Topic/Matter Intersection

Topic:"Generation Grid Resources" in M06319

Matter: P-886 Nova Scotia Power Inc. (NSPI) Rate Application 2007
45 passages 24 documents

Generation Grid Resources across all matters →

N-1-aAppendix H - Proposed Tariffs (Large File - 21 MB) 1 passage
Net Operating Capability of Base Load Units:
Net Operating Capability of Base Load Units: The maximum 2-hour (or more) electrical output of the base load units, determined by tests, that the generator is capable of producing, at normal operating conditions. This is the net output aft...

AI summary The text provides a technical definition for the 'Net Operating Capability of Base Load Units.' It specifies that this capacity is the maximum electrical output a generator can produce over a period of 2 hours or more under normal operating conditions. The definition clarifies that this figure is net of station service requirements and accounts for any long-term de-rating factors.

N-1-aAppendix F - Load Forecast Report (Large File - 16 MB) 2 passages
5 Peak Demand
5 Peak Demand 6 7 The Total System Peak is defined as the highest single hourly average demand experienced in a 8 year. It includes both firm and interruptible loads and due to the weather-sensitive load 9 component in Nova Scotia, the Tot...

AI summary The document defines the Total System Peak as the highest single hourly average demand in a year, typically occurring between December and February in Nova Scotia due to weather-sensitive loads. It details the methodology for forecasting Net System Peaks, which involves using forecast monthly energies and historical coincident load factors for most rate classes, while individual demand contributions for large customers are assessed based on specific history. The system peak for 2007 is forecast at 2256 MW, with a projected long-term growth rate of 2.1 percent by 2015.

3 Peak Forecast
3 Peak Forecast Year Net System Peak MW Growth % Non-Firm Peak MW Growth % Firm Peak MW Growth % 2000 2009 6.6 412 33.3 1597 1.3 2001 1988 -1 369 -10.4 1619 1.4 2002 2078 4.5 348 -5.7 1730 6.9 2003 2074 -0.2 291 -16.4 1783 3.1 2004 2238 7....

AI summary The document provides a historical overview of peak electricity demand in Nova Scotia from 2000 to 2015. It tracks three distinct categories: Net System Peak MW, Non-Firm Peak MW, and Firm Peak MW. The data illustrates varying growth rates over the 15-year period, with Net System Peak showing significant fluctuations and Firm Peak demonstrating a steady upward trend of approximately 1.3% to 3.1% annually in the early 2000s before stabilizing.

N-1-aAppendix E - Dr. Roger A. Morin Exhibits 1 passage
Investor-Owned Integrated
Investor-Owned Integrated Fortis BC 40.6% CU Inc 43.0% EPCOR Utilities 53.0% Brascan Power 43.9% Nova Scotia Power 43.3% Ontario Power Generation 57.4% Trans Alta Utilities 46.9% Average 46.9%

AI summary The document provides a data table listing various investor-owned integrated utilities, including Fortis BC, CU Inc, EPCOR Utilities, Brascan Power, Nova Scotia Power, Ontario Power Generation, and Trans Alta Utilities. It includes percentage figures for each entity, noting an average ownership or participation rate of 46.9%.

N-2-aRIRs 1 to 39 - NSUARB to NSPI - REDACTED (Large File - 19 MB) 1 passage
Question IR-16: Direct Evidence, page 38, line 22.
Question IR-16: Direct Evidence, page 38, line 22. Please provide a breakdown of the 2,283 MW in generating capacity as follows: - a. By unit, outlining the in service date, the net capacity, the emergency rating, the fuel type (i.e. HFO,...

AI summary The document requests a detailed breakdown of 2,283 MW of generating capacity by unit, including in-service dates, net capacity, emergency ratings, fuel types, contributions to system peaks, and annual energy production from 2000 to 2005, including contributions from IPPs and imported power.

N-2-aRIRs 40 to 69 - NSUARB to NSPI - REDACTED (Large File - 34 MB) 3 passages
Response IR-44: (cont'd)
Response IR-44: (cont'd) - d. The increase in Generation Development is due to costs for items such as the Integrated Resource Plan (IRP) process, environmental projects and increased investment associated with planned air emissions techno...

AI summary Nova Scotia Power Inc. provides justifications for increases in Generation Development and pension benefit costs. Generation Development costs are attributed to the Integrated Resource Plan (IRP) process, environmental projects, and air emissions technology investments. Pension benefit cost increases are specifically linked to three factors: a decrease in the discount rate from 6% to 5.5%, an update to the mortality table from GAM-83 to UP-94, and a reduction in the return on assets assumption from 7.5% to 7.25%.

Response IR-47: (cont'd)
Response IR-47: (cont'd) January 2007 Non-firm Classes (MW) Sales Losses Generation Lg. Industrial Interruptible Rider 106.6 3.2 109.8 GRLF 1.1 0.0 1.1 ELI 2P-RTP 264.4 5.7 270.1 Total Non-firm: 372.1 8.9 381.0 Similarly, the firm coincide...

AI summary The document provides a breakdown of non-firm power classes for January 2007, specifically detailing sales, losses, and generation for Rider, GRLF, and ELI 2P-RTP categories. It notes that the total non-firm load is 372.1 MW. Additionally, it clarifies the calculation method for firm coincident peak, which is derived from the sum of all other classes considered firm load.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB REDACTED Response IR-49: (cont'd) e) No. The Company has proposed this rate according to the annual adjustment methodology approved by the Board and based on NSPI's forecast average incre...

AI summary The Utility and Rate Board (UARB) is responding to an information request from Nova Scotia Power Inc. (NSPI). The response clarifies that the proposed rate for the Generation Replacement and Load Following (GRLF) program was developed using the Board-approved annual adjustment methodology and NSPI's forecast average incremental cost of generation. It also notes that the GRLF rate is optional for customers, who may decide to opt-in before the rate year begins.

N-2-bRIRs 70 to 75 - NSUARB to NSPI - REDACTED (Large File - 33 MB) 2 passages
Nova Scotia Power
Nova Scotia Power Halifax, Nova Scotia Nova Scotia Power, a subsidiary of Emera, is the principal suppl ier of electricity in Nova Scotia, meeting most of the province's needs for electricity generation, transmission and distribution. It s...

AI summary Nova Scotia Power, a subsidiary of Emera, is the principal electricity supplier in Nova Scotia, serving 460,000 customers. It has an installed generating capacity of nearly 2,300 MW and operates under an open access transmission tariff approved by the Nova Scotia Utility and Review Board in 2005, allowing third-party non-discriminatory access to its transmission system.

Nashville, Tennessee
Nashville, Tennessee Nashville Electric Service, whose shareholder is the City of Nashville, distributes the electricity that it purchases from the Tennessee Valley Authority (TVA) to more than 340,000 customers. A federal agency, the TVA...

AI summary Nashville Electric Service, owned by the City of Nashville, distributes electricity purchased from the Tennessee Valley Authority (TVA) to over 340,000 customers. The TVA, a federal agency, has exclusive rights to supply electricity within seven U.S. states. Recently, some distributors have shown interest in purchasing electricity from other suppliers, leading to ongoing discussions.

N-2-bRIRs 77 to 84 - NSUARB to NSPI - REDACTED (Large File - 35 MB) 4 passages
Property, plant and equipment is comprised of the following:
Property, plant and equipment is comprised of the following: millions of dollars 2005 Cost Accumulated De~reciation Net Book Value Generation Thermal $1,719.1 $634.1 $1,085.0 Gas turbines 31.1 21.5 9.6 Combustion turbines 71.4 5.4 66.0 Hyd...

AI summary The document provides a detailed breakdown of property, plant, and equipment (PPE) for the year 2005. It categorizes assets into generation (thermal, gas turbines, combustion turbines, hydroelectric, and wind turbines), transmission, distribution, and general plant. The table includes the historical cost, accumulated depreciation, and net book value for each category, totaling $2,406.7 million in net book value for the primary asset classes listed.

Five-Year Summary
Five-Year Summary 2005 2004 2003 2002 2001 Electric energy sales ( GWh) Residential 3,999.5 4,038.7 3,818.9 3,835.0 3,756.7 Commercial 3,003.9 2,964.6 3,000.9 2,818.3 2,724.9 Industrial 4,196.9 4,196.5 4,091 .3 3,786.2 3,831 .6 Other 436.4...

AI summary The document provides a five-year historical summary (2001-2005) of Nova Scotia Power's operations. It details electric energy sales by sector (Residential, Commercial, Industrial), energy sources (predominantly coal, with increasing oil and hydro), and total generation. It also tracks customer counts, generating nameplate capacity by technology (coal, dual-fired, gas, hydro, wind), and the total number of employees. The data highlights a steady increase in total electric energy sales and customer base over the period.

Overview
Overview NSPI is the primary electricity supplier in Nova Scotia, providing over 95% of the electricity generation, transmission and distribution in the province. The company owns 2,293 megawatts ("MW") of generating capacity. Approximatel...

AI summary Nova Scotia Power Incorporated (NSPI) is the province's primary electricity supplier, providing over 95% of its generation, transmission, and distribution. The company's capacity is comprised of coal, oil, natural gas, hydro, and wind. As a regulated public utility under the Public Utilities Act (Nova Scotia), NSPI's operations and rates are overseen by the Nova Scotia Utility and Review Board (UARB). NSPI operates under a cost-of-service model where rates are set to cover prudently incurred costs and provide a regulated return on equity (ROE).

Capacity
Capacity To ensure reliability of service, NSPI maintains a generating capacity greater than firm peak demand. The total company-owned generation capacity to 2,293 MW, which is supplemented by 57 megawatts in service contracted with indepe...

AI summary Nova Scotia Power Inc. (NSPI) manages a generating capacity of 2,293 MW, supplemented by 57 MW of contracted capacity, to ensure service reliability and meet regional planning criteria. The company emphasizes maximizing capacity utilization to improve operating efficiency and defer capital investment. Key strategies include maintaining high asset availability through planned maintenance, managing interruptible loads, and optimizing export sales. NSPI reported a capacity utilization of 78% in 2005, a slight decrease from 2004 due to scheduled turbine inspections.

N-2-bRIR 76 - NSUARB to NSPI - REDACTED (Large File - 46 MB) 3 passages
Capacity
Capacity To ensure reliability of service, NSPI maintains a generating capacity greater than firm peak demand. The total companyowned generation capacity is 2,293 MW, wh ich is supplemented by 57 megawatts in service contracted with indepe...

AI summary Nova Scotia Power Inc. (NSPI) manages a total generating capacity of 2,293 MW plus 57 MW of contracted capacity to ensure service reliability. The company emphasizes maximizing capacity utilization to improve operating efficiency and defer capital investments. Strategies for optimization include maintaining high plant availability, managing interruptible loads to shift demand from peak to off-peak periods, and optimizing export sales. NSPI reports high performance in capacity-related indicators, ranking among the top units in Canada.

Funds Placed in Escrow on Acquisition of Generating Stations
Funds Placed in Escrow on Acquisition of Generating Stations Brookfield Power Corporation (formerly Brascan Power Corporation) and Emera Inc. , in a 50/50 joint venture, acquired Bear Swamp, a 600 megawatt pumped storage hydro-electric fac...

AI summary The document describes two joint venture acquisitions involving Brookfield Power Corporation (formerly Brascan Power Corporation) and Emera Inc. The first was a 50/50 joint venture to acquire the 600 MW Bear Swamp pumped storage hydro-electric facility in Massachusetts for US $92 million, which was completed in May 2005 following initial escrow deposits. The second acquisition, a 49 MW Bellow Falls hydro-electric facility, failed to receive regulatory approval, resulting in the return of Emera's escrow deposit in Q4 2005.

Property, plant and equipment is comprised of the following:
Property, plant and equipment is comprised of the following: 2005 Accumulated Net millions of dollars Cost De prec iatlon Book Value Generation Thermal $ 1,719.1 $ 634.1 $1,085.0 Gas Turbines 31.1 21.5 9.6 Combustion Turbines 76.5 10.5 66....

AI summary The document provides a detailed breakdown of property, plant, and equipment (PPE) for the utility, categorized by asset type including generation (thermal, gas, combustion, hydro, and wind), transmission, and distribution. It presents a comparative financial table for the years 2004 and 2005, listing the original cost, accumulated depreciation, and net book value in millions of dollars for each category.

N-2-eRIRs 1 to 49 - Liberty to NSPI - REDACTED (Large File - 15 MB) 1 passage
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty REDACTED Question IR-35: Please describe how NSPI evaluates the relative economics of burning contract natural gas in the steam units at Tufts Cove (Units 1, 2 and 3) versus burning HF...

AI summary Nova Scotia Power Incorporated (NSPI) responded to an information request regarding the economic evaluation of fuel sources for the Tufts Cove steam units (Units 1, 2, and 3). NSPI explained that it determines whether to burn contract natural gas or heavy fuel oil (HFO) by calculating Generation Production Costs, which include market prices, delivery costs, handling costs, spot foreign exchange rates, and heat rate differences. NSPI selects the least expensive fuel alternative based on these calculations.

N-2-fRIRs 50 to 81 - Liberty to NSPI - REDACTED (Large File - 16 MB) 1 passage
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: Liberty Question IR-59: Please describe any changes made in 2005 or 2006 to date, or any planned future changes to the two turbines at Tufts Cove to make them capable of using light fuel oil (...

AI summary NSPI has not made any changes to the two turbines at Tufts Cove since 2005 or 2006 to enable them to use light fuel oil instead of natural gas, and has no plans to do so.

N-2-fRIRs 1 to 18 - MEUNSC to NSPI - REDACTED 1 passage
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: MEUNSC Question IR-2: Reference: Direct Evidence Page 63 "Incremental load increase is 111 GWh at a cost of $19.6 million." - a. Please explain the difference between the 17.65¢/kWh incrementa...

AI summary The Maritime Energy Users Notice Committee (MEUNSC) requested clarification from Nova Scotia Power Inc. (NSPI) regarding the incremental cost calculations for load increases. MEUNSC questioned the discrepancy between the reported 17.65¢/kWh incremental cost and the 10.32¢/kWh Load Following rate, suggesting the cost should be lower given the load size. NSPI responded that MEUNSC's calculations were incorrect, clarifying that the $19.6 million fuel cost increase applies to a 130.8 GWh net system requirement at a unit cost of 14.98¢/kWh.

N-2-gRIRs 30 to 91 - SEB to NSPI - REDACTED (Large File - 29 MB) 1 passage
Response IR-43: a. Changes in Generation Equipment Capacity:
Response IR-43: a. Changes in Generation Equipment Capacity: o capacity change is to align the forecast with recent performance.

AI summary The response discusses a capacity change intended to align the forecast with recent performance, indicating an adjustment in generation equipment capacity planning.

N-7-aRIRs 47 to 67 - CME to NSPI - REDACTED 2 passages
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CME Question IR-61b: Reference Liberty- IR-77 Why does NSPI not hedge LFO? Response IR-61b: NSPI has not hedged Light Fuel Oil (LFO) as the volume required can be highly variable. LFO is used...

AI summary In response to an information request, CME clarifies that Nova Scotia Power Inc. (NSPI) does not hedge Light Fuel Oil (LFO) because the required volume is highly variable. LFO is primarily used for combustion turbine units, which serve as peaking units. The consumption volume of LFO is subject to fluctuations based on customer load, external market conditions, and the application of specific rates such as the 2P-RTP.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CME Question IR-66: Reference UARB- IR-44 The CME respectfully disagrees that forecasts of OM&G costs are not relevant to establishing the 2007 test year and asks that the question be fully an...

AI summary Canadian Mineral Exploration (CME) challenges Nova Scotia Power Inc.'s (NSPI) position regarding the relevance of Generation and Fuel (OM&G) cost forecasts for the 2007 test year. CME argues that 'initiatives foregone' impacts current and future test years, asserting that sophisticated organizations utilize multi-year plans and budgets despite inherent uncertainties. NSPI responds by stating they have already provided the requested information in a previous information request.

N-7-bRIRs 142 to 143 - SEB to NSPI - REDACTED (Large File - 45 MB) 5 passages
Operational Strength To Build On
Operational Strength To Build On - 2,300 MW of capacity in Nova Scotia - Diverse generation portfolio coal, petcoke, oil, gas, hydro, tidal, wind and biomass - Increasing renewable component - Outstanding operational performance - 5 of Top...

AI summary The document highlights Nova Scotia Power Inc.'s (NSPI) operational capabilities as a foundation for future growth. It notes a diverse generation portfolio of 2,300 MW, which includes a mix of coal, petcoke, oil, gas, hydro, tidal, wind, and biomass. The company emphasizes its increasing renewable energy component and its high standard of operational performance, ranking among the top units in Canada, to demonstrate its readiness for expansion.

Bear Swamp
Bear Swamp - Bear Swamp, Massachusetts - 600MW Pumped Storage Hydro - First investment in 50/50 partnership with Brookfield Power - Low risk merchant operation - Seeking to contract substantial portion of output - LICAP settlement adds val...

AI summary The text identifies the Bear Swamp project in Massachusetts as a 600MW Pumped Storage Hydro facility. It highlights that the project was the first investment in a 50/50 partnership with Brookfield Power. The project is characterized as a low-risk merchant operation, with the owners seeking to contract a substantial portion of its output. Additionally, the text notes that the LICAP settlement provides added value for the project's capacity.

Powerful Potential
Powerful Potential Strategic opportunities for investment: - Low risk generation - Transmission electricity and gas - Renewable generation - Environmental investment in rate base - Regulated transmission and distribution

AI summary The document highlights strategic investment opportunities within the utility sector, focusing on low-risk generation, transmission of electricity and gas, and renewable energy sources. It emphasizes the importance of environmental investments within the rate base and the stability of regulated transmission and distribution infrastructure as key areas for growth and strategic opportunity.

Emera at a Glance
Emera at a Glance - Electricity is our business - Generation, transmission, distribution - Foundation in regulated monopolies - 585,000 customers in Nova Scotia and Maine - Low risk merchant generation - Gas transmission supports generatio...

AI summary This section provides a high-level corporate overview of Emera, highlighting its core business operations in the electricity sector, including generation, transmission, and distribution. It notes that the company operates as a regulated monopoly serving approximately 585,000 customers across Nova Scotia and Maine. The text also outlines key financial metrics, including $1.2 billion in revenues, $4 billion in assets, $120 million in earnings, and $275 million in cash flow.

Powerful Potential
Powerful Potential Strategic opportunities for investment: - Low risk generation - Transmission electricity and gas - Environmental investment in rate base - Renewable generation - Regulated transmission and distribution

AI summary The document outlines strategic investment opportunities for the utility, highlighting low-risk generation and transmission for both electricity and gas. It emphasizes environmental investments within the rate base, specifically focusing on renewable generation, as well as regulated transmission and distribution infrastructure.

N-14Evidence filed by John Antonuk, Donald T. Spangenberg, Jr. and John B. Adger, Jr. (on behalf of NSUARB) (Large File - 26 MB) 2 passages
Electricity
r for nuclear-plant performance-improvement projects that Liberty conducted for Duquesne Light Company, Centerior Energy, Nebraska Public Power District, and Pennsylvania Power & Light Company (PP&L). Engagement Director for a Liberty assi...

AI summary This text outlines various engagements conducted by Liberty in the electricity sector, including performance-improvement projects for nuclear plants, assisting with a transmission line proposal in Florida, and conducting strategic planning for an electric cooperative.

Utility Strategy
Utility Strategy Project Manager and Lead Consultant for Liberty's facilitation of strategic planning for Powder River Energy Corporation, a Wyoming electric-distribution cooperative. Project Manager for a second project aimed at improving...

AI summary The text outlines various projects led by Liberty in the energy sector, including strategic planning for electric-distribution cooperatives, development of energy plans for Wyoming, power-marketing initiatives, and assessments of industry restructuring impacts. It also includes work on automated meter reading transitions and workforce management.

N-16Review of NSPI's Fuel Costs on behalf of Avon Valley Greenhouses et al. (AVON) REDACTED (Large File - 38 MB) 1 passage
LIST OF RELEVANT INDEPENDENT POWER PROJECTS (IPP)
LIST OF RELEVANT INDEPENDENT POWER PROJECTS (IPP) - For an American IPP developer, due diligence, including contract, risk management and counter party risk review, of a Swiss electricity trading company primarily active in the Balkans, Au...

AI summary The text outlines various due diligence and development assistance activities undertaken by American and international entities in energy-related projects across multiple European countries, focusing on power generation, trading, and infrastructure.

N-20Direct Testimony and Exhibit - Alan Rosenberg on behalf of SEB - REDACTED (Large File - 20 MB) 1 passage
31
31 1 fixed) costs. Thus, baseload plants typically run as much as possible, typically 8 OF PEAKING PLANTS OR CYCLING THAN OF BASELOAD PLANTS? 9 A Yes. NSPI treats the LM6000s and Tufts Cove as baseload plants. In other words, in 10 its cla...

AI summary The discussion addresses the classification of LM6000 combustion turbines as baseload plants by NSPI, with the respondent arguing that they are peaking plants due to higher operating costs, lower capital costs, and significantly lower capacity factors compared to baseload plants like coal facilities.

N-28RIR 1 to 12 - Manfred Raschke to NSPI REDACTED 1 passage
IR-12: Reference page 57 last paragraph
IR-12: Reference page 57 last paragraph " ..• particularly since gas has the advantage of being able to respond quickly to changes in generation from the growing volume of onshore (and in the future offshore) wind projects and other renewa...

AI summary The increasing volume of renewable energy sources, particularly intermittent ones like wind and solar, requires thermal generating assets with greater flexibility to respond to changes in production. European systems with higher renewable penetration have shown that improved wind forecasting and flexible generation sources, such as gas-fired combined cycle plants, can help balance renewable output.

N-40RIRs Attachment SEB-NSPI - 4a (Large File - 40 MB) 3 passages
Attachment SEB-NSPI-4a
Attachment SEB-NSPI-4a Name of Respondent _ (553) Maintenance of Generating and Electric Pla ant THE RESIDENCE OF THE PARTY OF THE PARTY OF THE PARTY OF THE PARTY OF THE PARTY OF THE PARTY OF THE PARTY OF THE PARTY OF THE PARTY OF THE PART...

AI summary The provided text is a fragmented table from Attachment SEB-NSPI-4a, appearing to list respondent names and associated numerical data. However, the content is corrupted with repetitive placeholder text ('THE RESIDENCE OF THE PARTY OF...') and incomplete figures, making it impossible to determine specific arguments, entities, or themes beyond the general context of a regulatory proceeding.

Table A4.3.10 - Primary Energy for Electrical Generation (PJ) - British Columbia
Table A4.3.10 - Primary Energy for Electrical Generation (PJ) - British Columbia Supply Push Sceni ario Hydro Nuclear (Uranium) Coal Orimulsion Heavy Oil Light Oil Dessel Natural Gae 2006 216.75 6.00 6.00 6.00 0.47 9.02 6.79 48.95 183,71 0...

AI summary The provided text is a data table (Table A4.3.10) detailing the primary energy sources used for electrical generation in British Columbia. It tracks various energy types, including Hydro, Nuclear (Uranium), Coal, Orimulsion, Heavy Oil, Light Oil, Diesel, and Natural Gas, across different years/scenarios. The data quantifies energy consumption in Petajoules (PJ), showing shifts in the energy mix over time.

Table A4.3.5 - Primary Energy for Electrical Generation (PJ) - Québec
Table A4.3.5 - Primary Energy for Electrical Generation (PJ) - Québec Supply Push Scena erio Hydro Nuclear (Uranium) Coal Orinulsion Heavy Oil Light Oil Dieset Natural Gas 2000 622.62 60.22 0.00 0.00 3.50 0.26 0.97 1.42 0.52 599.65 58.67 0...

AI summary The provided text is a data table (Table A4.3.5) illustrating the primary energy sources for electrical generation in Québec. It quantifies the energy input in Petajoules (PJ) across various fuel types, including Hydro, Nuclear (Uranium), Coal, Orinule, Heavy Oil, Light Oil, Diesel, and Natural Gas, across different supply push scenarios.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 5 (Large File - 20 MB) 1 passage
Section 61
Service under this Rider is available when taken in conjunction with firm service under the large general service rate schedules. Supplementary power Service under this Rider is available to QFs and other power production facilities under...

AI summary The text describes the availability and territory for a specific Rider, noting that it can be taken in conjunction with firm service under large general service rate schedules. It further specifies that supplementary power service under this Rider is available to Qualifying Facilities (QFs) and other power production facilities through specific contracts on a case-by-case basis within the Texas Service Territory.

N-41RIR 1 Dr. Alan Rosenberg to NSUARB -REDACTED (Large File - 10 MB) 1 passage
FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS)
FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS) (1) (2) (3) L CLASSIFICA (4) DEMAND ENERGY CUSTOMER TOTAL RELATED RELATED RELATED GENE ERATION FUNCTION COMPANY PLANT PLANT PLANT (1) STEAM 1,052,506 939,394 113,112 (2) HYDRO...

AI summary The text presents a financial summary for the year ending December 31, 2007, detailing various categories of generation plant and related assets, including steam, hydro, wind, and gas turbine plants, along with associated capital and deferred credits.

N-46Rebuttal Evidence of NSPI - Appendix A to J - REDACTED (Large File 27 MB) 4 passages
Strengths
Strengths - (1) Regulated operations provide a high degree of earnings and cash flow stability. Regulation also ensures the balance sheet remains stable, which currently reflects a 37.5% deemed equity. NSPI provides 97% of the generation,...

AI summary The text outlines the strengths of Nova Scotia Power Inc. (NSPI), highlighting its stable earnings, cash flow, and dominant market position in Nova Scotia's electricity generation, transmission, and distribution. It notes that while rates are high, geographic isolation and limited interconnection act as barriers to competition. Additionally, it discusses NSPI's transition to international low-sulphur coal imports to reduce emissions, noting that the UARB has deemed these fuel expenses prudent and recoverable.

OPERATING STATISTICS
OPERATING STATISTICS 12 mos. ended For the year ended December 3 I Electricty Sold June 30, 2006 2005 2004 2003 2002 2001 Residential 34.4% 3,929.5 4,000 4,039 3,819 3,835.0 3,756.7 Commercial 25.8% 2,996.9 3,004 2,965 3,001 2,818.3 2,724....

AI summary The document provides a detailed overview of the operating statistics for the period ending June 30, 2006, compared to previous years. It outlines electricity sales by sector (Residential, Commercial, Industrial, and Other), installed generation capacity by fuel source (Coal, Hydro, Dual fuel, Gas turbine, and Wind), and total energy generated and purchased. Key metrics include energy sales growth, transmission losses, and export interconnections with New Brunswick Power.

Table 2 Emera Inc. Generation Portfolio
Table 2 Emera Inc. Generation Portfolio Fuel Type MW %of total Coal 1,243 54 Dual-fueled (oil or gas) 350 15 Gas 323 14 Hydro 395 17 Wind turbines 0 Total installed capacity 2,312 100 Other factors Long-term power purchase contracts 32 Int...

AI summary The document provides a profile of Emera Inc.'s generation portfolio, detailing its installed capacity and annual energy production by fuel type from 2001 to 2005. Coal remains the primary fuel source, accounting for 54% of total capacity. The text also outlines Emera's fuel risk management strategies, which include hedging 30%-50% of coal requirements 2-4 years in advance and utilizing a privately owned marine terminal to secure lower-cost, higher-quality coal.

Company Profile
Company Profile Emera (EMA) is a relatively small utility/energy services holding company with total assets of approximately $4 billion. Historically, management's growth strategy has focused on the regions in relatively close proximity to...

AI summary The document provides a company profile of Emera (EMA), a utility and energy services holding company with approximately $4 billion in total assets. Its core business is centered on regulated electric utility subsidiaries, primarily Nova Scotia Power Inc. (NSP) in Nova Scotia and Bangor Hydro-Electric (BHE) in Maine, which account for over 90% of its consolidated assets and net income. The company is also expanding its geographic and sectoral focus through investments in infrastructure assets and a 13% interest in the Maritimes & Northeast Pipeline.

58003Participant responses to Preliminary Issues List for P-886 2 passages
Renewable Energy:
Renewable Energy: There are numerous outstanding issues surrounding the future and current impact on electricity pricing. Stakeholders and intervenors such as HRM have been and are continuing to consume considerable resources to effectivel...

AI summary The document highlights the increasing number of regulatory proceedings involving NSPI and the need to address renewable energy issues alongside fossil fuel costs. It emphasizes the importance of consolidating proceedings for efficiency and discusses the rising costs of wind energy, suggesting that decisions on transmission and distribution costs should be made during current rate hearings.

- the shift to international coal in the years following the Devco closure; 4.
- the shift to international coal in the years following the Devco closure; 4. CHARLOTTETOWN FREDERICTON HALIFAX MONCTON SAINT JOHN ST. JOHN'S 902 368 8473 506 458 8572 902 425 6500 506 857 8970 506 643 6500 709 722 8735 - 5. the introduct...

AI summary The text references the shift to international coal following the Devco closure and the introduction of the LM6000s. These points appear to be part of a broader discussion on energy generation and resource planning.

86472Submission - Re: Future Filing Requirements and comments on Board Draft Strawman 1 passage
OP - Organization Profile
OP - Organization Profile - 1. Latest regulated annual reports of NSPI and EMERA - 2. Current organization chart ofNSPI showing all positions reporting no further than two levels down from the President and CEO, including a full organizati...

AI summary The document outlines a list of requested information for a regulatory proceeding, including organizational profiles, financial documents, and operational data related to NSPI and EMERA. It includes details on assets, reliability statistics, customer information, and emissions targets.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →