N-2NSPI (CA) RIR 1 to 7 - Redacted 1 passage
NON-CONFIDENTIAL
NON-CONFIDENTIAL 1 Response IR-5: 2 3 (a-c) Please refer to Section 3.2.7 in the 2025 10-Year System Outlook for an update on the 4 generation capacity.1 status and timing of the fast-acting 5 6 (d) NS Power has not pursued updates since t...

AI summary NS Power has not updated its generation capacity plans since the project was transferred in September 2024, as outlined in M12012. They are not currently re-evaluating investment between resources for 2030 targets but will do so as part of the next Integrated Resource Plan (IRP) conducted by the NSIESO. Fast-acting generation is highlighted for its firm capacity value in enabling coal unit retirement.

N-3NSPI (ESC) RIR 1 to 5 1 passage
Preamble p. p. 5
- 1 Please refer to NS Power's annual Interconnection Processes report filed with the NSEB on March - 2 31, 2025 regarding renewable curtailment scope of work under the interconnection processes - 3 proceeding (M10905). Date Filed: July 15...

AI summary The document references NS Power's annual Interconnection Processes report filed with the NSEB on March 31, 2025, which outlines the scope of work for renewable curtailment under the interconnection processes proceeding (M10905).

N-7NSPI (SBA) RIR 1 to 18 1 passage
NON-CONFIDENTIAL p. p. 12
NON-CONFIDENTIAL 1 Request IR-4: 18 Any modifications to an existing RAS, or any creation of a new RAS, must receive 19 NPCC review and approval prior to being placed in service. 20 21 (b) Please see the responses to part (a). Generation i...

AI summary The text discusses requirements for modifying or creating Remedial Action Schemes (RAS) and the need for NPCC review and approval. It also outlines specific generation additions along transmission corridors that require updated RAS and NPCC studies, including wind projects in advanced stages of interconnection requests.

98212CA (NSPI) IR 1 to 7 1 passage
17 Request IR-2:
17 Request IR-2: 18 19 RE: Action Plan Item 2b 20 21 Please provide a description of data that NS Power monitors, or anticipates monitoring, to 22 understand trends in electrification impacts. If available, please provide those data. For e...

AI summary NS Power requests data on electrification impacts, including interconnection and upgrade requests, overloaded facilities, and mitigation efforts. The request seeks insights into trends related to grid infrastructure and system reliability.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →