Topic/Matter Intersection

Topic:"Generator Interconnection" in M09096

Matter: Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between EfficiencyOne (E1) and Nova Scotia Power Inc.(NS Power), the establishment of a final agreement between the parties, and approval of a 2020-2022 Demand Side Management (DSM) Resource Plan
10 passages 2 documents

Generator Interconnection across all matters →

E-20NSPI (CA) RIR1 to RIR-54 - Redacted 1 passage
REDACTED p. p. 39
REDACTED 1 Request IR-1: 2 3 For each of the projects listed in Figure 7 of the Application, 4 5 (a) Please specify whether the project is proposed for sale of power to NS Power, supply 6 of energy behind the customer meter, or wheeling of...

AI summary The document contains a regulatory request (IR-1) asking for details about proposed projects, including their purpose, potential sale to NS Power, tariff implications, interconnection status, and reasons for construction. It also seeks clarification on NS Power’s estimate that up to 75% of these DER projects will be built.

E-23NSPI (IG) RIR-1 to RIR-10 - Redacted 9 passages
6 Figure 12: Combined Transmission & Distribution Advanced Stage Interconnection 7 Queue of June 29, 2018 p. p. 35
6 Figure 12: Combined Transmission & Distribution Advanced Stage Interconnection 7 Queue of June 29, 2018 Combined T/D Advanced Stage Interconnection Request Queue Publish Date: Wednesday, May 16, 2018 Queue Order IR# Request Date DD MMM Y...

AI summary The document presents a queue of advanced stage interconnection requests for combined transmission and distribution systems as of June 29, 2018. It includes details such as project numbers, request dates, counties, power capacities, interconnection points, types of projects, service dates, and statuses.

Section 60 p. p. 35
9 Active transmission and distribution requests not appearing in the Combined 10 Transmission & Distribution Advanced Stage Interconnection Request Queue are 11 considered to be at the initial queue stage, as they have not yet proceeded to...

AI summary The text discusses the status of active transmission and distribution requests, noting that those not in the Combined T/D Advanced Stage Interconnection Request Queue are considered to be at the initial queue stage. It references a figure indicating the location and size of generating facilities in the queue.

1 Figure 13: Generation Projects Currently in the Combined T/D Advanced Stage 2 Interconnection Request Queue p. pp. 35-36
1 Figure 13: Generation Projects Currently in the Combined T/D Advanced Stage 2 Interconnection Request Queue Nameplate Company/Location Capacity (MW) IR #426 NRIS Version of existing 64MW (IR 219, which was ERIS) Biomass N/A IR #516 Tidal...

AI summary The text presents a table listing generation projects in the combined transmission/distribution (T/D) advanced stage, including details such as project names, locations, and capacities. Projects range from biomass and tidal energy to wind and battery storage, with a total capacity of 42.4 MW.

2020-2022 DSM IG IR-05 Attachment 1 Page 39 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. pp. 45-46
2020-2022 DSM IG IR-05 Attachment 1 Page 39 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 1 7.0 RESOURCE ADEQUACY 2 3 7.1 Operating Reserve Criteria 4 5 Operating Reserves are generating resources which can be called upon by system 6...

AI summary The document outlines the operating reserve criteria for Nova Scotia Power as a member of the Maritimes Area of the Northeast Power Coordinating Council (NPCC). It specifies requirements for ten-minute and thirty-minute reserves and details the sharing of reserve responsibilities between Nova Scotia Power and New Brunswick Power based on a load-ratio share.

2020-2022 DSM IG IR-05 Attachment 1 Page 64 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. pp. 69-71
2020-2022 DSM IG IR-05 Attachment 1 Page 64 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 1 the L-6014 capacity that will be displaced with the removal of the Harbour 2 the generators are classed as BES. A sequence of events recorder...

AI summary This document discusses the status of various power generation and substation monitoring systems, including the classification of generators as BES elements, deficiencies in monitoring capabilities at specific locations, and planned assessments and upgrades in 2018. Costs for corrections are also noted.

2017 NRIS Wind Study Report 062-2017TSMG-R0 p. p. 82
2017 NRIS Wind Study Report 062-2017TSMG-R0 Principal Investigator John Charlton, P. Eng. December, 2017

AI summary The 2017 NRIS Wind Study Report, prepared by Principal Investigator John Charlton, P. Eng., provides an analysis of wind energy integration into the Nova Scotia power system. The report was submitted in December 2017 and focuses on the technical and operational aspects of wind resource interconnection.

Preamble p. p. 90
2018 10 Year System Outlook Report Appendix B Page 10 of 84 2020-2022 DSM IG IR-05 Attachment 1 Page 84 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2017 NRIS Wind Study In order to connect to the transmission system, the majority of...

AI summary The 2017 NRIS Wind Study discusses the interconnection of facilities under the Standard Generator Interconnection Procedures (GIP) approved by the Nova Scotia Utility and Review Board. Some projects were studied before the GIP's effective date and are classified as NRIS, while others are classified as ERIS and located on key parts of the transmission system impacted by the Maritime Link project.

2020-2022 DSM IG IR-05 Attachment 1 Page 95 of 158 2018 10 Year System Outlook Report Appendix B Page 21 of 84 p. p. 101
2020-2022 DSM IG IR-05 Attachment 1 Page 95 of 158 2018 10 Year System Outlook Report Appendix B Page 21 of 84 , Ele mei nts 2021 Dynamics Conting gencies Station Bkr line Bus Xfmr Var Gen Element Dynamics SPS х 713 88S BBU 88S-713 - Х 720...

AI summary The document presents a technical table outlining elements of the 2018 10 Year System Outlook Report, focusing on power system components such as stations, breakers, lines, buses, transformers, and fault scenarios. It includes details on elements like 88S, 101S, and 1015, along with associated dynamics contingencies and special protection systems (SPS).

2020-2022 DSM IG IR-05 Attachment 1 Page 153 of 158 2018 10 Year System Outlook Report Appendix B Page 79 of 84 p. p. 153
2020-2022 DSM IG IR-05 Attachment 1 Page 153 of 158 2018 10 Year System Outlook Report Appendix B Page 79 of 84 2016 B DS/ RFS Flai mant 2021 Dynamics Conti ngencies ngencies S ,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, rage 17 67N L80...

AI summary The document presents a technical table with fault scenarios and system responses related to various generators and transmission lines in the Nova Scotia power system, including fault conditions and their implications for different components.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →