Matter: P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) Action Plan Update
3 passages 2 documents

Generator Interconnection across all matters →

N-1IRP Action Plan Update 2 passages
Nova Scotia Rate Base Procurement p. p. 39
Nova Scotia Rate Base Procurement - On July 9, 2021 the Province of Nova Scotia announced the 'Rate Base Procurement' program to acquire low-cost renewable generation to serve Nova Scotia Power customers. - Customer First Renewables (CFR)...

AI summary Nova Scotia's Rate Base Procurement program aims to acquire low-cost renewable energy for Nova Scotia Power customers. Customer First Renewables (CFR) administers the procurement, with the latest RFP draft targeting 1100 GWh of wind and solar energy by 2025. Nova Scotia Power is collaborating with CFR and conducting interconnection studies as part of the process.

2022 Workplan p. pp. 46-49
2022 Workplan - Complete the development of robust transmission planning models required for the scope of studies. - Perform studies identified in the Scope of Work. - Develop documentation and guidelines including: - Planning study modell...

AI summary The 2022 Workplan outlines key activities related to transmission planning and system reliability, including the development of models, guidelines for inverter-based control systems, system strength recommendations, and inertia guidelines as traditional generators are phased out.

N-3IRP Action Plan Update 1 passage
Nova Scotia Rate Base Procurement p. pp. 33-34
Nova Scotia Rate Base Procurement On July 9, 2021, the Province of Nova Scotia announced the 'Rate Base Procurement' program to acquire low-cost renewable generation to serve Nova Scotia Power customers. Procurement parametersinclude the f...

AI summary Nova Scotia launched the Rate Base Procurement program in 2021 to acquire renewable energy for Nova Scotia Power customers. The program targets 1100 GWh of renewable energy from projects up to 100 MW, with a deadline of December 31, 2025. In 2022, the RBP portfolio included 5 wind projects totaling 372 MW, with an average energy rate of $53.17 CAD/MWh.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →