8 Figure 1: Usage and Revenues of AAR Classes in 2026 Test Year of the 2026 GRA. p. p. 7
8 Figure 1: Usage and Revenues of AAR Classes in 2026 Test Year of the 2026 GRA. Rate Usage Revenue (millions of $s) Sales (GWh) System Coincident Peak (MWs) Fuel Non-Fuel Total Fuel as % of Total Cost AAR Revenue as % of Total System Cost...

AI summary The document presents a table illustrating the usage and revenue data for various Anchor Anchor Rate (AAR) classes during the 2026 test year of the 2026 General Rate Application (GRA). It breaks down sales in GWh, System Coincident Peak in MWs, and total revenues (split into fuel and non-fuel components). Key metrics include fuel as a percentage of total cost and AAR revenue as a percentage of total system costs across different rate types such as GRLF, 1P-RTP, Shore Power, BUTU, EBS, and SS/RTT.

2.2 Board Directed Sensitivity Analyses p. p. 12
2.2 Board Directed Sensitivity Analyses 1415 In accordance with the Board's prior AAR directives, NS Power has considered the following sensitivities on the marginal cost: 1617 18 (1) Forward commodity market returns volatility of plus 1.5...

AI summary NS Power has conducted sensitivity analyses on marginal costs in response to the Board's Anchor Anchor Rate (AAR) directives. Specifically, the analysis evaluates the impact of forward commodity market returns volatility, applying a plus 1.5 standard deviation (+1.5 σ) scenario to various fuel prices, including AECO, AGT, HFO, API2, and Mass Hub (Off-Peak and 20 On-Peak). The analysis utilizes the 2027 PLEXOS AAR F&PP model, updated with system assumptions and commodity pricing as of September 17, 2026.

26 Figure 3 : LF Tariff Charges in Cents per kWh p. p. 15
26 Figure 3 : LF Tariff Charges in Cents per kWh 2026 2027 Variance Fuel Cost 6.736 6.254 (0.482) Additional O&M costs 0.500 0.500 0.000 Total 7.236 6.754 (0.482) 27

AI summary The document presents a comparison of Load Following (LF) tariff charges in cents per kWh for the years 2026 and 2027. It details the components of these charges, specifically highlighting a decrease in Fuel Cost from 6.736 to 6.254 cents per kWh, while Additional O&M costs remain constant at 0.500 cents per kWh, resulting in a total variance of -0.482 cents per kWh.

1 5.0 SHORE POWER TARIFF p. pp. 17-18
1 5.0 SHORE POWER TARIFF 2 - 3 Service under the SP Tariff is a seasonal priority interruptible service, differentiated by two voltage - 4 levels: transmission and primary distribution. It is available to seaports in Nova Scotia from April...

AI summary The document describes the Shore Power (SP) Tariff, a seasonal priority interruptible service available to Nova Scotia seaports from April 1 to November 30. The tariff is differentiated by transmission and primary distribution voltage levels. The proposed rates for 2027 reflect a decrease compared to 2026 rates, primarily driven by a reduction in the line-loss adjusted Fuel Cost component, which offsets an increase in the Fixed Cost Adder component.

22 Figure 5: Shore Power Tariff Charges by Voltage and Cost Components in Cents per kWh p. p. 18
22 Figure 5: Shore Power Tariff Charges by Voltage and Cost Components in Cents per kWh 2026 2027 Variance Transmission Fuel Cost 6.900 6.406 (0.494) Fixed Cost Adder 2.507 2.576 0.069 Total 9.408 8.983 (0.425) Distribution Fuel Cost 7.062...

AI summary The document presents a data table outlining the Shore Power (SP) tariff charges for the years 2026 and 2027, broken down by transmission and distribution categories. It details the specific costs for fuel and fixed cost adders per kWh. The data shows a projected decrease in total fuel costs for both transmission and distribution between 2026 and 2027, while fixed cost adders are expected to see slight increases.

2027 Annually Adjusted Rates Application REDACTED p. p. 27
2027 Annually Adjusted Rates Application REDACTED 1 (1) Annually adjusted average annual marginal fuel cost. 2 3 (2) Fixed Cost Adder reflective of fixed energy-related generation costs updated concurrent 4 with changes in base cost rates...

AI summary The document snippet discusses the 2027 Annually Adjusted Rates Application, specifically focusing on the average annual marginal fuel cost and the Fixed Cost Adder. It notes that the Fixed Cost Adder is updated concurrently with base cost rate changes from General Rate Applications (GRAs). Additionally, it addresses the Energy Credit applied to spilled energy, noting that its rate for 2027 is consistent with the Fuel Cost component used under the Energy Charge, with specific rates and credits compared to 2026 provided in the application's figures.

10 Figure 8: Energy Balancing Service Tariff Charges p. p. 27
10 Figure 8: Energy Balancing Service Tariff Charges 2026 2027 Variance Administration Charge ($/LRS/month) $414.63 $67,734.00 67,319.37 Energy Charge (cents per kWh) Fuel Cost (cents per kWh) 6.736 6.254 (0.482) Fixed Cost Adder (cents pe...

AI summary The document presents a comparative table of Energy Balancing Service Tariff Charges for the years 2026 and 2027. It details the Administration Charge per Load Resource System (LRS) month and breaks down the Total Energy Charge into Fuel Cost, Fixed Cost Adder, and Energy Credit components. The data shows a projected decrease in the total energy charge from 8.891 cents per kWh in 2026 to 8.507 cents per kWh in 2027.

15 7.5.1.3 Annual Energy Cost Adjustment p. p. 30
15 7.5.1.3 Annual Energy Cost Adjustment 16 - 17 The Annual Energy Cost Adjustment is designed to ensure that FAM customers are not affected - 18 by changes in system fuel costs as a result of a reduction in NS Power's generation due to th...

AI summary The Annual Energy Cost Adjustment is a mechanism designed to protect Fuel Adjustment Mechanism (FAM) customers from fuel cost fluctuations resulting from the migration of bundled service customers to the Real-Time (RtR) market. The adjustment acts as a credit or debit depending on whether the average avoided cost of departing load exceeds the average system fuel cost paid by FAM customers. For 2026 and 2027, the adjustment resulted in debits of 2.171 cents/kWh and 3.812 cents/kWh, respectively, due to specific marginal fuel cost forecasts relative to average system unit fuel costs.

A high-level list of updates for the 2026 Q3 fuel and purchased power model include: p. p. 37
A high-level list of updates for the 2026 Q3 fuel and purchased power model include: Update Update Description number 1. Generation maintenance scheduled (GMS). 2. Fuel and power prices. 3. Coal blends, restrictions, emissions parameters,...

AI summary The document outlines high-level updates for the 2026 Q3 fuel and purchased power model. Key updates include generation maintenance scheduling, fuel and power pricing, coal blend parameters, and updated SO2 emission limits. It also notes specific load and energy schedule changes for Port Hawkesbury Paper, Maritime Link (ML) surplus and re-delivery energy, and New Brunswick (NB) market energy. Additionally, the 2027 AAR Appendix A4 has been filed.

ENERGY CHARGE p. p. 37
ENERGY CHARGE Energy charges will vary by voltage level of the point of delivery and will be made up of two components. - (1) Annually adjusted fuel cost component which shall be the Company's forecast average annual marginal energy cost a...

AI summary The document describes the structure of energy charges, which vary based on the voltage level of the delivery point. These charges consist of two components, the first of which is an annually adjusted fuel cost component. This component is based on the Company's forecast average annual marginal energy cost, as approved for the GR&LF tariff, and is further adjusted to account for line losses at the specific delivery voltage level.

- (2) A fixed cost adder adjusted concurrent with changes in base cost rates coming into effect as a result of a General Rate Case application. p. p. 37
- (2) A fixed cost adder adjusted concurrent with changes in base cost rates coming into effect as a result of a General Rate Case application. Base Energy Charge Components Transmission Voltage of 69 kV or Higher (cents per kWh) Distribut...

AI summary The document provides a breakdown of the Base Energy Charge components for the 2027 Annual Adjustment Rate (AAR). It specifies the Fuel Cost and Fixed Cost Adder for two different transmission levels: 69 kV or higher and Distribution Voltage. The Fixed Cost Adder is explicitly noted as being adjusted concurrently with base cost rate changes resulting from a General Rate Case application.

DEMAND CHARGE p. p. 37
DEMAND CHARGE The demand charge for this service is made up of the following two components: - (1) Annually adjusted demand-related purchased power cost, coming into effect as a result of a Base Cost of Fuel, Fuel Adjustment Mechanism, or...

AI summary The document defines the composition of the demand charge for the specific service under review. It specifies that the demand charge consists of two components, the first of which is the annually adjusted demand-related purchased power cost. This component is influenced by various regulatory and market mechanisms, including the Base Cost of Fuel, the Fuel Adjustment Mechanism, and the General Rate Application.

ENERGY CHARGE p. p. 37
ENERGY CHARGE The energy charge is made up of the following two components: - (1) Annually adjusted energy-related purchased power and fuel cost, coming into effect as a result of a Base Cost of Fuel, Fuel Adjustment Mechanism or General R...

AI summary The text defines the composition of the energy charge, which consists of two primary components. The first component is the annually adjusted energy-related purchased power and fuel cost. This specific component is determined by the Base Cost of Fuel, the Fuel Adjustment Mechanism, or the General Rate Application.

- (2) Energy-related fixed generation cost, coming into effect as a result of a General Rate Application. p. p. 37
- (2) Energy-related fixed generation cost, coming into effect as a result of a General Rate Application. Energy Charge Components cents per kWh Energy-related Purchased Power and Fuel Cost 6.430 Energy-related Fixed Generation Cost 2.253...

AI summary The document presents a breakdown of energy charge components for a General Rate Application (GRA). It specifies that the total energy charge is 8.683 cents per kWh, which is composed of 6.430 cents per kWh for energy-related purchased power and fuel costs, and 2.253 cents per kWh for energy-related fixed generation costs. The text also introduces the Fuel Adjustment Mechanism (FAM) section.

Preamble p. p. 37
The FAM Actual Adjustment (AA) and Balance Adjustment (BA) charges or credits (in cents per kilowatt-hour) applicable to the Tariff for the current rate year, shown in the FAM Tariff, shall apply, in addition to the energy charge.

AI summary The text specifies the application of Fuel Adjustment Mechanism (FAM) charges or credits for the current rate year. These adjustments, categorized as Actual Adjustment (AA) and Balance Adjustment (BA) and measured in cents per kilowatt-hour, are to be applied in addition to the standard energy charge as defined in the FAM Tariff.

2027 AAR Appendix E2 has been filed electronically. p. p. 37
2027 AAR Appendix E2 has been filed electronically. Base Cost of Fuel Cost of Service Allocation of Fuel Expenses among Rate Classes FOR THE YEAR ENDING DECEMBER 31, 2027 COLUMN A В С D E F G н 1 J к . м N 0 Р Q R : з т U v w x Υ z AA AB ....

AI summary The document provides a data table for the 2027 Annual Adjustment Rate (AAR) regarding the allocation of fuel-related costs among different rate classes. It outlines cost allocation factors, including fuel costs for FAM purposes, purchased power, biomass, and Maritime Link costs. The table differentiates between demand-related and energy-related costs, adjustments for R/C ratios, and specific cost classifications like those from COS and CA IR-001.

Monthly Energy Allocators p. p. 37
Monthly Energy Allocators Rate Class Jan-27 Feb-27 Mar-27 Apr-27 May-27 Jun-27 Jul-27 Aug-27 Sep-27 Oct-27 Nov-27 Dec-27 Total kWh requirements ATL Domestic Total 703,364,192 658,966,637 621,859,856 477,310,981 386,030,904 312,074,064 340,...

AI summary The document provides a detailed monthly breakdown of energy requirements and fuel cost allocations for the year 2027. It lists specific kilowatt-hour (kWh) requirements across various rate classes, including Domestic, Small General, General, Large General, Small Industrial, Medium Industrial, Large Industrial, PHP, and Municipal. Additionally, it outlines the percentage of fuel costs allocated to each rate class on a monthly basis, showing how the domestic class remains the primary bearer of fuel costs, typically ranging between 43% and 60% of the total.

Section 216 p. p. 37
Rate Base Factors Applicable to Base Cost of Fuel Classification 48.191% 51.809%

AI summary The document provides a specific percentage breakdown for the rate base factors applicable to the base cost of fuel classification, split into two components of 48.191% and 51.809% respectively.

REDACTED 2027 AAR Appendix E3 Page 7 of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 37
REDACTED 2027 AAR Appendix E3 Page 7 of 8 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Category Plant Fuel Costs Jan-27 $57,665,346 Feb-27 $47,414,297 Mar-27 $37,738,955 Apr-27 $19,947,552 May-27 $17,809,534 Jun-27 $19,048,134 Jul-27 $26,25...

AI summary The document provides a detailed monthly breakdown of plant fuel costs for the year 2027. It includes specific figures for the Maritime Link (ML) NS Block and Surplus Total, alongside a categorized breakdown of Non-Wind Purchases. The data highlights monthly expenditures for biomass-related purchased power and regular biomass purchases, totaling over $45 million for the latter category in the annual projection.

ENERGY CHARGE p. p. 37
ENERGY CHARGE Energy charge for top-up service is made up of the following two components: - (1) Annually adjusted fuel cost component based on NS Power's incremental cost of serving the LRS' forecasted incremental top-up load.

AI summary The text defines the components of the energy charge for top-up service. It specifies that this charge is composed of two parts, the first of which is an annually adjusted fuel cost component. This component is determined by Nova Scotia Power's incremental cost of serving the forecasted incremental top-up load provided by Licensed Retail Suppliers (LRS).

APPLICABILITY p. p. 37
APPLICABILITY - (1) The RTT is applicable to the LRS, and is in addition to (and not in substitution of) any charges owing by the LRS to NS Power under the Open Access Transmission Tariff (OATT), the Standby Service Tariff, or the Energy B...

AI summary The text outlines the applicability and structure of the Renewable to Retail Market Transition Tariff (RTT). It specifies that the RTT is an additional charge for Licensed Retail Suppliers (LRS) and does not replace existing tariffs like the Open Access Transmission Tariff (OATT). The RTT includes provisions for savings credits based on forecasted NS Power savings from LRS electricity supply. Furthermore, it establishes an annual adjustment mechanism for Energy Charges based on the difference between average avoided costs and average system fuel costs.

ENERGY CHARGE p. p. 37
ENERGY CHARGE Energy charges will vary by voltage level of the point of delivery and will be made up of two components. - (1) Annually adjusted fuel cost component which shall be the Company's forecast average annual marginal energy cost a...

AI summary The document outlines the structure of energy charges, which vary based on the voltage level of the point of delivery. These charges consist of two components, the first of which is an annually adjusted fuel cost component. This component is based on the Company's forecast average annual marginal energy cost approved under the GR&LF tariff, further adjusted for line losses at the specific voltage level.

DEMAND CHARGE p. p. 37
DEMAND CHARGE The demand charge for this service is made up of the following two components: - (1) Annually adjusted demand-related purchased power cost, coming into effect as a result of a Base Cost of Fuel, Fuel Adjustment Mechanism, or...

AI summary The text defines the composition of the demand charge for the service, specifying that it consists of two components. The first component is the annually adjusted demand-related purchased power cost, which is influenced by factors such as the Base Cost of Fuel, the Fuel Adjustment Mechanism, or a General Rate Application.

ENERGY CHARGE p. p. 37
ENERGY CHARGE The energy charge is made up of the following two components: - (1) Annually adjusted energy-related purchased power and fuel cost, coming into effect as a result of a Base Cost of Fuel, Fuel Adjustment Mechanism or General R...

AI summary The document defines the composition of the energy charge, identifying it as consisting of two primary components. The first component is the annually adjusted energy-related purchased power and fuel cost, which is determined by the Base Cost of Fuel, the Fuel Adjustment Mechanism, or a General Rate Application.

ENERGY CHARGE p. p. 37
ENERGY CHARGE Energy charge for top-up service is made up of the following two components: - (1) Annually adjusted fuel cost component based on NS Power's incremental cost of serving the LRS' forecasted incremental top-up load.

AI summary The text defines the components of the energy charge for top-up service. It specifies that the charge consists of two parts, the first of which is an annually adjusted fuel cost component. This component is calculated based on the incremental cost incurred by Nova Scotia Power to serve the forecasted incremental top-up load of Licensed Retail Suppliers (LRS).

APPLICABILITY p. p. 37
APPLICABILITY - (1) The RTT is applicable to the LRS, and is in addition to (and not in substitution of) any charges owing by the LRS to NS Power under the Open Access Transmission Tariff (OATT), the Standby Service Tariff, or the Energy B...

AI summary This section outlines the applicability and structural components of the Renewable to Retail Market Transition Tariff (RTT). It specifies that the RTT applies to Load Resource Suppliers (LRS) in addition to existing tariffs like the OATT, Standby Service Tariff, and Energy Balancing Service Tariff. Key provisions include usage determinants, provisions for mitigating forecasted NS Power savings via credits, and an annual adjustment mechanism to align the Energy Charge with the difference between avoided costs and average system fuel costs.

104334Letter NSPI re: NS Power Annually Adjusted Rates for 2027 1 passage
Fuel-related information
Fuel-related information Consistent with the treatment of the fuel-related information under the Fuel Adjustment Mechanism (FAM), NS Power is requesting confidential treatment of the fuel-related information in this AAR Application: - Part...

AI summary Nova Scotia Power (NS Power) is requesting confidential treatment for fuel-related information within its Annually Adjusted Rates (AAR) application. This request aligns with the established Fuel Adjustment Mechanism (FAM) protocols. Additionally, the company seeks confidentiality for specific appendices containing customer-specific information, citing Board Regulatory Rule 12 and requesting the Board's approval of a Confidentiality Undertaking.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →