Topic/Matter Intersection

Topic:"Generation Grid Resources" in M12745

Matter: Nova Scotia Power Inc. - CI C0080671 – LIN1 HP IP Turbine Refurbishment 2026 - $3,249,384
4 passages 1 document

Generation Grid Resources across all matters →

N-2NSPI (NSEB) RIR 1 to 4 - Redacted 4 passages
Section 5 p. p. 10
8 (c) Lingan 1 is a coal fired generator and would be considered a higher emitting generation 9 source relative to other units. 10 11 (d) Lingan 1 does not currently have a firm retirement date, and the previous IRP had the unit 12 forecas...

AI summary The text discusses the Lingan 1 coal-fired generator, noting its higher emissions compared to other units and its planned conversion to Heavy Fuel Oil by 2029. It also references ongoing refurbishments of generating units designated for peak load support post-2030.

NON-CONFIDENTIAL p. p. 10
NON-CONFIDENTIAL 1 maintenance strategy, and third party expertise, as appropriate. This is being done to ensure 2 units are safe and reliable enough to meet system demands throughout coal unit 3 retirements, conversions, and as new renewa...

AI summary The document discusses the maintenance and future operation of the Lingan 1 unit, including its planned conversion to HFO operation in 2029 and its expected low utilization following the conversion. NSPI is maintaining and investing in critical generating assets to ensure reliability during the transition.

LIN1 HP/IP Turbine Refurbishment Summary of Alternatives p. p. 10
LIN1 HP/IP Turbine Refurbishment Summary of Alternatives Date:

AI summary The document outlines the summary of alternatives for the LIN1 HP/IP Turbine Refurbishment. It includes a visual element, likely depicting key considerations or options related to the turbine refurbishment project.

LIN1 HP/IP Turbine Refurbishment Summary of Sensitivities p. pp. 10-11
LIN1 HP/IP Turbine Refurbishment Summary of Sensitivities Division : Date : 07-May-26 Department : CI Number: Power Production Lingan Unit 1

AI summary The document provides a summary of sensitivities related to the LIN1 HP/IP Turbine Refurbishment. It includes information about the division, date, department, and power production details for Lingan Unit 1.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →