N-2NSPI (NSEB) RIR 1 to 22 - Redacted
7 passages
NON-CONFIDENTIAL 1 Request IR-2: 2 3 In the Description, NS Power noted that "… requires a more robust and automated system 4 to ensure that planned and executed dispatch scenarios align with Power Purchase 5 Agreement (PPA) terms and are...
AI summary The document discusses the need for a more robust and automated system to ensure that dispatch scenarios align with Power Purchase Agreement (PPA) terms, specifically those related to Automatic Generation Control (AGC) services. These terms require enhanced transactional data recording and financial analysis, which cannot be managed manually.
NON-CONFIDENTIAL 1 Similar provisions that require the use of an automated system will also be included in 2 PPAs for the Green Choice Program (M11455) and projects prescribed under s. 24 3 (formerly s. 4AA) of the Electricity Act . 4 5 En...
AI summary The text discusses the inclusion of automated system requirements in Power Purchase Agreements (PPAs) for the Green Choice Program and projects under the Electricity Act. It emphasizes the need for enhanced AGC capabilities to manage increased variable renewable energy and reduced thermal generation, necessitating new tools and processes in the CI C0053696 - ECC Wind Integration project.
CI C0053696 ECC Wind Integration Project (NSEB M12593) NSPI Responses to NSEB Information Requests 1 Request IR-3: 2 3 For both software solutions, please provide the following project development details for 4 each of them: 5 6 (a) List t...
AI summary The document outlines the response to an information request regarding the CI C0053696 ECC Wind Integration Project. It details the major phases, estimated durations, key milestones, and expected in-service date of July 2026 for the software solutions involved in the project.
REDACTED C0053696 NSEB IR-7 Attachment 1 Page 1 of 2 REDACTED (CONFIDENTIAL INFORMATION REMOVED) IPP Туре Capacity Summer (MW) Capacity Winter (MW) Interconn. Voltage (Volts) Connection Feeder Number Transmission or Distribution Connected...
AI summary The document contains a table listing information about an Independent Power Producer (IPP) with a wind energy capacity of 0.02 MW in both summer and winter, connected to the distribution system at 12470 volts. Automatic Generation Controls (AGC) are not enabled for this connection.
Active Transmission Interconnection Requests Publish Date: 2026-01-08 Queue Order T/D/U IR# Request Date County MW Summer MW Winter Interconnection Point Type Inservice date Revised Inservice date Status Service Type IC Identity 25 T 677 2...
AI summary The document lists active transmission interconnection requests in Nova Scotia as of January 8, 2026, including details such as the queue order, interconnection point, type of project, and status of each request. These requests include wind and battery projects with varying capacities and inservice dates.
CI C0053696 ECC Wind Integration Project (NSEB M12593) NSPI Responses to NSEB Information Requests
AI summary This document contains NSPI's responses to information requests from the NSEB regarding the ECC Wind Integration Project. It outlines technical and procedural details related to the integration of wind energy into the power grid.
2 Installed generation capacity does not represent firm capacity. CI C0053696 ECC Wind Integration Project (NSEB M12593) NSPI Responses to NSEB Information Requests
AI summary The text indicates that installed generation capacity does not equate to firm capacity. It references a wind integration project and related responses to information requests by the Nova Scotia Energy Board.