Matter: Nova Scotia Power Inc. - Natural Gas Report - November 1, 2024 to October 31, 2025
8 passages 2 documents

Gas Utilities Act Gua across all matters →

N-1Report - Redacted 6 passages
NS Power Natural Gas Report for November 1, 2024 - October 31, 2025 REDACTED p. p. 6
NS Power Natural Gas Report for November 1, 2024 - October 31, 2025 REDACTED 1 13 Figure 8 – Saint John LNG Annual Winter Send-Out vs. New England Average First-of-the 14 Month (FOM) Price (US$/MMBtu) 14 15 Figure 9 – Saint John LNG Annual...

AI summary The document provides a natural gas report for NS Power covering the period from November 1, 2024, to October 31, 2025. It includes various figures comparing LNG send-out volumes, pricing, sources of supply, and gas usage on different systems, with some figures marked as confidential.

NS Power Natural Gas Report for November 1, 2024 - October 31, 2025 REDACTED p. pp. 9-10
NS Power Natural Gas Report for November 1, 2024 - October 31, 2025 REDACTED 1 185,000 MMBtu/day. NS Power's consumption accounted for approximately of total 2 consumption in the Maritimes for this period. Please refer to Figure 5 and Figu...

AI summary The document provides an overview of NS Power's natural gas consumption in the Maritimes from November 1, 2024, to October 31, 2025, highlighting figures and data sources. It references confidential attachments and external data sources such as Headwater and Enbridge.

NS Power Natural Gas Report for November 1, 2024 - October 31, 2025 REDACTED p. pp. 33-50
NS Power Natural Gas Report for November 1, 2024 - October 31, 2025 REDACTED 1 4.0 MARKET DEVELOPMENTS 2 3 4.1 Shale Gas development 4 5 There have been no developments relating to potential shale gas development within the region. 6 7 4.2...

AI summary The document discusses recent developments in the natural gas sector in Nova Scotia, including the abandonment of LNG export projects, no shale gas developments, and the decommissioning of the Alton Gas Storage Project. NS Power did not participate in a pipeline open season opportunity.

Preamble p. pp. 35-53
NS Power Natural Gas Report for November 1, 2024 - October 31, 2025 REDACTED Counterparty Master Agreement Effective Date 2 3 1 No longerset up as an active counterparty. However, agreement remainsin place and counterparty 4 can be re-esta...

AI summary The document outlines the status of various counterparty agreements related to NS Power's natural gas operations, noting that some agreements are inactive but remain in place, with potential for re-establishment based on circumstances.

1 F igure 36 – Canadian LNG Import and Proposed Export Facilities p. p. 50
1 F igure 36 – Canadian LNG Import and Proposed Export Facilities Project LNG Export Volumes, Million Tonnes per Annum (MTPA) LNG Export Volumes, Billion Cubic Feet per Day (Bcf/d) Export Licence - 40 years LNG Canada Phase 1 Kitimat, BC 1...

AI summary The text presents a table outlining Canadian LNG import and proposed export facilities, including project names, locations, and export volumes in both million tonnes per annum and billion cubic feet per day. The data includes projects such as LNG Canada Phase 1 and 2, Woodfibre LNG, Ksi Lisims LNG, and others.

NS Power Natural Gas Report for November 1, 2024 - October 31, 2025 REDACTED p. p. 57
NS Power Natural Gas Report for November 1, 2024 - October 31, 2025 REDACTED 1 2 3 4 5 6 7 8 9 10 11 12 Firm Pipeline Capacity 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 DATE FILED: December 24, 2025 Page 61 of 63

AI summary The document is a redacted NS Power Natural Gas Report covering the period from November 1, 2024, to October 31, 2025. It includes a table with some data related to firm pipeline capacity, though most entries are blank. The report was filed on December 24, 2025, and is page 61 of 63.

N-2NSPI (NSEB) RIR 1 to 11 - Redacted 2 passages
NON-CONFIDENTIAL p. p. 7
NON-CONFIDENTIAL Request IR-10: Reference page 40, lines 3 – 7 of the report, refers to the LDC Gas Forum Northeast – 2025, stating: An NS Power representative attended the Northeast LDC forum held in Boston, MA in June 2025. The major the...

AI summary The document references a request for information on a presentation or commentary from the LDC Gas Forum Northeast – 2025, where an NS Power representative attended and discussed the impact of AI/datacenters on natural gas use. The response directs the requester to review Attachments 1-5 for the information.

Where and when production will show up p. p. 82
Where and when production will show up Basin L48 Permian Haynesville North East Eagle Ford Bakken Rigs End 2024 548 286 37 31 51 36 Rigs End 2025 547 265 53 47 49 34 Lower 48 Production Evolution (Bcf/d, Avg.-Avg.)

AI summary The text presents data on the number of rigs ending in 2024 and 2025 across various basins, including the Lower 48, Permian, Haynesville, North East, Eagle Ford, and Bakken. It also references a section on the evolution of Lower 48 production measured in billion cubic feet per day.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →