Topic:"Gas Utilities Act Gua" in M03097

Matter: CI# 28098 - P-128.07 - NSPI WO -  Authority to Overspend the Tufts Cove 6 Waste Heat Recovery Project - $8,699,864Approximate value for approval of $8.5 million.
2 passages 1 document

Gas Utilities Act Gua across all matters →

N-3Redacted NSPI (NSUARB) IR-1 to IR-20 7/16/2010 2 passages
GAS TURBINE PERFORMANCE DATA AT PART LOAD p. pp. 228-232
GAS TURBINE PERFORMANCE DATA AT PART LOAD Estimated Average Engine Performance NOT FOR GUARANTEE, REFER TO PROJECT F&ID FOR DESIGN GE Energy

AI summary This document provides estimated average performance data for a gas turbine at part load, specifically from GE Energy. The data is not a guarantee and should be referenced to the project F&ID for design purposes.

Performance By: JMCLEISH Project Info: p. p. 232
Performance By: JMCLEISH Project Info: Engine: LM6000 PC-SPRINT w/ FIGV at 0 Degrees Deck Info: G0125O - 8dx.scp Date: 03/03/2008 Generator: BDAX 290ERT 60Hz, 13.8kV, 0.9PF (14839) Fuel: Site Gas Fuel#900-773T, 20270 Btu/lb,LHV Version: 3....

AI summary The document provides performance data for an engine model LM6000 PC-SPRINT with FIGV at 0 degrees, including ambient conditions, engine inlet parameters, and pressure losses, under a specific project configuration and date.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →