Topic/Matter Intersection

Topic:"Generation Grid Resources" in M03416

Matter: NSPI CI# 33525 - $8,016,435 - Canaan Rd. 43V to Tremont 51V Line
1 passage 1 document

Generation Grid Resources across all matters →

N-1Redacted Work Order 7/27/2010 1 passage
Why do this project? p. p. 14
Why do this project? The load on the 69kV system in the Annapolis Valley has increased to a level where a loss of selected elements (138kV lir e or 138-69kV transformer) in the area, under peak load conditions, causes the voltage on the 69...

AI summary The project aims to upgrade the 69kV system in the Annapolis Valley by adding a new 138kV line and a 138kV-69kV autotransformer to ensure reliability during peak load periods when voltage drops below acceptable levels due to potential failures.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →