N-2-gRIRs 30 to 91 - SEB to NSPI - REDACTED (Large File - 29 MB) 1 passage
Changes in Maintenance Schedule:
Changes in Maintenance Schedule: - o Lingan 2 and 4 will be equipped with low NOx burners in 2007. - o for a major overhaul, thus requiring a longer maintenance outage in 2007. - o due to advancement of maintenance into 2006.

AI summary The document outlines changes in the maintenance schedule for Lingan 2 and 4, including the installation of low NOx burners in 2007, a longer maintenance outage in 2007 due to a major overhaul, and the advancement of maintenance into 2006.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 3 (Large File - 23 MB) 1 passage
ISSUED UNDER AUTHORITY OF THE INDIANA UTILITY REGULATORY COMMISSION DATED AUGUST 23, 2006 IN CAUSE NO. 38702-FAC57
ISSUED UNDER AUTHORITY OF THE INDIANA UTILITY REGULATORY COMMISSION DATED AUGUST 23, 2006 IN CAUSE NO. 38702-FAC57 1/97 Transmission voltage customer - The customer owns, leases, or otherwise bears financial responsibility for the distribu...

AI summary The document outlines the terms and conditions for transmission voltage service provided by Kansas City Power & Light Company. It specifies that customers must bear financial responsibility for distribution substations and must enter into special contracts for standby, breakdown, or supplementary services. These contracts must meet specific technical and safety requirements, with interconnection costs assessed on a nondiscriminatory basis. The text also includes administrative headers and signatures for the issuance of the schedule under the Indiana Utility Regulatory Commission's authority.

57968Amended Board Order (and attached Schedules A to C) 1 passage
3.6.6 Special Conditions
3.6.6 Special Conditions - a) Special conditions in this regulation do not supersede, modify or nullify special conditions accompanying the otherwise-applicable metered tariff schedules. - b) Qualifying generating equipment must meet the f...

AI summary This section outlines special conditions for net metering, including requirements for generating equipment, ownership, and compliance with safety standards. It also details the application process and termination policies. NSPI has the authority to approve or verify compliance and may impose additional costs.

57968Amended Board Order (and attached Schedules A to C) 2 passages
Maintain System Integrity
Maintain System Integrity The customer will make all necessary arrangements to ensure that its load does not unduly deteriorate the integrity of the power supply system, either by its design and/or operation. Specific requirements shall be...

AI summary The customer is required to ensure that its load does not negatively impact the integrity of the power supply system. Specific requirements will be outlined in a separate operating agreement, and factors such as reliability, voltage levels, and system stability will be considered in the assessment.

3.6.6 Special Conditions
3.6.6 Special Conditions - a) Special conditions in this regulation do not supersede, modify or nullify special conditions accompanying the otherwise-applicable metered tariff schedules. - b) Qualifying generating equipment must meet the f...

AI summary The special conditions for net metering in Nova Scotia specify that qualifying generating equipment must use renewable energy sources, have a maximum capacity of 100 kW, be owned by the customer, and comply with safety and performance standards. Customers must apply and sign an interconnection agreement with NSPI, and termination of the service results in a 12-month waiting period before renewal.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →