Topic/Matter Intersection

Topic:"Generator Interconnection" in M08059

Matter: Nova Scotia Power Inc. (NSPI) - Generation Utilization and Optimization
3 passages 2 documents

Generator Interconnection across all matters →

N-1Report 2 passages
Section 36
Wind Scen./ Sust CapCre NB Sens. # Sensitivity Name Load Capital dit Trans Comment Low Battery Cost Sensitivities 1‐LB Ref Low Battery Cost Ref Ref Ref No Med DSM High Wind Cap Cred 8‐LB Low Batt Cost Med DSM Ref High No 13‐LB Ref NB Trans...

AI summary The text presents sensitivity analyses for energy planning scenarios, including low battery costs, gas price variations, and forced retirements of power generation assets (Tufts Cove 3, Trenton 5). It also references updates to cost and availability models in energy planning tools like Plexos.

Section 154
capital costs incurred a range of 6.5% to 10.4% of total NPVRR costs in our main scenarios. It is critical to continue to assess the pattern of these costs and project future costs. 5. Establish requirements to allow increased levels of wi...

AI summary The document discusses capital costs and the need to assess their future impact. It also outlines requirements for increasing wind energy on the NSPI system, including infrastructure improvements and coordination with neighboring provinces for reliability with increased wind resource utilization.

70932Board Letter re approves Terms of Reference 1 passage
Section 1
Nova Scotia Utility and Review Board Mailing address Office PO Box 1692, Unit UM" 3rd Floor, 1601 Lower Water Street Halifax, Nova Scotia Halifax, Nova Scotia B3J 3P6 B3J3S3 1 855 442-4448 (toll-free) [email protected] 902 424-4448 t htt...

AI summary The Nova Scotia Utility and Review Board (NSURB) approved Synapse Energy Economics Inc.'s Terms of Reference for the Generation Utilization and Optimization analysis after reviewing stakeholder comments. The Board acknowledged Synapse's explanation of engagement opportunities and confirmed its approval of the Terms of Reference filed on August 1, 2017.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →