NON-CONFIDENTIAL 90 (a) For the Class 2 projects, will the process follow the current interconnection process or is 91 NSPI considering other ways to streamline the application process and any system 93 (b) Please explain in detail why app...
AI summary The text discusses the interconnection process for Class 2 projects and the eligibility of certain renewable energy generation methods, such as capturing excess energy from pressure reducing valve chambers and the combustion of biodiesel, for Net Metering. It also references the amended Electricity Act and its provisions on meter aggregation within a distribution zone.
NON-CONFIDENTIAL 152 feeding the energy produced, or alternatively as long as the Nova Scotia Power System 153 Operator deems it acceptable based on the load on the distribution zone where the 154 generator is located and other factors; an...
AI summary The text outlines criteria for connecting generators to the Nova Scotia Power System, specifying conditions under which a Class 1 or Class 2 generator may be connected based on load conditions and other factors. It also includes contact information for Jeff Larsen of Mcinnes Cooper.