Topic/Matter Intersection

Topic:"Generator Interconnection" in M10653

Matter: P-194 - Nova Scotia Power Inc. - 10-Year System Outlook Report - 2022
4 passages 1 document

Generator Interconnection across all matters →

N-1Report 4 passages
Section 31
Wholesale Market Participant Fuel Type Capacity 10 (MW) Backup Top-Up (BUTU) 11 Wind [Ellershouse 12] 4.2 Backup Top-Up (BUTU) Import Contract 13 0 Total 4.2 3 4 3.1.1 Maximum Unit Capacity Rating Adjustments 5 6 As a member of the Maritim...

AI summary NS Power complies with NERC Standard MOD-025-2 for generator capacity verification as a member of the Maritimes Area of the Northeast Power Coordinating Council (NPCC). The document references a NSUARB decision (M09940) aligning BUTU service ELCC factors with NS Power planning practices, including 18% ELCC for wind and 0% for non-firm imports.

Section 72
Page 27 of 60 2022 10-Year System Outlook NON-CONFIDENTIAL 1 4.0 QUEUED SYSTEM IMPACT STUDIES 2 3 Active transmission and distribution requests not appearing in the Combined Transmission & 4 Distribution Advanced Stage Interconnection Requ...

AI summary The document discusses queued system impact studies related to transmission and distribution requests, including the Port Hawkesbury Biomass generating unit. It mentions the conversion of this unit from ERIS to NRIS following system upgrades associated with Transmission Service Request 400.

Section 75
GIA 6-D 569 26-Jul-19 Digby 0.6 0.6 509V-302 Tidal 30-Jul-21 N/A Executed GIA 7-D 566 16-Jan-19 Digby 0.7 0.7 509V-301 Tidal 30-Apr-22 N/A Executed FAC in 8-T 574 27-Aug-20 Hants 58.8 58.8 L-6051 Wind 30-Jun-23 NRIS Progress 28 The In-Serv...

AI summary The document presents a list of Generation Interconnection Agreements (GIAs) with details such as project numbers, dates, locations, capacities, and statuses. It also references the 2022 10-Year System Outlook, indicating a focus on infrastructure planning and interconnection processes.

Section 137
1 • Purchase of replacement spare for unit utilized at 58C-SW Margaree Substation 2 (C0031052) 3 • Purchase suitable lot for establishing a new 138kV–25kV Suzie Lake Substation. 4 • Purchase new 138 kV–25 kV, 15 MVA Skid-Mounted Substation...

AI summary The text lists various infrastructure projects and maintenance activities related to power substations and transmission lines in Nova Scotia, including replacements, constructions, and relocations aimed at improving system reliability and capacity.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →