DATE FILED: December 20, 2024 Page 22 of 40 p. pp. 20-22
DATE FILED: December 20, 2024 Page 22 of 40 1 5.0 STORM HARDENING – TARGETED EQUIPMENT REPLACEMENTS AND 2 UPGRADES 3 4 2024-2029 Forecast Investment: $916 million 5 Forecasted Performance Standards SAIDI Reduction: 0.13 to 0.24 hours 6 7 N...

AI summary NS Power's Storm Hardening Program aims to strengthen the power system through targeted equipment upgrades and replacements, focusing on distribution, transmission, and substation infrastructure. The program seeks to improve reliability, reduce unplanned outages, and adapt to evolving challenges such as worsening weather conditions. Forecast investment for 2024-2029 is $916 million, with $487 million allocated to distribution system upgrades.

N-3NSPI (Synapse) RIR 1 to 65 1 passage
While residual risk remains, the proposed work supports sustaining transmission line reliability performance by reducing vegetation‑related exposure under severe weather conditions. p. p. 72
While residual risk remains, the proposed work supports sustaining transmission line reliability performance by reducing vegetation‑related exposure under severe weather conditions. Line Number Line/Structure Number VEG_POLYGO CONDUCTOR_ R...

AI summary The text discusses proposed work aimed at reducing vegetation-related risks to transmission line reliability under severe weather conditions, with specific details provided in a table format for various line spans and their associated risk metrics.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →