Why do this project? p. p. 1
Why do this project? During the 2009 Trenton #5 shutdown, the original equipment manufacturer (OEM) recommended replacement of the IP rotor impulse row of blades because of wear from solid particle erosion. The blades are configured in pac...

AI summary During the 2009 Trenton #5 shutdown, the OEM recommended replacing the IP rotor impulse row blades due to wear. A temporary weld repair was done to allow planned replacement in 2010. The outage was also used to complete other OEM-recommended work, including various blade, seal, and component replacements.

POWER GENERATION SERVICES A Division of Siemens Canada LTD p. p. 11
POWER GENERATION SERVICES A Division of Siemens Canada LTD STRIPE OWN INSPECTION REPORT SDIR NO. 278285101-25 Machine No. Unit No. Assembly://Subassembly.or.Component Submitted By Date 3902 5 IP Spindle condition 4 13-Aug-09 Contract Numb...

AI summary The document is a submission from Siemens Canada LTD regarding an inspection report for a power generation unit, including details such as machine number, unit number, component, submission date, and contract number.

Section 26 p. p. 15
nergy Service Division/DivIsion Services 6nerg6t1ques 30 Millon Avenue P.O. Box 2510 Hamilton, Ontario, Canada LaN 3K2 Page 2 of2 Ref: Our EH326304 Date: September 24, 2009 To: - Nova Scotia Power CC: - Siemens Canada Subject: TRENTON UNIT...

AI summary This document is a reference from the Energy Service Division to Nova Scotia Power regarding the replacement of the HP/IP spacer plate for the Trenton Unit 5. It is part of a communication with Siemens Canada.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →