery Surcharges, Merger Surcredits, and Value Delivery Surcredits. The data tracks fluctuations in costs and surcharges for both electricity and gas supply across different retail and generation service rates.

N-41RIR 1 Dr. Alan Rosenberg to NSUARB -REDACTED (Large File - 10 MB) 2 passages
NOVA SCOTIA POWER INC. ALLOCATION OF OPERATING EXPENSES FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS)
NOVA SCOTIA POWER INC. ALLOCATION OF OPERATING EXPENSES FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS) (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRI...

AI summary The document presents the allocation of operating expenses for Nova Scotia Power Inc. for the year ending December 31, 2007, categorized by different demand classifications and including various financial components such as fuel costs, depreciation, interest, taxes, and corporate expenses.

FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS)
FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS) (1) TOTAL COMPANY (2) (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) EXTRA LI INTERR 2 (10) (11) UNMETERED...

AI summary The document presents a financial summary and allocation of bad debt expenses and production data across various company segments and classifications for the year ending December 31, 2007, including details on steam, hydro, and gas turbine production.

N-46Rebuttal Evidence of NSPI - REDACTED (Large File - 31 MB) 22 passages
1.0 OVERVIEW
1.0 OVERVIEW 2 3 4 5 6 7 8 9 1 Nova Scotia Power's 2007 Rate Application is the third application in succession, and the fourth in five years. In 2007 NSPI and its customers will experience high and volatile fuel prices. The ability to rec...

AI summary Nova Scotia Power Inc. (NSPI) is requesting rate increases for 2007 due to rising fuel costs and the need to recover deferred expenses. The company argues that timely recovery of these costs is essential for financial stability and continued service delivery. The increase is largely attributed to higher fuel prices compared to previous years.

Preamble
In its response to the Intervenor Evidence in the 2007 Rate Application, NSPI has prepared its own rebuttal on fuel issues as well as solicited the same from external parties, EVA and ICF International.

AI summary NSPI has responded to intervenor evidence in the 2007 Rate Application by preparing a rebuttal on fuel issues and seeking similar input from EVA and ICF International.

17 General Comments
17 General Comments Colin Gubbins 19 EVA is gratified that Liberty and the intervenors have considerably reduced 20 issues related to NSPI's solid fuel procurement efforts which EVA believes is 21 reflective of NSPI's dedication and succes...

AI summary EVA acknowledges progress in NSPI's solid fuel procurement efforts and reduced issues from intervenors. The primary discussion focuses on fuel cost forecasting and the prudence of new mechanisms, with reference to past improvements in transparency and documentation.

Forecasting and Updating
Forecasting and Updating As with prior Applications, a significant share of the differences in fuel cost numbers relate to what forecasts were used to estimate the fuel costs and whether the numbers should be updated to reflect more curren...

AI summary The document discusses the differences in fuel cost numbers, attributing them to the use of different forecasts and the need to update estimates with more current information. These issues are addressed separately in the Applications.

Forecasting
Forecasting In the October 10, 2006 Application, the fuel budget was developed using hedges extant as of combined with forecasts of pricing for the open fuel positions 6 . For that application NSPI revised its methodology for developing th...

AI summary The document discusses NSPI's methodology for forecasting fuel costs, including the use of a consensus forecast for solid fuel and forward price curves for HFO and natural gas. It also mentions objections from intervenors and criticisms of the Hill & Associates forecast by Dr. Raschke.

23 Avon Closing Submission PagelO
to determine longer term trends. If you're buying coal in the next quarter, then a shorter term forecast is probably the best. I would agree with that. 9 Avon Closing Submission, Page 10 SEB in its closing argument had a similar opinion. S...

AI summary The text discusses the use of fuel price forecasts in the 2006 Application, with SEB criticizing the use of Hill & Associates' forecast and emphasizing the need for NSPI to use the most current information. Although the Board did not adopt this position, NSPI revised its methodology for forecasting fuel prices.

27 Updating
27 Updating 29 The Intervenors to varying degrees have requested the fuel forecast be updated to reflect new commitments, more contemporaneous forward price curves and alternative forecasts. Ultimately, this becomes a policy decision for t...

AI summary The Intervenors request an updated fuel forecast considering new commitments and forward price curves, but the Board emphasizes that updating fuel numbers is not a prior practice. Factors affecting fuel costs include load, supplier performance, natural gas volumes, and relative prices for natural gas and HFO. Dr. Raschke's analysis is criticized for using tonnage instead of Btu basis and for overlooking impacts on sulphur loadings and operations.

1 27 about - per barrel. More importantly, the 2 HFO strip for 2008 is per barrel. 3 4 • There has been no evidence as to natural gas prices in 2008, coal prices 5 in 2008, or petroleum coke prices in 2008 that support any "normalizing" 6...

AI summary The text discusses the lack of evidence supporting fuel cost normalization adjustments for 2008, challenges to statistical approaches for fuel cost forecasting, and disputes over the procurement process and pricing comparisons for a coal agreement. EVA's analysis is contrasted with Dr. Raschke's findings, emphasizing the need for proper comparisons considering contract terms, quality, and market factors.

WORLD STEAM COAL PRICES
WORLD STEAM COAL PRICES Mr. Gubbins objects to the contract for different reasons. He states that this contract is in violation of NSPI's policies and procedures. Mr. Gubbins alleges that "(a) tonnes of coal is committed at the time of the...

AI summary Mr. Gubbins objects to a coal contract, claiming it violates NSPI's policies and proposes adjusting the fuel budget. He argues the 2008 pricing is too high, while Dr. Raschke uses a different methodology. The Board previously approved similar contracts, and Liberty found NSPI's procurement process sound. Neither party asserts imprudence, but both seek adjustments based on forecasted market prices.

25 Fuel Adjustment Mechanism
25 Fuel Adjustment Mechanism 26 27 With the exception of Dr. Rosenberg, no evidence has been filed in 28 support of a Fuel Adjustment Mechanism in the current proceeding 34Given the spirit of these reviews, one can only assume that if NSPI...

AI summary The Fuel Adjustment Mechanism is discussed, with no evidence supporting it in the proceeding except from Dr. Rosenberg. There is a reference to NSPI's coal purchasing decisions and prudence in timing, suggesting possible impropriety in not acting earlier.

3 Several points should be made:
3 Several points should be made: 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 - Fuel prices have been extremely volatile. All parties to this proceeding acknowledge that volatility is likely to continue. In fact, Liberty sta...

AI summary The document discusses the volatility of fuel prices and the need for a fuel adjustment mechanism to recover prudently incurred fuel costs. It highlights that such mechanisms are widely used in North America and could reduce financial risks for NSPI. The current regulatory process is criticized as disruptive and expensive, with calls for higher standards in intervenor testimony. EVA recommends the Board issue a directive to design a fuel adjustment mechanism and establish a deferral account.

Fuel Procurement Methodology
Fuel Procurement Methodology 2 1 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 predominantly open state. Fuel contracts have been layered in, incorporating fuel prices from various points in time at various contract...

AI summary The fuel procurement methodology discussed involves a layered approach with contracts incorporating fuel prices from various points in time and terms. This portfolio approach provides stability to fuel costs by ensuring regular purchases of certain volumes.

Fuel Adjustment Mechanism (FAM)
Fuel Adjustment Mechanism (FAM) It is clear some parties have expectations of lower prices for fuel in the future. A F AM can address this issue in a way that is fair to all parties. decreases in commodity prices that may occur in 2007 wil...

AI summary The document discusses NSPI's approach to fuel procurement and the potential implementation of a Fuel Adjustment Mechanism (FAM) in 2007. It highlights NSPI's use of a portfolio approach, collaboration with Liberty Consulting Group, and the need for stakeholder input and regulatory approval for a FAM.

2.4.1 Rebuttal of Liberty Evidence
2.4.1 Rebuttal of Liberty Evidence In its evidence, Liberty is supportive of the progress NSPI has made with respect to its fuel procurement practices in recent years and notes "strong performance", in the completion of its portfolio ahead...

AI summary Liberty acknowledges NSPI's progress in fuel procurement practices and notes its strong performance in completing its portfolio ahead of the deadline. However, there are areas of disagreement between Liberty and NSPI, as outlined in the following sections.

Timing of Forecast
Timing of Forecast Liberty suggests NSPI has forecasted at the time of high prices and has been reluctant to provide information that could support adjustments. On the contrary, NSPI has provided all critical information related to the 200...

AI summary Liberty claims NSPI delayed providing information during high prices, but NSPI argues it provided all necessary data timely. Adjustments to fuel costs should be based on provided information, not arbitrary deferrals. NSPI's inability to predict market peaks is highlighted, and an adjustment to the January 8, 2006 fuel forecast is noted due to an additional gas margin identified.

Uncommitted Tonnage & the Use of Forward Curve Information
respects. &lt;sup>48 NSPI 2005 Rate Case, Raschke Evidence, NSUARB-NSPI, P-881, October 2004, p.31. &lt;sup>49 When presumably he thought it was to the advantage of his client to do so. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21...

AI summary The document discusses NSPI's fuel pricing methodology, including the use of forward curves and consensus forecasts in the 2007 Rate Case, contrasting it with the long-term forecast used in the 2006 test year. Mr. Gubbins is noted for selecting a price forecast that appears to have been chosen with hindsight.

4.2 Ql Fuel Deferral
4.2 Ql Fuel Deferral invalid. Intervenors and Board Consultants have recommended the Board reject the Company's request for deferred recovery of increased fuel costs during the first quarter of 2007. These criticisms fail to recognize the...

AI summary Intervenors and Board Consultants recommend rejecting NSPI's request for deferred recovery of increased fuel costs in Q1 2007, but NSPI argues that legal and regulatory uncertainties, including new legislation, justify the deferral. The company claims that the legislation restricts the Board's ability to approve timely rate increases, preventing recovery of legitimate costs.

Use ofthe ELI 2P-RTP CBL in determining fuel costs
Use ofthe ELI 2P-RTP CBL in determining fuel costs 23 24 25 NSPI's October 10, 2006 Application was predicated on fuel costs of $498.7 million. This was calculated using the load forecast presented as Appendix F of the Application and util...

AI summary NSPI's 2006 application used a $498.7 million fuel cost estimate based on load forecasts and historical load shapes. However, the Board's 2006 Order introduced the ELI 2P-RTP rate with a flat CBL for Extra Large Industrial customers, differing from NSPI's assumptions. NSPI must now use this CBL to calculate fuel costs, with any savings from load reductions allocated as rebates to customers.

Normalization of Fuel Costs
Normalization of Fuel Costs 15 16 17 18 19 20 21 22 Dr. Stutz's approach to setting fuel prices is based on his view that actual fuel costs for 2007 are likely to be significantly less than NSPI's estimate. This is not supported by the fac...

AI summary The text critiques Dr. Stutz's approach to fuel cost normalization, arguing that his statistical projection is flawed and inconsistent with NSPI's approved procurement methodology. It highlights that NSPI has already implemented a hedged fuel strategy for 2007, and Dr. Stutz's analysis fails to account for this, potentially leading to arbitrary disallowance of costs.

1 Introduction
1 Introduction I have read the relevant section of the report [1]; in particular Section JS-3, Historical and Forecast Fuel Related Costs. I have be~n ask~d to comment on the statistical analysis in this section. The data used consists of...

AI summary The text discusses the statistical analysis of historical and forecast fuel-related costs, specifically focusing on the assumption that 13 data points represent a random sample from a normal distribution. The analysis concludes that the forecast value for the cost per MWH is too large, based on the assumption that it is 3 standard deviations from the mean. Dr. Stutz later uses Chebyshev's Inequality to support the conclusion without assuming a normal distribution.

Cormnents regarding the submission of Dr. Stutz to the UARB
Cormnents regarding the submission of Dr. Stutz to the UARB Name: Dr. Bruce Smit h Job Title: Professor, Department of Mathematics and Statistics Employer: Dalhousie University, Halifax, NS Date: January 16, 2007 Purpose of this report: I...

AI summary Dr. Bruce Smith critiques Dr. Stutz's statistical approach in his submission to the UARB, arguing that the analysis is flawed due to nonstationarity in the data and the inappropriate use of a short 13-year dataset. He emphasizes that fuel prices under futures contracts should be treated as fixed costs and that predictive models should account for deterministic factors such as contracted fuel prices.

5.0 CONCLUSION
5.0 CONCLUSION 2 1 7 8 9 10 11 13 14 15 12 16 18 19 17 20 21 22 23 24 25 26 27 28 29 30 In this Rebuttal Evidence, NSPI and its experts rebut the various recommendations from Intervenor and Board consultants that seek, by various means, to...

AI summary NSPI rebuts recommendations from intervenors and consultants that seek to reduce the 2007 test year revenue requirement, arguing that these proposals are arbitrary and not supported by evidence. NSPI emphasizes its prudent fuel procurement practices and asserts that accepting these reductions would increase costs for customers.

N-46Rebuttal Evidence of NSPI - Appendix A to J - REDACTED (Large File 27 MB) 14 passages
Commercial Paper RATING UPDATE
Commercial Paper RATING UPDATE Nova Scotia Power Inc. (NSPI or the Company) continues to perform relatively well and is expected to benefit from the generally positive regulatory decision by the Nova Scotia Utility and Review Board (UARB),...

AI summary Nova Scotia Power Inc. (NSPI) maintains a positive credit outlook following a favorable 2006 rate decision by the Nova Scotia Utility and Review Board. While 2005 metrics were pressured by high fuel costs, 2006 saw recovery due to lower expenses and a favorable natural gas contract settlement. The UARB approved substantial recovery of 2006 projected fuel costs, despite some 'imprudently incurred' costs being disallowed. NSPI's rating is supported by stable cash flows, a regulated capital structure, and favorable load growth, though the lack of a fuel adjustment mechanism remains a key risk.

Challenges
Challenges - Lack of a FAM/regulatory lag impacts earnings - Earnings sensitive to weather and fuel costs - High-cost generator/low population density of franchise - Future competitive pressures from gas distribution network under developm...

AI summary The document outlines several operational and financial challenges facing the utility. Key issues include the impact of regulatory lag on earnings due to the fuel adjustment mechanism, and high sensitivity to weather and fuel costs. The utility faces structural challenges such as high-cost generation and low population density within its franchise. Furthermore, it identifies competitive threats from a developing gas distribution network by Heritage Gas Limited and environmental risks associated with coal-based generation and oil exposure.

EGULATION
EGULATION SPI is regulated by the UARB under a cost-of-service methodology. - Large industrial customers (approximately 15% of sales volumes) are subject to annually adjusted rates, which are adjusted based on an approved formula. - Export...

AI summary The text outlines the regulatory framework for Nova Scotia Power Inc. (NSPI), which is governed by the UARB under a cost-of-service methodology. It highlights a 2006 rate ruling where the UARB approved an 8.6% rate increase and signaled a shift toward full-cost recovery for fuel costs, ending prior 'imprudence' disallowances. The UARB recognized NSPI's improved fuel procurement strategies and noted that while a fuel adjustment mechanism (FAM) is not yet approved, it remains a logical next step once the procurement strategy is finalized.

Challenges
Challenges - (I) In the absence of a FAM, the Company must apply to the regulator for recovery of fuel costs. Regulatory lag can have a material impact on earnings and cash flow, since rate decisions cannot be implemented retroactively. -...

AI summary Nova Scotia Power Inc. (NSPI) outlines several operational and financial challenges, including the need for a fuel adjustment mechanism (FAM) to mitigate regulatory lag and commodity price volatility. The Company highlights its high-cost generation profile and the competitive threat posed by natural gas, noting that infrastructure costs and residential load profiles may limit market share loss. Additionally, NSPI discusses the financial burden of environmental compliance for its coal-based generation and its ongoing discussions with the UARB regarding cost-recoverable emissions reduction strategies.

Summary
Summary - Lower fuel costs during Ql 2006 helped in the recovery of credit metrics for the 12 months ended June 30, 2006. - This is the result of the favourable settlement of a natural gas supply contract, which was offset against a fuel e...

AI summary Nova Scotia Power Inc. (NSPI) experienced improved credit metrics in Q1 2006 due to lower fuel costs resulting from a favorable natural gas supply contract settlement. Conversely, 2005 saw the lowest EBIT and net income in five years because higher actual fuel costs exceeded the 90% recovery approved by the UARB, which deemed certain costs 'imprudently incurred.' Additionally, a lower approved return on equity (ROE) of 9.55% in 2005 compared to 2004 further impacted earnings during that period.

Outlook
Outlook - As a stable, regulated business in a relatively mature market, NSPI's earnings are expected to remain relatively stable over the medium term, absent significant volatility in fuel prices. - The Company will benefit from further e...

AI summary Nova Scotia Power Inc. (NSPI) expects stable earnings over the medium term, supported by provincial economic growth and a recent 8.6% rate increase designed to recover higher fuel costs. While the Company aims to earn within its allowed ROE, global commodity price volatility remains a key challenge. The text notes that full fuel-cost recovery will eventually boost earnings, as current figures reflect the Company's absorption of these costs. It also mentions specific financial items including a past coal contract write-off and deferred taxes.

Nova Scotia Power Inc.
Nova Scotia Power Inc. Dalance Sheet 1 tova Scott a rower inc • Degree day deficiency (% normal) n/a 93.6% 102.0% -2.9% 97.1% 94.6% 92.2% 84.9% Rate base ($ millions) n/a 2,878 2,850 2,832 2,807 2,832 2,752 2,756 Growth in rate base n/a 1....

AI summary The document presents a financial summary table for Nova Scotia Power Inc., detailing key operational and financial metrics. It includes data on degree day deficiency percentages, rate base values, and growth rates. Additionally, it provides a cost structure for self-generation, broken down into components such as OM&A (Operations, Maintenance, and Administration), fuel costs, and variable costs, expressed in cents per net generation rated kWh sold.

Weaknesses:
Weaknesses: - Partial exposure to fuel price risk - Intermediate financial profile - Significant regulatory assets with delayed recovery prospects

AI summary The document identifies three primary financial and structural weaknesses regarding the entity's position. These include partial exposure to fuel price risk, an intermediate financial profile, and the presence of significant regulatory assets that face delayed prospects for recovery. These factors collectively suggest potential risks to the entity's financial stability and its ability to recoup costs efficiently within the regulatory framework.

Rationale
Rationale The ratings on Emera Inc. and its subsidiary, Nova Scotia Power Inc. (NSPI; BBB/Stable/ ), are based on the consolidated business and financial risk profile of the parent, Emera, which is itself based on the consolidated rating m...

AI summary The text provides a credit rating rationale for Emera Inc. and its subsidiary, Nova Scotia Power Inc. (NSPI). The ratings are supported by stable regulated cash flows from monopoly utility operations in Nova Scotia and Maine. However, the rating is constrained by a moderate financial profile, exposure to higher-risk marketing activities, and a lack of a timely fuel cost recovery mechanism for NSPI. Concerns are also noted regarding potential leverage pressure from new pipeline investments and the volatility of fuel costs relative to regulated rates.

Regulation: regime presents some issues
Regulation: regime presents some issues Cost-of-service regulation supports Emera's business risk profile. Nevertheless, the specific regulation that applies to NSPI is viewed as somewhat less favorable than other regulatory regimes. - The...

AI summary Nova Scotia Power Inc. (NSPI) argues that its current regulatory regime is less favorable than those governing its affiliate, Bayonne Hydroelectric Corporation (BHEC). NSPI highlights risks such as the lack of a fuel cost variance mitigation mechanism and the UARB's prioritization of rate stability over cash flow, citing a C$150 million tax recovery deferral. In contrast, BHEC benefits from supportive US regulations, including a higher ROE range, automatic tariff adjustments, and a 50-50 sharing mechanism for performance-based regulation.

Company Profile
NSP is predominantly a coal/pet coke burning utility and is currently exposed to significant fuel price risk. While solid fuel-fired generation makes up only 54% of NSP's total capacity of 2,283 MW, solid fuel-fired generation represents 7...

AI summary Nova Scotia Power Inc. (NSP) faces significant fuel price risk due to its heavy reliance on coal and pet coke for 73% of its energy production. Because NSP lacks a fuel cost pass-through mechanism, it is vulnerable to price volatility. The Nova Scotia Utility and Review Board (UARB) has historically been critical of NSP's procurement practices, leading to significant cost disallowances. These disallowances, combined with tax and depreciation factors, have weakened the cash flow metrics for both NSP and Emera.

Rating Rationale
Rating Rationale NSP's financial metrics, including ratios of FFO/Debt of approximately 12% and FFO/Interest of less than 3.0x, are weak for a Baa1-rated regulated electric utility at the high end of the low business risk category under Mo...

AI summary Moody's provides a rating rationale for Nova Scotia Power Inc. (NSP) and Emera (EMA). NSP is assigned a Baa1 rating, placing it at the high end of the low business risk category due to weak financial metrics (FFO/Debt of 12%, FFO/Interest < 3.0x) and a challenging regulatory relationship involving cost disallowances and uncertain recovery. EMA is rated Baa2, primarily driven by the credit strength of NSP and its subsidiary BHE, while also accounting for EMA's minor unregulated activities and the structural subordination of its debt.

Rating Outlook
Rating Outlook The rating outlook for both EMA and NSPI is negative reflecting the weakness of the companies' financial profiles due to NSP's inability to fully recover its fuel costs through rate increases. The negative outlook also refle...

AI summary Moody's provides a negative rating outlook for Emera (EMA) and Nova Scotia Power Inc. (NSPI), primarily driven by NSPI's inability to fully recover fuel costs via rate increases. The outlook highlights concerns regarding the lack of regulatory or political appetite for fuel price pass-through mechanisms and the risk of NSPI becoming free cash flow negative due to upcoming capital expenditure requirements. A potential upgrade depends on improved credit metrics and the adoption of an automatic fuel price pass-through mechanism.

What Could Change the Rating - Down
What Could Change the Rating - Down Emera's inability to maintain sustainable consolidated credit metrics commensurate with the rating category and the company's risk profile (FFO Interest Coverage of about 3x and FFO/Debt in the mid teens...

AI summary The text outlines specific risk factors that could lead to a downward revision of Emera's credit rating. Key concerns include the company's inability to maintain sustainable consolidated credit metrics (specifically FFO Interest Coverage and FFO/Debt ratios), delays in receiving balanced regulatory decisions, and challenges in managing fuel price risks for Nova Scotia Power Inc. (NSP). Additionally, an increased reliance on short-term or floating-rate debt and any significant business acquisitions or developments are identified as potential risks to the rating.

N-48Minutes of Settlement - Public Utilities Act and Application by NSPI for Approval of Revisions to Rates, Charges and Regulations 3 passages
Section 1
2006 NOVA SCOTIA UTILITY AND REVIEW BOARD P-886 IN THE MATTER OF: The Public Utilities Act, R.S.N.S. 1989, c.380 as amended - and - IN THE MATTER OF: An Application by Nova Scotia Power Incorporated for Approval of Certain Revisions to its...

AI summary Nova Scotia Power Inc. (NSPI) has reached a settlement agreement with intervenors and the Nova Scotia Utility and Review Board regarding revisions to its rates, charges, and regulations. The agreement sets the 2007 revenue requirement, fuel expense, and natural gas margin, and defers certain depreciation rates. All parties agree in principle to adopt a Fuel Adjustment Mechanism (FAM) and request the Board to establish a process to develop it.

Section 2
lish a process that commences as soon as possible to establish a F AM. The parties will work constructively on the content or elements of a F AM. A F AM hearing will begin no later than July 15, 2007. - 5. NSPI shall file with the UARB and...

AI summary The document outlines a process for establishing a Fuel Adjustment Mechanism (FAM) with a hearing no later than July 15, 2007. NSPI is required to file an updated forecast by October 31, 2007. There are discussions around rate adjustments, deferrals, and the adoption of the Revenue to Cost ratio methodology.

Section 3
preclude NSPI or any of the parties from taking any positions in future regulatory proceedings. AGREED, and signed by legal Counsel or other authorized representative, THIS 21st DAY OF JANUARY, 2007. Nova Scotia Power Inc. Per: Rene Gallan...

AI summary This agreement outlines various terms and conditions related to Nova Scotia Power Inc.'s (NSPI) regulatory proceedings, including the application of excess earnings, withdrawal of fuel cost deferral requests, and the adoption of a revenue to cost ratio methodology. It also states that the agreement does not prevent any parties from taking positions in future proceedings.

N-51NSPI Counsel Statement 2 passages
Section 1
Counsel Statement Good morning, Mr. Chairman and members of the Board. Nova Scotia Power was pleased to present to the Board, for review and approval, a Settlement Agreement that resolves all of the issues in this proceeding. This agreemen...

AI summary Nova Scotia Power presented a Settlement Agreement to the Board to resolve the proceeding. The agreement aims to ensure customer rates reflect actual fuel costs and was reached through collaborative discussions. It is supported by various stakeholders, including the Consumer Advocate, Avon Valley, Halifax Regional Municipality, and others.

Section 2
utilities throughout the Province; and - UARB staff and their consultants, Dr. Stutz and Liberty Consulting; And now, Stora Enso and Bowater (SEB) have joined this group and support the Settlement. The parties supporting the settlement are...

AI summary The Settlement Agreement proposes a resolution to the proceeding, excluding constitutional issues related to low-income customers. It involves multiple stakeholders and requires NSPI to forgo 2007 earnings to establish a fuel adjustment mechanism by 2008. The Agreement is seen as a balanced approach to competing interests and is supported by various parties including Stora Enso and Bowater.

N-52N-52.pdf 17 passages
Nova Scotia Utility and Review Board
er of October 11th concerning our 2007 Rate Application. We certainly understand your concerns about higher electricity rates. We assure you that we are working hard to keep our costs and prices down. The reason for our current rate applic...

AI summary Nova Scotia Power Inc. (NSPI) is requesting higher electricity rates due to rising fuel costs, primarily driven by international energy prices. Despite recent declines in crude oil prices, fuel costs for 2007 are expected to be $68 million higher than current rates. NSPI assures that the Board and intervenors will have the opportunity to review contracts and costs.

Nancy McNeil - FW: Hydro increase request
Nancy McNeil - FW: Hydro increase request From: "Affairs, Regulatory" < Regulatory. [email protected]> To: 10/17/2006 10:42:51 AM Date: Subject: FW: Hydro increase request CC: "FERGUSON, ERIC" , "Nancy McNeil" Dear Mr. Collett, The Utilit...

AI summary Nova Scotia Power Inc. (NSPI) explains a rate increase request due to rising fuel costs, including coal, oil, and natural gas, which are beyond their control. They state that the increase is shared by large customers and will not be passed on to residential customers. The Utility and Review Board (UARB) is involved in the process.

Nancy McNeil
Nancy McNeil "Affairs, Regulatory" < Regulatory. [email protected]> From: To: 10/17/2006 10:46:36 AM Date: CC: "Nancy McNeil" , "FERGUSON, ERIC" Dear Mr. Peters. The Utility and Review Board (UARB) forwarded your e-mail of October 11th co...

AI summary Nova Scotia Power Inc. (NSPI) explains a 2007 rate application due to uncontrollable increases in fuel costs, such as coal, oil, and natural gas. They note that fuel costs are their largest expense and are $68 million higher than currently covered by rates. An independent study of operating costs is underway as ordered by the Utility and Review Board (UARB).

Dear Ms Bowes,
Dear Ms Bowes, The Utility and Review Board (UARB) forwarded your e-mail of October 12th regarding our 2007 rate application. We certainly understand your concerns about higher electricity rates. We assure you that we are working hard to k...

AI summary Nova Scotia Power Inc. (NSPI) explains a 2007 rate application due to rising fuel costs and uncontrollable energy price increases. They mention an independent study of operating costs and a review of executive compensation. The letter also addresses concerns about power outages and mentions a customer service manager, Judy O'Leary, will follow up.

Nancy McNeil- NSPI 2007 Rate Application: Thank You For Your Letter
Nancy McNeil- NSPI 2007 Rate Application: Thank You For Your Letter From: "CURTIS, ANNE-MARIE" To: • I Date: 10/1 8/2006 4:31 :45 PM Subject: NSPI 2007 Rate Application: Thank You For Your Letter CC: "FERGUSON, ERIC" , Dear Mr. Koszyca, Th...

AI summary Nova Scotia Power Inc. (NSPI) explains that its 2007 rate application is due to uncontrollable increases in fuel costs, primarily driven by rising world energy prices. Fuel remains the largest expense, and higher oil prices have limited the ability to offset costs through natural gas exports. The forecasted fuel costs for 2007 are $68 million higher than currently covered by rates.

Nancy McNeil- Hydro increase request
Nancy McNeil- Hydro increase request From: "WEBB, LISA" . . To: Date: 10/19/2006 11:28:37 AM Subject: Hydro increase request CC: "Nancy McNeil" , "FERGUSON, ERIC" Dear Mr. Burns: The Utility and Review Board (UARB) forwarded your e-mail of...

AI summary Nova Scotia Power Inc. (NSPI) explains a rate increase request due to rising fuel costs, which are beyond their control. They emphasize that the increase is shared by large customers and not passed on to residential customers. The request was forwarded by the Utility and Review Board (UARB).

Nancy MeN eil - Power
Nancy MeN eil - Power From: "Affairs,Regulatory" To: Date: 10/26/2006 1 :59:20 PM Subject: Power CC: "Nancy McNeil" , "FERGUSON, ERIC" Dear Ms. Walsh: The Utility and Review Board (UARB) forwarded your e-mail of October 23rd regarding our...

AI summary Nova Scotia Power Inc. (NSPI) is requesting a rate increase due to rising fuel costs, citing uncontrollable increases in world energy prices. The email includes a response from a customer expressing concern over the rate increase and its impact on fixed-income and minimum-wage earners. NSPI assures that they are working to keep costs down but highlights the significant increase in fuel costs for 2007.

RECEIVED OCT 2 6 2006
rking hard to keep our costs and prices down. As you note in your letter, the reason for our current rate application is an increase in costs that are beyond our control, namely, world energy prices. We use fuels such as coal, oil and natu...

AI summary Nova Scotia Power Inc. (NSPI) is requesting higher rates due to increased fuel costs driven by rising world energy prices. NSPI explains that fuel is their largest expense and that forecasted costs for 2007 are significantly higher than what is currently covered by rates. They also mention the possibility of a fuel adjustment clause to reduce rates if fuel prices decrease.

Nancy McNeil - Letter of Concern
Nancy McNeil - Letter of Concern From: "Affairs,Regulatory" 'SO I To: Date: 1111/2006 3:56:55 PM Subject: Letter of Concern CC: "Nancy McNeil" , "FERGUSON, ERIC" Dear Mr. Taylor: The Utility and Review Board (UARB) forwarded your e-mail of...

AI summary Nova Scotia Power Inc. (NSPI) explains that its request for higher electricity rates is due to uncontrollable increases in fuel costs, such as coal, oil, and natural gas. The company emphasizes that these costs are significantly higher than what is currently covered by existing rates and cannot be absorbed by the business.

Dear Ms. Clarke:
Dear Ms. Clarke: The Utility and Review Board (UARB) forwarded your e-mail on November 2, 2006 concerning our 2007 rate application. We certainly understand your concerns about higher electricity rates. We assure you that we are working ha...

AI summary Nova Scotia Power Inc. explains that their 2007 rate application is due to uncontrollable increases in fuel costs, such as coal, oil, and natural gas. They acknowledge customer concerns about rising electricity rates and provide energy-saving tips for those using electric heat.

Nancy McNeil- RE: Your letter regarding NSPI's 2007 Rate Application
you consider the effects this proposed increase will have on Nova Scotia families. From: Affairs,Regulatory [mailto:[email protected]] Sent: Friday, November 10, 2006 7:16PM To: [email protected] Cc: [email protected]...

AI summary Nova Scotia Power Inc. (NSPI) explains that its 2007 rate application is due to uncontrollable increases in fuel costs, which are now $68 million higher than the current rate coverage. NSPI emphasizes that the rate increase is necessary due to the significant impact of rising energy prices and assures that the UARB will assess its performance in managing costs.

PLEASE FOREWARD THIS RESPONSE TO ANYONE WHO MAY BE INTRESTED IN THIS RESPONSE.
affect the people you serve who live on low and flxed incomes. I can assure you that we are working hard to keep our costs and prices down, and the UARB will be examining our performance in this area. The reason for our current rate applic...

AI summary Nova Scotia Power Inc. explains that a rate increase is necessary due to rising fuel costs, which are beyond their control. The company assures that low-income customers and other customer groups will not be negatively impacted by the rate increase. They also note that rate increases have been infrequent over the past decade.

RECEIVED
RECEIVED NOV 3 0 2006 Nova Scotia Utility and Review Board November 29, 2006 By Email: [email protected] William Mulock Bridgewater Dear Mr. Mulock: The Utility and Review Board (UARB) forwarded your e-mail of November 5 concerning our a...

AI summary Nova Scotia Power Inc. (NSPI) explains its rate increase application due to rising fuel costs, including a 34% increase in oil prices. NSPI emphasizes that its return on investment is not guaranteed and is subject to cost forecasts. The company also discusses its efforts in renewable energy and coal plant modernization.

Dear Ms. Brown:
Dear Ms. Brown: The Utility and Review Board (UARB) forwarded your e-mail of December 9 concerrung our application for new rates effective April 1, 2007. We certainly understand your concerns about higher electricity rates. We assure you t...

AI summary Nova Scotia Power Inc. (NSPI) explains that the proposed rate increase is due to rising fuel costs, including a 34% increase in oil prices. They address concerns about the impact of Stora's rates on other customers and explain the cause of a recent outage involving a truck collision. NSPI also offers to investigate tree trimming practices if provided with more details.

Re: 2007 Nova Scotia Power General Rate Hearing
PUB granted a residential rate increase of 8.9 %. This reflected the fuel price increases up to that date. Fuel prices for crude oil are lower today than they were at that time in the spring of 2006. - 3) The public is not privy to the act...

AI summary The PUB approved an 8.9% residential rate increase in 2007, reflecting fuel price increases up to that date. However, concerns are raised about the lack of transparency in N.S. Power's fuel contracts and the absence of a fuel procurement policy, potentially impacting the company's financial performance and ratepayer interests.

Preamble
- 6) The cost of coal contracts are less transparent and it is up to the PUB to determine if proper value has - been achieved under present fuel contracts. The hedging of fuel requirements is intended to level out the highs and lows of fue...

AI summary The text discusses concerns over the transparency of coal contract costs and discrepancies in projected fuel expenses. It highlights the PUB's role in determining if fair value is achieved under fuel contracts and questions the accuracy of figures provided by NSPI. The PUB is urged to seek clarification on these issues.

Nova Scotia Power Inc. - Application for Approval of Certain Revisions to its Rates, Charges and Regulations - P-886
Nova Scotia Power Inc. - Application for Approval of Certain Revisions to its Rates, Charges and Regulations - P-886 Receipt is acknowledged of your letter received by email on January 18, 2007, wherein you express concerns and opposition...

AI summary The Sierra Club of Canada opposes Nova Scotia Power Inc.'s rate increase application, citing concerns over fuel cost transparency, the use of high-sulphur PET coke, and the need for the UARB to regulate fuel consumption. They argue for a rate increase penalty and denial of the increase until the use of PET coke ceases.

N-54Direct Testimony - Consumer Advocate Witnesses - Michael J. McGarry and Rudolph C. Krizan 2 passages
Before the New York Public Service Commission
Before the New York Public Service Commission Operational Audit of the Fuel Procurement and Contracting of Long Island Lighting Company Commission Staff. Comprehensive operational audit to determine effectiveness of ratepayer funds spent o...

AI summary This document outlines a comprehensive operational audit conducted by Commission Staff to evaluate the effectiveness of ratepayer funds spent on non-nuclear fuel procurement and contracting by Long Island Lighting Company.

Before the New York Public Service Commission
Before the New York Public Service Commission Operational Audit of the Fuel Procurement and Contracting of Rochester Gas and Electric Commission Staff. Comprehensive operational audit to determine effectiveness of ratepayer funds spent on...

AI summary A comprehensive operational audit of Rochester Gas and Electric's fuel procurement and contracting processes was conducted by Commission Staff to evaluate the effectiveness of ratepayer funds spent on nuclear fuel, leveraging research and data evaluation expertise.

57960Board Decision 9 passages
Preamble
Appendix- A List of Formal Intervenors Appendix- 8 Appearances at the Public Hearing - Evening Session 1.0 INTRODUCTION [1] This decision is further to a public hearing conducted by the Nova Scotia Utility and Review Board (the "Board") ov...

AI summary This document outlines a regulatory proceeding in which Nova Scotia Power Incorporated (NSPI) applied for rate revisions in 2007. The application sought a 7.5% average rate increase, primarily due to rising fuel costs. The Board conducted a public hearing to review the application, and NSPI acknowledged a decrease in fuel costs but maintained that other costs would necessitate the rate increase.

3.1 Process
3.1 Process [12] At the beginning of the hearing, S. Bruce Outhouse, Q.C., Board Counsel, outlined the process by which the parties had reached the Agreement: ... The Settlement Agreement, as it's referred to, was negotiated has been negot...

AI summary The Settlement Agreement, negotiated between NSPI and certain intervenors, aims to reduce NSPI's revenue requirement for the 2007 test year by $38.1 million. It includes a request for the Board to establish a fuel adjustment mechanism. Not all intervenors signed the agreement, and the hearing will proceed despite the settlement.

MINUTES OF SETTLEMENT
MINUTES OF SETTLEMENT WHEREAS the Applicant, Nova Scotia Power Inc. ("NSPI"), the undersigned Intervenors (Avon Valley et al, the Consumer Advocate, the Halifax Regional Municipality, and the Municipal Electric Utilities Co-operative of No...

AI summary The document outlines a settlement agreement regarding NSPI's 2007 revenue requirement, fuel expenses, and the adoption of a Fuel Adjustment Mechanism (FAM). It also addresses deferrals, rate adjustments, and the continuation of certain regulatory studies.

MR. MERRICK
MR. MERRICK Yes, Mr. Chair, I just want to make it clear on the record that while there is a provision in paragraph 4 relating to the development at some point of a FAM, it is agreed and understood that the reading of paragraph 4 of the mi...

AI summary The Consumer Advocate clarifies that while a FAM is mentioned in the minutes of settlement, it is not yet appropriate to implement one, but discussions on it may continue. SEB's consent to the Settlement Agreement is conditional on the Board ensuring that retroactive rate adjustments are not allowed and that a full review process for a FAM is conducted.

3.5 Intervenors Objecting to Settlement Agreement
3.5 Intervenors Objecting to Settlement Agreement [19] Two of the inteNenors appearing at the hearing did not support the Agreement. Claire McNeil, on behalf of the AEC and Brendan Haley, representing the EAC, were not part of the Settleme...

AI summary Two intervenors, AEC and EAC, objected to the Settlement Agreement, arguing that any rate increase should not affect low-income residential consumers and that constitutional and human rights violations should be addressed before the fuel adjustment mechanism hearing. They also emphasized the need for a retroactive remedy for these violations.

3.7 Findings
must be satisfied that the outstanding concerns of all intervenors are adequately considered by the Board and the terms and conditions under which they consent to a settlement agreement are honoured. [24] The Settlement Agreement at hand c...

AI summary The Board finds that the Settlement Agreement warrants approval, as it addresses concerns around fuel costs and rate increases. The agreement reduces the original revenue requirement request by significantly lowering fuel costs and deferring depreciation rate increases. The parties have agreed to a FAM, which will be considered at a Board hearing starting no later than July 15, 2007.

4.0 FUEL ADJUSTMENT MECHANISM
4.0 FUEL ADJUSTMENT MECHANISM - [39] The Minutes of Settlement state: - 4. All parties agree in principle that the UARB should adopt a Fuel Adjustment Mechanism ("FAM"). The parties request the UARB to establish a process that commences as...

AI summary The document discusses the Fuel Adjustment Mechanism (FAM) and the UARB's considerations regarding its adoption. While parties agree in principle on the FAM, the Board has previously expressed concerns about approving it due to NSPI's imprudent fuel procurement practices and the risk of transferring fuel price volatility to ratepayers.

4.1 Findings
4.1 Findings - [44] The Board recognizes, as was noted in the 2005 decision, that FAM's exist in many other jurisdictions and operate satisfactorily. The Board has agreed to accept the Settlement Agreement and therefore has agreed to estab...

AI summary The Board acknowledges the existence of Fuel Adjustment Mechanisms (FAM) in other jurisdictions and agrees to establish a process leading to a hearing on whether to adopt a FAM for NSPI. However, it emphasizes that no decision to implement a FAM has been made yet. Several prerequisites, such as fuel procurement policy and transparency, must be met before considering adoption.

6.0 COMPLIANCE WITH OUTSTANDING BOARD DIRECTIVES
6.0 COMPLIANCE WITH OUTSTANDING BOARD DIRECTIVES [59] There remain outstanding a number of directives from the 2005 and 2006 rate decisions. The operations audit is dealt with in Section 5 of this decision. Other directives include the aff...

AI summary The document outlines outstanding directives from 2005 and 2006 rate decisions, including the affiliate audit and finalizing Liberty's fuel recommendations, which must be addressed promptly ahead of the FAM process. These tasks are part of the IRP process.

57966Supplementary Board Order 3 passages
SR- Studies and Reports (latest available)
SR- Studies and Reports (latest available) - 1. Cost of Service study. - 2. Load Forecast report. - 3. Fuel Price Forecasts (industry forecasts used to indicate future trends in gas, oil, and coal prices). Document #: 130187

AI summary The document lists three studies and reports: a Cost of Service study, a Load Forecast report, and Fuel Price Forecasts indicating future trends in gas, oil, and coal prices. These are part of the latest available studies and reports for the proceeding.

OP - Organization Profile
OP - Organization Profile - 1 . Latest regulated annual reports of NSPI and EMERA. - 2. Current organization chart of NSPI showing all positions reporting no further than two levels down from the President and CEO, including a full organiz...

AI summary The document outlines a list of information requests related to Nova Scotia Power Inc. (NSPI) and EMERA, including financial reports, organizational structure, asset details, maintenance schedules, fuel specifications, reliability statistics, customer data, and compliance with emissions targets.

OE - Operating expenses
OE - Operating expenses - 1. Fuel, purchased power costs. - (A) Provide the latest detailed fuel forecast for test year in the same format and level of detail as the 2005 rate case (P-881) response to UARB IR-49 and as submitted in 2007 ra...

AI summary The document requests detailed information on fuel and purchased power costs, including forecasts, historical data, and cost breakdowns for various fuel types. It also asks for details on fuel burn levels, emissions, and transportation costs related to solid fuels.

57968Amended Board Order (and attached Schedules A to C) 2 passages
NUNUTESOFSETTLEMENT
NUNUTESOFSETTLEMENT WHEREAS the Applicant, Nova Scotia Power Inc. (''NSPr'), the undersigned Intervenors (Avon Valley et al, the Consumer Advocate, the Halifax Regional Municipality, and the Municipal Electric Utilities Co-operative ofNova...

AI summary The document outlines an agreement between Nova Scotia Power Inc. and various intervenors regarding the 2007 revenue requirement, fuel expense, depreciation rates, and the implementation of a Fuel Adjustment Mechanism (FAM). The agreement is subject to approval by the Nova Scotia Utility and Review Board.

Section 275
- 6. Excess earnings by NSPI, if any, in 2007 and 2008 will be applied to the S21 unamortized balance. - 7. NSPI's request for a deferral of first quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSPI's Applicatio...

AI summary The text outlines several decisions and agreements related to Nova Scotia Power Inc. (NSPI) in a regulatory proceeding. It includes the application of excess earnings to an unamortized balance, withdrawal of a fuel cost deferral request, and the adoption of a revenue-to-cost ratio methodology. The agreement does not preclude future regulatory positions and allows for a potential rate adjustment proceeding for 2008.

57960Board Decision 10 passages
Preamble
Appendix- A List of Formal Intervenors Appendix- 8 Appearances at the Public Hearing - Evening Session 1.0 INTRODUCTION [1] This decision is further to a public hearing conducted by the Nova Scotia Utility and Review Board (the "Board") ov...

AI summary This document outlines a regulatory proceeding in which Nova Scotia Power Inc. (NSPI) requested a 7.5% average rate increase in 2007, citing increased fuel costs. The Board conducted a public hearing to review the application, and NSPI acknowledged a reduction in fuel costs but maintained the need for rate increases due to other rising costs.

3.1 Process
3.1 Process [12] At the beginning of the hearing, S. Bruce Outhouse, Q.C., Board Counsel, outlined the process by which the parties had reached the Agreement: ... The Settlement Agreement, as it's referred to, was negotiated has been negot...

AI summary The Settlement Agreement between NSPI and several intervenors outlines a process for developing a fuel adjustment mechanism and reduces the company's revenue requirement for the 2007 test year by $38.1 million, leading to a 3.8% average rate increase for above-the-line customers. Not all intervenors signed the agreement, and some intend to continue their case in the hearing.

MINUTES OF SETTLEMENT
MINUTES OF SETTLEMENT WHEREAS the Applicant, Nova Scotia Power Inc. ("NSPI"), the undersigned Intervenors (Avon Valley et al, the Consumer Advocate, the Halifax Regional Municipality, and the Municipal Electric Utilities Co-operative of No...

AI summary The parties involved in the proceeding have reached a settlement agreement, including setting NSPI's 2007 revenue requirement, deferring depreciation rates, and agreeing on the adoption of a Fuel Adjustment Mechanism (FAM). The agreement outlines specific financial parameters and timelines for future actions, including the filing of updated forecasts and the deferral of certain requests.

MR. MERRICK
MR. MERRICK Yes, Mr. Chair, I just want to make it clear on the record that while there is a provision in paragraph 4 relating to the development at some point of a FAM, it is agreed and understood that the reading of paragraph 4 of the mi...

AI summary The Consumer Advocate clarifies that while a Fuel Adjustment Mechanism (FAM) may be considered, its implementation is not currently appropriate. SEB's consent to the Settlement Agreement is conditional, requesting assurance that retroactive rate adjustments will not occur and that it will have full input in any FAM process. The Board confirms it cannot order retroactive rate changes, citing legal precedents.

3.5 Intervenors Objecting to Settlement Agreement
3.5 Intervenors Objecting to Settlement Agreement [19] Two of the inteNenors appearing at the hearing did not support the Agreement. Claire McNeil, on behalf of the AEC and Brendan Haley, representing the EAC, were not part of the Settleme...

AI summary Two intervenors, AEC and EAC, opposed the Settlement Agreement, arguing that any rate increase would violate constitutional and human rights, and they sought a remedy for low-income residential consumers. They requested that these issues be addressed before the fuel adjustment mechanism hearing. Written submissions were due by January 26, 2007, and the hearing was scheduled to conclude on January 24, 2007.

3.7 Findings
must be satisfied that the outstanding concerns of all intervenors are adequately considered by the Board and the terms and conditions under which they consent to a settlement agreement are honoured. [24] The Settlement Agreement at hand c...

AI summary The Board finds that the Settlement Agreement warrants approval, primarily due to changes in fuel costs. The agreement reduces the original revenue requirement request by significantly lowering fuel costs, deferring depreciation rate increases, and adjusting RIC ratios. Most intervenors focused on fuel costs, and the agreement reflects that rate increases are fair given the cost increases experienced by NSPI.

4.0 FUEL ADJUSTMENT MECHANISM
4.0 FUEL ADJUSTMENT MECHANISM - [39] The Minutes of Settlement state: - 4. All parties agree in principle that the UARB should adopt a Fuel Adjustment Mechanism ("FAM"). The parties request the UARB to establish a process that commences as...

AI summary The document discusses the Fuel Adjustment Mechanism (FAM) and the Board's stance on its adoption. While parties agree in principle on establishing a FAM, the Board has previously rejected proposals due to concerns over NSPI's fuel procurement practices and the risk of transferring fuel price volatility to ratepayers.

4.1 Findings
4.1 Findings - [44] The Board recognizes, as was noted in the 2005 decision, that FAM's exist in many other jurisdictions and operate satisfactorily. The Board has agreed to accept the Settlement Agreement and therefore has agreed to estab...

AI summary The Board acknowledges the existence of Fuel Adjustment Mechanisms (FAM) in other jurisdictions and agrees to establish a process leading to a hearing to determine if adopting a FAM for NSPI is appropriate. It emphasizes that no decision to implement a FAM has been made yet and outlines prerequisites such as a sound fuel procurement policy, transparency, and an audit process.

PROPOSED TIMELINE
PROPOSED TIMELINE Date Week No. Actions & Activities February 5 Hearing Order Issued February 19 3 Workshop 1 March 5 5 Filing FAM Proposals by NSPI and Intervenors March 12 6 Workshop 2 March 19- April9 7-10 Discussion April16 11 Workshop...

AI summary The proposed timeline outlines key dates and activities for a regulatory proceeding, including workshops, evidence filing, and hearings. Dr. Stutz will guide the topics discussed during the workshops.

6.0 COMPLIANCE WITH OUTSTANDING BOARD DIRECTIVES
6.0 COMPLIANCE WITH OUTSTANDING BOARD DIRECTIVES [59] There remain outstanding a number of directives from the 2005 and 2006 rate decisions. The operations audit is dealt with in Section 5 of this decision. Other directives include the aff...

AI summary The document highlights the need for NSPI to address outstanding directives from past rate decisions, including the affiliate audit and finalizing Fuel Adjustment Mechanism recommendations from Liberty, in preparation for the upcoming FAM process.

57964Notice - NSPI 2007 Rate Application - Final Issues List 1 passage
FINAL ISSUES LIST
FINAL ISSUES LIST The following issues will be dealt with in the public hearing on Nova Scotia Power Inc.'s ("NSPI") 2007 Rate Application, set to begin January 22, 2007: - 1. Fuel Related Issues (including experience since 2000): - Deferr...

AI summary The Final Issues List outlines key topics for the public hearing on Nova Scotia Power Inc.'s 2007 Rate Application, including fuel costs, compliance with Board directives, deferred tax items, and OM&G costs, with a focus on experience since 2000 and audit findings.

57966Supplementary Board Order 2 passages
SR- Studies and Reports (latest available)
SR- Studies and Reports (latest available) - 1. Cost of Service study. - 2. Load Forecast report. - 3. Fuel Price Forecasts (industry forecasts used to indicate future trends in gas, oil, and coal prices). Document #: 130187

AI summary The document lists three studies and reports related to cost of service, load forecasting, and fuel price forecasts for gas, oil, and coal. These reports are part of the latest available studies and reports section.

OE - Operating expenses
OE - Operating expenses - 1. Fuel, purchased power costs. - (A) Provide the latest detailed fuel forecast for test year in the same format and level of detail as the 2005 rate case (P-881) response to UARB IR-49 and as submitted in 2007 ra...

AI summary The document requests detailed information on fuel and purchased power costs, including forecasts, historical data, and cost breakdowns for various fuel types. It also asks for details on fuel burn levels, emissions, and solid fuel requirements for future years.

57968Amended Board Order (and attached Schedules A to C) 6 passages
RATE MECHANISM:
RATE MECHANISM: The intent of this rate is to create a mechanism enabling customers to gain benefit equal to the benefit created by altering load usage in accordance to hourly pricing signals. The customer will be billed based on a pre-det...

AI summary This rate mechanism aims to align customer benefits with load adjustments based on hourly pricing signals. Customers are billed based on a pre-determined CBL at the Standard Energy Charge, with credits and costs applied based on energy deviations from the CBL, calculated using the 20-minute ahead marginal cost from NSPI's RTP website.

Marginal Cost (MC)
Marginal Cost (MC) The MC will be the 20-minute ahead forecast of hourly marginal fuel and variable O&M cost in any hour, excluding any impacts of electricity exports, but including imports when they impact marginal costs. The MC forecast...

AI summary The Marginal Cost (MC) is defined as the 20-minute ahead forecast of hourly marginal fuel and variable O&M costs, excluding electricity exports but including imports. NSPI calculates the MC forecast based on in-province load requirements, and the ELI 2P-RTP tariff uses the CBL value for load levels. Hourly price forecasts are provided daily, and billing uses the adjusted MC as outlined in the Decremental Rebate section.

NUNUTESOFSETTLEMENT
NUNUTESOFSETTLEMENT WHEREAS the Applicant, Nova Scotia Power Inc. (''NSPr'), the undersigned Intervenors (Avon Valley et al, the Consumer Advocate, the Halifax Regional Municipality, and the Municipal Electric Utilities Co-operative ofNova...

AI summary Nova Scotia Power Inc. (NSPI) has reached an agreement with intervenors and the Nova Scotia Utility and Review Board (UARB) on a 2007 revenue requirement, fuel expense, depreciation rates, and the establishment of a Fuel Adjustment Mechanism (FAM). The agreement includes deferral provisions and a request for a FAM hearing by July 15, 2007.

Section 273
- 7. NSPI's request for a deferra] of first quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSPI's Application including: rate base and return on rate base, return on equity, OM&G, regulatory amortizations and in...

AI summary The document outlines various decisions and agreements related to NSPI's regulatory proceedings, including the withdrawal of a fuel cost deferral request, no changes to rate base and return on equity, deferral of a true-up for the ELI 2P-RTP rate, and adoption of the Revenue to Cost ratio methodology with modifications.

Section 275
- 6. Excess earnings by NSPI, if any, in 2007 and 2008 will be applied to the S21 unamortized balance. - 7. NSPI's request for a deferral of first quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSPI's Applicatio...

AI summary The document outlines a series of agreements and decisions related to NSPI's financial arrangements, including the handling of excess earnings, withdrawal of a fuel cost deferral request, and the adoption of a revenue-to-cost ratio methodology. It also notes that the agreement does not preclude future regulatory actions.

Section 276
tes for 2008. - 6. Excess earnings by NSPI, if any, in 2007 and 2008 will be applied to the S21 unamortized balance. - 7. NSPI's request for a deferral of first quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSP...

AI summary This document outlines several decisions and agreements related to NSPI's financial matters, including the application of excess earnings, the withdrawal of a fuel cost deferral request, and the adoption of a revenue-to-cost ratio methodology. It also mentions the continuation of certain regulatory proceedings and the involvement of various parties.

57969Notice - NSPI 2007 Rate Application - Preliminary Issues List 1 passage
PRELIMINARY ISSUES LIST
PRELIMINARY ISSUES LIST The following issues will be dealt with in the public hearing on Nova Scotia Power Inc. 's ("NSPI") 2007 Rate Application, set to begin January 22, 2007: - 1. Fuel Related Issues (including experience since 2000): -...

AI summary The preliminary issues list for Nova Scotia Power Inc.'s 2007 Rate Application includes topics such as fuel costs, compliance with directives, deferred items, OM&G costs, financial issues, and existing regulations. The hearing will address deferred fuel costs, tax deferrals, depreciation, pension costs, credit ratings, return on equity, and regulatory changes.

57974NSPI Compliance Filing 2007 Rate Application - REDACTED (Large File - 36 MB) 10 passages
Preamble
a future proceeding if actual 2007 gas margin is less than $4 7 million. 32 33 3. The third year of the phase in of depreciation rates is deferred for recovery in the next general rate application. This reduces 2007 depreciation expense by...

AI summary The document outlines several financial and regulatory matters related to Nova Scotia Power Inc. (NSPI), including the deferral of depreciation rates, the agreement on establishing a Fuel Adjustment Mechanism (FAM), and the withdrawal of a fuel cost deferral request. It also mentions the application of excess earnings to an unamortized balance and the requirement for NSPI to provide updated cost forecasts.

MINUTES OF SETTLEMENT
MINUTES OF SETTLEMENT WHEREAS the Applicant, Nova Scotia Power Inc. (''NSPI"), the undersigned Intervenors (Avon Valley et al, the Consumer Advocate, the Halifax Regional Municipality, and the Municipal Electric Utilities Co-operative of N...

AI summary The document outlines a settlement agreement reached between Nova Scotia Power Inc. (NSPI) and various intervenors, including the Consumer Advocate and the Nova Scotia Utility and Review Board (UARB). The agreement sets revenue requirements, fuel expenses, and outlines the deferral of certain costs. It also requests the UARB to adopt a Fuel Adjustment Mechanism (FAM) and sets a timeline for related proceedings.

Section 24
- 7. NSPI's request for a deferral of first quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSPI's Application including: rate base and return on rate base, return on equity, OM&O, regulatory amortizations and in...

AI summary NSPI has withdrawn its request to defer first quarter 2007 fuel costs and made no further changes to its application. The UARB directive regarding the study of NSPI's OM&G remains incomplete. The Revenue to Cost ratio methodology will be adopted with modifications. The agreement does not prevent future regulatory positions.

Section 26
- 7. NSPI's request for a deferral of first quarter 2007 fuel costs is withdrawn. - 8. There are no further changes to NSPI's Application including: rate base and return on rate base, return on equity, OM&G, regulatory amortizations and in...

AI summary NSPI has withdrawn its request to defer first quarter 2007 fuel costs and made no further changes to its application. The UARB directive regarding the study of NSPI's OM&G remains incomplete. The Revenue to Cost ratio methodology will be adopted with modifications. This agreement does not prevent future regulatory positions.

Nova Scotia Power Inc. Regulated Statement of Earnings Years Ended December 31st Millions of Dollars
Nova Scotia Power Inc. Regulated Statement of Earnings Years Ended December 31st Millions of Dollars Compliance Filing • 2007 Rate Case Compliance Filing • 2007 Rate Case 2 (1) Proposed Rates (2) Compliance Rates (3) Test Year Forecast 200...

AI summary This document presents Nova Scotia Power Inc.'s regulated statement of earnings for the years ended December 31st, showing a slight decrease in revenue and earnings from operations, primarily due to changes in fuel and purchased power costs.

Section 42
44 1) Figures presented reflect whole numbers which may cause $0.1 M in rounding differences on some line items. Nova Scotia Power Inc. Detail of Fuel and Purchased Power Years Ended December 31st Millions of Dollars

AI summary The text presents a detail of fuel and purchased power figures for Nova Scotia Power Inc. for years ending December 31st, noting that rounding differences may occur due to whole numbers being used in some line items.

Compliance Filing - 2007 Rate Case
Compliance Filing - 2007 Rate Case 2 (1) Proposed Rates Test Year (2) Compliance Rates Test Year (3) Forecast Forecast 2007 2007 Change 3 Fuel By Type 4 Solid Fuel $276.8 $275.8 ($1.0) 5 Natural gas 98.0 94.8 ($3.2) 6 Bunker C 97.0 86.8 ($...

AI summary The document presents a compliance filing related to the 2007 rate case, showing proposed and compliance rates for various fuel types and purchased power, along with changes in costs and revenues. It includes details on fuel costs, purchased power, and net costs, as well as total system requirements and fuel costs per MWH.

Table 16
Table 16 Compliance Filing - 2007 Rate Case Millions of dollars (1) Compliance Forecast (2) Compliance Rates Test Year (3) (4) 2 2006 Forecast 2007 Average 2007 Reference 3= 4 Fuel Inventory 5 January $47.8 6 February 45.8 7 March 47.7 8 A...

AI summary Table 16 provides a compliance filing related to the 2007 rate case, including forecasted fuel inventory and materials inventory values across different months. It outlines financial data such as fuel costs and allowance for materials and supplies, with some rounding differences noted.

CLASSIFICATION OF OPERATING EXPENSES
CLASSIFICATION OF OPERATING EXPENSES (1) TOTAL COMPANY (2) DEMAND EXPENSES (3) ENERGY EXPENSES (4) CUSTOMER EXPENSES GENERATION FUNCTION ( 1) FUEL $431,429 $0 $431,429 $0 ( 2) PURCHASED POWER - FIXED 14,267 4,654 9,613 0 ( 3) PURCHASED POW...

AI summary The document presents a detailed breakdown of operating expenses categorized into total company, demand expenses, energy expenses, and customer expenses, with specific figures for various functions such as generation, transmission, and depreciation. It includes costs related to fuel, purchased power, operations and maintenance, depreciation, interest, taxes, and other revenues.

FOR THE YEAR ENDING DECEMBER 31, 2007
FOR THE YEAR ENDING DECEMBER 31, 2007 (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) EXTRA LI (10) (11) (12) ALLOCATION COMPANY DOMESTIC GENERAL GENERAL LARGE INDUSTRIAL INDUSTRIAL INDUSTRIAL INTERR 2 MUNICIPAL...

AI summary The document presents a table with various metrics related to demand, responsibility percentages, and energy generation and purchase figures for different categories, including small, general, and large industrial sectors, as well as municipal and unmetered entities, for the year ending December 31, 2007.

57984Submission - Barrington Wind Energy Ltd. - Re: Late Filed Evidence 1 passage
Section 1
" NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE.l\1ATTER OF: The· Public Utilities Act, R.S.N.S. 1989, C·. 380, as amended -and- IN THE .MATTER OF: An Application by Nova Scotia Power Incorporated, and a Hearing for Approval of Certain Revis...

AI summary BWEL supports Mr. George Cooper's letter opposing the admission of evidence by NSPI, citing concerns about due process and the potential introduction of a Fuel Adjustment Mechanism. They argue that the evidence raises issues outside the ELIIR2 proceedings and challenges intervenors' ability to participate effectively.

57985NSPI Correspondence - Re: 2007 Rate Application proceedings [and attachments] 5 passages
The Black & Veatch Work
The Black & Veatch Work In the 2006 Rate Case Decision the Board directed NSPI to work with Liberty to respond to certain fuel procurement recommendations made by Liberty. Recommendation #2 states: ''NSPI should develop a more comprehensiv...

AI summary In the 2006 Rate Case Decision, the Board directed NSPI to develop comprehensive fuel hedging policies with Liberty's input. NSPI retained Black & Veatch for this task, which was to be completed by the end of 2006. The work was intended to refine policies, not produce a report for the rate case. NSPI argues this does not justify delaying the hearing for a general rate increase.

Question IR-11: Reference Page 11, lines 7-8
Question IR-11: Reference Page 11, lines 7-8 - a. Provide the Terms of Reference for the Black and Veach work. - b. What is the expected completion date of this work and when will the results be incorporated in the Fuel Procurement Policie...

AI summary The question asks for the Terms of Reference for the Black and Veatch work, the expected completion date, when the results will be incorporated into the Fuel Procurement Policies and Procedures Manual, and whether Liberty will be given an opportunity to comment on the results.

Response IR-11:
Response IR-11: - a. Please refer to Attachment 1. - b. The work is scheduled to be complete by the end of 2006. The updating of the Fuel Procurement Policies and Procedures Manual is scheduled for early 2007. - c. Yes.

AI summary The response to IR-11 indicates that the work is scheduled to be completed by the end of 2006, with the updating of the Fuel Procurement Policies and Procedures Manual planned for early 2007. The response also confirms a yes to an unspecified question.

OBJECTIVE
OBJECTIVE To further refine NSPI's fuel hedging policies, procedures, governance and documentation, to ensure that they are consistent with industry standards and best practices.

AI summary The objective is to refine NSPI's fuel hedging policies, procedures, governance, and documentation to align with industry standards and best practices.

SCOPE
SCOPE The consultant will address the missing elements in the NSPI hedging program outlined by the UARB in its decision. The missing elements listed are: - A clear, concise definition of hedging objectives - Statement of specific goals in...

AI summary The consultant is tasked with addressing missing elements in NSPI's hedging program as outlined by the UARB. Key missing elements include definitions of hedging objectives, permissible techniques, reporting requirements, and control mechanisms.

57987Letter - SEB - Re: Late Filed Evidence 1 passage
1. O'SHEASY EVIDENCE
1. O'SHEASY EVIDENCE SEB is strongly of the view that this evidence should not be admitted as part of the record in this proceeding. To the extent that any part of this evidence is allowed to form part of the record, SEB requests that the...

AI summary SEB opposes the admission of O'Sheasy evidence, arguing it was not filed in accordance with the Board's schedule and should not be included in the proceeding. The evidence addresses three topics related to the 2P-RTP: the flat customer base line, incremental export benefit credit, and marginal pricing mechanism.

58003Participant responses to Preliminary Issues List for P-886 3 passages
Nancy McNeil - CME Submission re Preliminary Issues List P-886
de privilege. Si vous avez re~u ce courriel par erreur, veuillez nous aviser et eliminer ce courriel, ainsi que les pieces jointes, de votre systeme informatique et de vos dossiers. October 27, 2006 Ms. Nancy McNeil Regulatory Affairs Offi...

AI summary The Canadian Manufacturers and Exporters (Nova Scotia Division) submits comments on the Preliminary Issues List for the NSUARB - NSPI - P-886 proceeding. The CME suggests that all affiliate transactions affecting expenses or revenue should be reviewed and that fuel cost considerations, including generation deployment timing, should be examined.

General
General NSPI supports the schedule put forth by the Board, and notes that it can be achieved through a focus on the material issues which have caused this application to be filed and which affect the 2007 test year. A focused Issues List w...

AI summary NSPI supports the Board's proposed schedule and suggests narrowing the issues list to avoid duplication of recent reviews. It highlights that many operational aspects have already been or will be reviewed, such as fuel-related directives, affiliate audits, and demand-side management plans.

General
General NSPI supports the schedule put forth by the Board, and notes that it can be achieved through a focus on the material issues which have caused this application to be filed and which affect the 2007 test year. A focused Issues List w...

AI summary NSPI supports the Board's proposed schedule and suggests narrowing the issues list to avoid duplication of recent reviews. The Company highlights ongoing and completed reviews by the Board and third-party consultants, such as Liberty and Accenture, and notes that many aspects of its operations have already been addressed.

58139Closing Submission - Affordable Energy Coalition 1 passage
Fuel Adjustment Mechanism
Fuel Adjustment Mechanism - 7. The Affordable Energy Coalition respectfully requests that the Board not agree with the development of a Fuel Adjustment Mechanism (F AM), in principle, as a part of the Settlement Agreement. The AEC has conc...

AI summary The Affordable Energy Coalition opposes the development of a Fuel Adjustment Mechanism (FAM) as part of the Settlement Agreement, arguing it would reduce regulatory oversight and prioritize FAM over pressing issues like constitutional and human rights concerns, as well as Demand Side Management (DSM) initiatives.

58140Final Submission - Ecology Action Centre 5 passages
Overview
Overview - 1. The rate application before the Utility and Review Board (the Board) is based on an assumption that the use of fossil fuels, and the costs associated with those fuels, is sufficient evidence upon which the Board can rely in m...

AI summary The rate application by Nova Scotia Power Inc (NSPI) is based on fossil fuel costs, but the Ecology Action Centre (EAC) argues that a rate increase is not justified as more cost-effective and less volatile alternatives exist. EAC urges the Board to prioritize energy efficiency and renewable energy and to reconsider its role in addressing social and environmental costs.

PART ll- ISSUES
PART ll- ISSUES - 1. Is NSPI Undertaking Reasonable and Prudent Expenses Given Opportunities for Demand Side Management? - 2. Is NSPI Undertaking Reasonable and Prudent Expenses Given Opportunities for Renewable Energy Generation? - 3. Is...

AI summary The document outlines seven key issues under Part ll of the proceeding, focusing on NSPI's expenses, demand-side management, renewable energy, prudence, social and environmental considerations, fuel adjustment mechanisms, public participation, and cost awards for the EAC.

Is NSPI Undertaking Reasonable and Prudent Expenses Given Opportunities for Renewable Energy Generation?
Is NSPI Undertaking Reasonable and Prudent Expenses Given Opportunities for Renewable Energy Generation? - 22. NSPI's strategy of incurring fuel expenses must also be viewed in light of their capital investment decisions. Since 1979 the ov...

AI summary The document argues that NSPI has been complicit in prioritizing capital expenditures that involve fuel costs over investments in renewable energy, which could reduce vulnerability to fuel price volatility. It calls for a comprehensive study on Nova Scotia's electricity network's capacity to support distributed renewable energy generators, citing the Public Utilities Act.

expediently in cooperation with NSPI, The Government of Nova Scotia and Stakeholders.
expediently in cooperation with NSPI, The Government of Nova Scotia and Stakeholders. - 28. In addition to uncertainty regarding Nova Scotia's ability to maximize renewable energy generation in the province, it remains uncertain if renewab...

AI summary The EAC highlights concerns about Nova Scotia's renewable energy procurement process, citing past project setbacks and volatility risks. It suggests adopting a feed-in law mechanism to ensure renewable energy development and calls for a re-evaluation of procurement policies in consultation with stakeholders. The EAC also argues that considering fuel costs without addressing related capital expenditures is not a rational approach to governing the electricity system.

Should a Fuel Adjustment Mechanism Process be initiated?
Should a Fuel Adjustment Mechanism Process be initiated? - 42. Before the hearing of NSPI's Application a settlement agreement was reached among the parties that signed the confidentiality agreement and the Company. Given that the EAC has...

AI summary The Ecology Action Centre (EAC) opposes the initiation of a Fuel Adjustment Mechanism (FAM) process, arguing that it may prioritize the interests of a select group of interveners over the public and other stakeholders. The EAC calls for the Board to first address issues such as the impact of rate increases on low-income customers, energy efficiency investments, and renewable energy integration before considering a FAM.

58141Closing Submission - NDP - Re: Proposed Settlement Agreement 3 passages
Overview
approval process. We suggest that decision-making instruments, including technical conferences and settlement conferences, should be open to all intervenors and not just confidential intervenors. .. Increases in the residential, commercial...

AI summary The NDP Caucus criticizes the opacity of the rate approval process and the use of settlement conferences that exclude public participation. They express concern over the proposed Fuel Adjustment Mechanism (FAM) being agreed upon without proper public scrutiny and call for greater transparency and accountability in regulatory decisions.

Section E: Fuel Costs/ Fuel Adjustment Mechanism (FAM)
Section E: Fuel Costs/ Fuel Adjustment Mechanism (FAM) Ongoing volatility in world fuel markets is becoming an increasingly important factor in any application for an increase in electricity rates. The effective management of the impact of...

AI summary The NDP Caucus highlights NSPI's improved performance in managing fuel cost uncertainties, attributing it to ongoing Board oversight. They recommend that if a hearing on the FAM proceeds, it should not be truncated by pre-hearing settlements and that NSPI must demonstrate expertise in the international coal market before implementing a FAM.

Section G: Demand Side Management
Section G: Demand Side Management One of the ways in which NSPI can assist all its customers, but in particular its low income customers, is through the roll out of a comprehensive demand side management program. So why the continued delay...

AI summary The document highlights the delay in implementing a comprehensive demand side management (DSM) program by NSPI, particularly for low-income customers. The Board's 2006 decision disallowed a $5 million DSM expense and instead required NSPI to develop a plan, delaying the program. The NDP recommends expediting the Integrated Resource Planning (IRP) process and initiating DSM before Fuel Adjustment Mechanism hearings.

58142Closing Submission - Liberal Caucus [NS] - Re: 2007 Rate Hearing 1 passage
Section 1
January 26, 2007 Ms. Nancy McNeil Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 3rd Floor, Summit Place 1601 Lower Water Street Halifax, Nova Scotia B3J 3P6 Dear Ms. McNeil: Re: Utility and Review Board Hearing for...

AI summary The Liberal Caucus submits a closing intervention in NSPI's 2007 Rate Application, expressing concern over rising electricity rates but acknowledging a lower-than-expected rate increase. The settlement includes a Fuel Adjustment Mechanism (FAM), with a hearing scheduled to discuss its structure by July 15, 2007.

58143Closing Submission - Nova Scotia Department of Energy (NSDOE) 1 passage
HER MAJESTY THE QUEEN IN RIGHT OF THE PROVINCE OF NOVA SCOTIA AS REPRESENTED BY THE DEPARTMENT OF ENERGY
HER MAJESTY THE QUEEN IN RIGHT OF THE PROVINCE OF NOVA SCOTIA AS REPRESENTED BY THE DEPARTMENT OF ENERGY Stephen T. McGrath Nova Scotia Department of Justice 400-5151 Terminal Road P.O. Box 7 Halifax, NS B3J 2L6 (902) 424-6288 Phone: Facsi...

AI summary The Nova Scotia Department of Energy commends the agreement reached by NSPI and stakeholders regarding rate setting effective April 1, 2007, but expresses concern that NSPI's focus on a fuel adjustment mechanism may delay ongoing integrated resource planning and demand side management processes.

58241Comments Preliminary Issues List - Canadian Manufacturers & Exporters (CME) 1 passage
Section 1
October 27, 2006 Ms. Nancy McNeil Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 3 rd Floor, 1601 Lower Water Street PO Box 1692, Unit "M" Halifax, Nova Scotia B3J 3S3 Dear Ms. McNeil, Re: NSUARB - NSPI - P-886 - Pre...

AI summary The Canadian Manufacturers and Exporters (Nova Scotia Division) submits comments on the Preliminary Issues List, suggesting that all affiliate transactions affecting expenses or revenue should be considered, and that fuel costs, renewable energy exploitation, and related resource planning should be reviewed. These issues are deemed important for the Board's consideration.

58244Comments on Preliminary Issues List - NSPI 2 passages
General
ng from recent rate cases; and - ROE, capital structure and return on rate base were fully reviewed and decided effective May 19, 2005, and re-confirmed in the most recent decision on March 10, 2006. The Preliminary Issues List includes (i...

AI summary The document discusses the review of ROE, capital structure, and return on rate base, which were previously decided in 2005 and reconfirmed in 2006. NSPI notes that fuel and OM&G costs have been reviewed multiple times since 2000 and suggests that a separate review back to 2000 is unnecessary. The Board has acknowledged NSPI's improvements in fuel procurement and clarified that past imprudence will not affect the 2006 test year.

Specific Proposed Issues
Specific Proposed Issues NSPI offers the following comments in respect of the specific issues contained in the proposed list: - 1. Fuel Related Issues Each of the proposed items in this topic arise in the NSPI Application Evidence. NSPI no...

AI summary NSPI responds to the proposed issues in the rate proceeding, supporting most items on the list while requesting clarification on certain topics. It notes that affiliate transactions are under review by Liberty, and that some deferred items previously decided by the Board should not be reconsidered. NSPI also highlights that the DSM and IRP are being addressed in another regulatory process and that 2006 financial results will not be publicly available during the hearing due to a securities blackout period.

58245Comments on Preliminary Issues List - Stora Enso/ Bowater (SEB) 1 passage
Re: Submissions Regarding Cost of Service Methodology Hearing
Re: Submissions Regarding Cost of Service Methodology Hearing In its Decision dated September 28, 2006 relating to a rate to replace the ELIIR, the Board at paragraph 188 stated that it was prepared to consider whether a Hearing into NSPI'...

AI summary The document discusses the need for a Hearing into NSPI's Cost of Service (COS) methodology, citing the outdated nature of the methodology and significant changes in the energy system and fuel mix over the past decade, including new load additions, fuel diversification, and increased fuel price volatility.

86470Board Memo - Re: Rate Hearing Future Filing Requirements 1 passage
Section 4
Item 1: Parties are requested to inform the Board Clerk of their intention to be a participant in this process. The Board Clerk's address is: Nancy McNeil Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 3rd Floor, 160...

AI summary The document outlines procedures for participation in a regulatory proceeding, including contacting the Board Clerk and submitting comments. It also discusses the need for future filing requirements related to NSPI's fuel budget, referencing specific information requests from prior cases.

86471Letter - Re: Future Filing Requirements - Strawman Proposal 2 passages
Important Considerations
Important Considerations There are four issues that have not been addressed in the Strawman Proposal, which in the view of NSPI are integral considerations in this process. NSPI seeks the Board's direction on these items. The first conside...

AI summary NSPI highlights four unresolved issues in the Strawman Proposal, including the impact of a Fuel Adjustment Mechanism on FFRs, the Board's role in electronic information storage, the number of Information Requests rounds, and the importance of an Issues List in GRAs. NSPI requests the Board's guidance on these matters.

. .
. . # Proposed Filin2 Requirement Clarification OR-8 Provide monthly data for the last two years for NSPI's sales of natural gas. Also of provide summaries associated the contracts that were in place over the last two years. NSPI will prov...

AI summary The document outlines proposed filing requirements related to fuel costs and gas sales for NSPI, including the need for monthly data on natural gas sales and forecasts of fuel burn levels. NSPI provides clarifications, suggesting re-categorization and the use of historical data for standard filings. The discussion involves the Utility and Review Board and its consultant, The Liberty Consulting Group.

86472Submission - Re: Future Filing Requirements and comments on Board Draft Strawman 4 passages
OP - Organization Profile
OP - Organization Profile - 1. Latest regulated annual reports of NSPI and EMERA - 2. Current organization chart ofNSPI showing all positions reporting no further than two levels down from the President and CEO, including a full organizati...

AI summary The document outlines a list of requested information for a regulatory proceeding, including organizational profiles, financial documents, and operational data related to NSPI and EMERA. It includes details on assets, reliability statistics, customer information, and emissions targets.

OE - Operating expenses
OE - Operating expenses - 1. Fuel, purchased power costs (These items may need to be revised depending on the resolution of the FAM issue, but may be required in any event to establish base fuel costs prior to establishment of a FAM. and i...

AI summary The document outlines requirements for providing detailed fuel and purchased power cost forecasts, including historical data formats, fuel mix changes, and emissions projections for various years, as part of the operating expenses section.

OE- Operating expenses, 1 cont'd:
OE- Operating expenses, 1 cont'd: - c. Fuel costs per MWh for a historic period, e.g. five years. Provide the substantiating detail for the fuel costs for each of these years; such detail should include all of the individual fuel cost comp...

AI summary The text outlines detailed requirements for providing fuel cost data, procurement history, contracts, and transportation information for Nova Scotia Power Inc. (NSPI), including specific components of fuel costs, contract statuses, and supporting calculations for the test year forecast.

OE Operatieg E~cpeese9, 1 eont'd
OE Operatieg E~cpeese9, 1 eont'd - k. For each fuel, describe (qualitatively and quantitively) any hedging programs in place, current year hedge positions, and any hedging programs planned for the test year, as in response to Liberty IR-26...

AI summary The document outlines various requests for information related to fuel management, financial expenses, and regulatory compliance, including hedging programs, fuel contracts, transportation costs, insurance, salaries, pensions, and tax calculations. These requests are part of a regulatory proceeding and are structured as responses to specific inquiries.

86475Board Letter - Re: NSPI Future Filing Requirements - Strawman Proposal - April 10, 2007 4 passages
OP - Organization Profile
OP - Organization Profile - 1. Latest regulated annual reports of NSPI and EMERA - 2. Current organization chart of NSPI showing all positions reporting no further than two levels down from the President and CEO, including a full organizat...

AI summary This document outlines a list of information requests related to Nova Scotia Power Inc. (NSPI) and EMERA, covering financial reports, organizational structure, asset details, maintenance schedules, fuel specifications, reliability statistics, customer data, and emissions compliance.

OE - Operating expenses
OE - Operating expenses - 1. Fuel, purchased power costs (These items may need to be revised depending on the resolution of the FAM issue, but may be required in any event to establish base fuel costs prior to establishment of a FAM. and i...

AI summary The document discusses operating expenses, specifically fuel and purchased power costs, requiring detailed forecasts and projections for various years, including fuel types, emissions, and costs. These data are needed for rate cases and may be influenced by the resolution of the FAM issue.

OE- Operating expenses, 1 cont'd:
OE- Operating expenses, 1 cont'd: - c. Fuel costs per MWh for a historic period, e.g. five years. Provide the substantiating detail for the fuel costs for each of these years; such detail should include all of the individual fuel cost comp...

AI summary The text outlines detailed requirements for disclosing fuel costs, procurement history, contract status, and transportation costs for NSPI. It requests data on fuel costs per MWh, fuel procurement audits, contract summaries, and transportation costs for various fuels over the next five years.

OE- Operating Expenses, 1 cont'd
OE- Operating Expenses, 1 cont'd - k. For each fuel, describe (qualitatively and quantitively) any hedging programs in place, current year hedge positions, and any hedging programs planned for the test year - 1. Forecasted Prices Calculati...

AI summary This section of the regulatory proceeding document outlines various requirements related to operating expenses, including fuel hedging programs, fuel supply and transportation data, affiliate transactions, insurance, salaries, pensions, customer sales, billing, and tax calculations. It requests detailed information on multiple aspects of operational and financial management.

86476Letter - Re: Standard Filing Requirements 3 passages
1. Implications of a FAM Proceeding
1. Implications of a FAM Proceeding Dr. Stutz's suggestion to standardize filing requirements was made prior to any discussion and agreement in principle that the Board should approve a FAM. The FAM process is ongoing and during 2007 the B...

AI summary The text discusses the implications of a FAM (Fuel Adjustment Mechanism) proceeding, including the standardization of filing requirements, the impact on general rate applications, and the resolution of past concerns about fuel cost explanations. The FAM aims to increase transparency and regularity in fuel cost reporting, potentially eliminating the need for fuel matters to be addressed in general rate applications.

5. Electronic Data Access
5. Electronic Data Access In the 2007 Rate Case, NSPI has sought to increase the efficient use of electronic filing. All Intervenors adopted a similar filing method. It allowed all participants instant access to the filed materials regardl...

AI summary NSPI advocates for the adoption of electronic filing as a standard requirement for general rate applications, citing its use in other jurisdictions and benefits for access and efficiency. NSPI also highlights the importance of addressing several key matters, including the Fuel Adjustment Mechanism (FAM), confidentiality, and the use of an issues list in establishing standard filing requirements.

NSPI - Standard Filing Requirements Comment on Specific Board Staff and SEB Requests March 26, 2007
NSPI - Standard Filing Requirements Comment on Specific Board Staff and SEB Requests March 26, 2007 # Reouested FiDne Reoulrement (UARB) NSPI Comment UIO Provide the current forecast of fuel burn levels for each generating station for the...

AI summary NSPI responds to the UARB's requests regarding fuel burn forecasts and hedging programs. NSPI explains that providing detailed fuel forecasts would require extensive modeling and assumptions, and that this may be unnecessary with the implementation of the Fuel Adjustment Mechanism (FAM). Regarding hedging programs, NSPI notes that historical data is irrelevant for test year costs and that current efforts with Liberty may affect the need for this information.

86477Submission - Re: Rate Hearing Future Filing Requirements 9 passages
OUTLINE- STANDARD FILING REQUIREMENT TOPICS
OUTLINE- STANDARD FILING REQUIREMENT TOPICS - I. Detailed Summary of Proposed Adjustments to Revenue Requirement - II. Fuel-Related Information - (a) Detailed Fuel Forecast - (b) Fuel Quality and Price Information Actual v. Compliance v. F...

AI summary The document outlines standard filing requirements for a regulatory proceeding, focusing on detailed revenue requirement adjustments and fuel-related information, including forecasts, procurement, transportation, and emissions.

(a) Detailed Fuel Forecast
(a) Detailed Fuel Forecast 3. In order to properly evaluate NSPI fuel-related costs, Board Staff, Consultants, and Intervenors have previously filed a host of Information Requests for further detail on the sourcing assumptions for the fuel...

AI summary The document discusses the detailed fuel forecast provided by NSPI in response to various Information Requests, including sourcing assumptions, forward price curves, and fuel costs. SEB submits that NSPI should be required to provide a more detailed fuel forecast for the General Rate Case, including segregation of solid fuel costs and clear identification of forward price curve data dates.

(c) Fuel Quantity Committed or Contracted in Test Period
(c) Fuel Quantity Committed or Contracted in Test Period 5. When NSPI files a General Rate Case that relies on a forecast test year, a significant element of the fuel to be consumed in the test period has already been committed or contract...

AI summary The document discusses the need for Nova Scotia Power Inc. (NSPI) to disclose detailed fuel commitment and contract information for the test period in its General Rate Case. This includes quantity, type of commitment, delivery dates, and pricing, as requested by SEB in P-886. The information is seen as crucial for examining NSPI's hedging strategies.

(d) Solid Fuel Procurement Documentation
(d) Solid Fuel Procurement Documentation 6. In considering the breakdown of solid fuel costs for the test period, as well as the prudency of the contracts themselves, Board Staff, Consultants, and Intervenors must be able to examine all in...

AI summary The document discusses the need for Nova Scotia Power Inc. (NSPI) to provide detailed procurement documentation related to solid fuel contracts, including contracts, forecasts, audits, and internal communications, to ensure the prudency of its fuel procurement decisions during the test period.

(h) Fuel for Resale Information (including Contract details, RFPs, etc.)
(h) Fuel for Resale Information (including Contract details, RFPs, etc.) 10. In P-886, UARB IR-22 asked NSPI to "provide a table showing the calculation of the cost and recoveries for Fuel for Resale in the years 2005, 2006 forecast and co...

AI summary The document outlines various requests from intervenors regarding Fuel for Resale information, including cost calculations, contract details, and RFPs. SEB and Liberty have submitted requests for detailed data and documents related to natural gas sales and contracts. SEB also submits that NSPI should file detailed calculations on gas costs and recoveries, along with related documents.

12. In P-886, SEB IR-42 asked NSPI:
12. In P-886, SEB IR-42 asked NSPI: For each fossil fuel generating unit in NSPI's anticipated 2007 generating fleet (e.g. Tufts Cove Units 1 through 5, Point Aconi, etc.) please provide the following data: - (a) Book Value as of December...

AI summary SEB IR-42 requested NSPI to provide detailed data on fossil fuel generating units in its 2007 generating fleet, including book value, environmental book value, generation data, and fuel burn for 2006 and 2007.

Also, SEB IR-44 requested:
Also, SEB IR-44 requested: For each plant that can burn more than one type of fuel (e.g. gas and HFO, coal and petcoke ), please provide: - (a) Name of Plant. - (b) The heat rate (BTU per kWh) for each type of fuel at a 50% loading. - (c)...

AI summary SEB IR-44 requested detailed information on fuel burn, heat rates, and SO2 emissions for each plant capable of burning multiple fuel types. SEB argues that this data is necessary to evaluate the efficiency of NSPI's operations and ensure consistency between forecasted and past performance.

(n) Emissions Reduction Information
(n) Emissions Reduction Information 16. Emissions targets are an increasingly important component of NSPI's fuel planning and decision-making. In P-886, Liberty IR-16 asked for a summary of the current legislative requirements for reductio...

AI summary The text discusses emissions reduction requirements and force majeure issues in fuel contracts. SEB submits that NSPI should file summaries of legislative requirements and force majeure provisions affecting fuel costs. This includes details on past events, replacement fuel, and economic impacts.

SUMMARY OF SEB RECOMMENDATIONS
SUMMARY OF SEB RECOMMENDATIONS - 1. SEB submits: that NSPI list all the proposed changes to its revenue requirement by individual component (whether positive or negative) at the outset of its evidence, in a manner similar to the response t...

AI summary SEB recommends that NSPI provide detailed and transparent information on its revenue requirement changes, fuel mix, pricing differentials, and fuel forecasts in its General Rate Case filings. This includes providing working calculations, detailed fuel forecasts, and monthly solid fuel costs for various years and fuel types.

86478Letter - Re: Rate Hearing - Future Filing Requirements 1 passage
Section 2
n a preliminary hearing on December 7, 2006 and an updated filing on January 8, 2007 (reference P-886 - letter from UARB dated December 8, 2006 regarding pre-hearing conference held December 7, 2006). The Nova Scotia Department of Energy s...

AI summary The Nova Scotia Department of Energy argues that updated fuel forecast and contractual commitment information from NSPI is necessary for setting accurate test year costs. This information should be provided shortly before a rate hearing.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →