Why do this project?
p. p. 14
Why do this project? The load on the 69kV system in the Annapolis Valley has increased to a level where a loss of selected elements (138kV lir e or 138-69kV transformer) in the area, under peak load conditions, causes the voltage on the 69...
AI summary The project aims to upgrade the 69kV system in the Annapolis Valley by adding a new 138kV line and a 138kV-69kV autotransformer to ensure reliability during peak load periods when voltage drops below acceptable levels due to potential failures.