Turbine and Generator - Turbine Three sections: high pressure (HP), intermediate pressure (IP), and low pressure (LP). Steam from the boiler passes through the HP section, reheats in the boiler, then passes through IP and LP sections befor...
AI summary The turbine consists of high pressure, intermediate pressure, and low pressure sections, with a scheduled inspection and refurbishment in 2025. The generator, directly coupled to the turbine, was inspected and refurbished in 2024 and is expected to operate through plant retirement without further major refurbishment.