Topic/Matter Intersection

Topic:"Generation Grid Resources" in M12717

Matter: North American Electric Reliability Corporation (NERC) - Fourth Quarter 2025  - Application for Approval of Reliability Standards
3 passages 2 documents

Generation Grid Resources across all matters →

N-1Application 2 passages
Any comments regarding this glossary should be reported to the NERC Help Desk. Select "Standards" from the "Service" drop-down menu and "Other" from the Standards Subcategory drop-down menu. p. p. 9
Any comments regarding this glossary should be reported to the NERC Help Desk. Select "Standards" from the "Service" drop-down menu and "Other" from the Standards Subcategory drop-down menu. Subject to Enforcement Block Dispatch Project 20...

AI summary The text discusses the 'Block Dispatch' rule under Project 2006-07, which involves segmenting generator capacity into loadable blocks for approximate generation dispatch based on factors like efficiency and fuel supply.

WECC Regional Definitions p. p. 9
3 FERC approved the WECC Tier One Reliability Standards in the Order Approving Regional Reliability Standards for the Western Interconnection and Directing Modifications, 119 FERC ¶ 61,260 (June 8, 2007). In that Order, FERC directed WECC...

AI summary The text discusses the approval of WECC Tier One Reliability Standards by FERC in 2007, with a directive to address inconsistencies between WECC's regional definitions and the NERC Glossary. Replacement standards were filed with FERC in 2009. The document includes definitions of terms such as 'Spinning Reserve' and 'Transfer Distribution Factor' under WECC regional standards.

102877Board letter re: names and contact particulars for the owners of the IBRs 1 passage
Also, there are several planned IBRs that might be captured by the new definitions: p. p. 1
Also, there are several planned IBRs that might be captured by the new definitions: Plant Name Resource Type Gross Nameplate Rating (MVA) Voltage at Point of Interconnection (kV) GO/GOP Category IR574 Ellershouse III Wind 66.72 138 2 IR597...

AI summary The text lists several planned Inverter Base Resources (IBRs), primarily wind and battery energy storage systems (BESS), along with their specifications such as nameplate ratings, voltage levels, and interconnection categories. These resources are part of a regulatory proceeding and are referenced in Exhibit N-2, page 5 of matter M12717.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →