Matter: NSP Maritime Link Inc. -  2026 Assessment Application - NSPML
5 passages 2 documents

Generator Interconnection across all matters →

N-8NSPML (NSEB) RIR 1 to 44 - Redacted 4 passages
NON-CONFIDENTIAL p. p. 47
NON-CONFIDENTIAL 1 Response IR-25: 2 3 a) & b) 4 5 Most of the assets within the Maritime Link are part of a single significant transmission 6 corridor primarily for the transfer of the Nova Scotia Block and market energy. The 7 relative c...

AI summary The response discusses the significance of the Maritime Link transmission corridor in Nova Scotia, emphasizing its critical role in system operations and reducing fossil fuel reliance. It highlights the complexity of converter stations and their importance in system stability and operational flexibility.

SCHEDULE P: PRODUCTS AND RELATED DEFINITIONS p. p. 74
SCHEDULE P: PRODUCTS AND RELATED DEFINITIONS "Ancillary Services" means any of the services identified by a Transmission Provider in its transmission tariff as "ancillary services" including, but not limited to, regulation and frequency re...

AI summary Schedule P defines key terms related to energy transactions, including ancillary services, capacity, energy, and firm transmission contingent contracts. These definitions outline obligations and exceptions under Force Majeure conditions.

" Confidential Information " means: p. p. 74
y other jurisdiction affecting any of its creditors or seeking reorganization, readjustment, arrangement, composition, protection from creditors, or similar relief under any bankruptcy or insolvency law or any other similar Applicable Law,...

AI summary The text defines 'Confidential Information' and outlines scenarios involving bankruptcy, insolvency, and reorganization proceedings. It also defines the 'Interconnection Operators Agreement' between NLH and Nova Scotia Power Incorporated, dated July 31, 2012.

2. Scheduling and Deliveries p. p. 119
- (iii) The Nova Scotia Block Delivery Period, and associated ramping periods, can be shifted to commence up to 90 minutes earlier or later. - (iv) Given that system operating constraints do not allow for the instantaneous delivery of the...

AI summary This section outlines the flexibility and constraints related to the Nova Scotia Block Delivery Period, including adjustments to timing, ramping, capacity, and energy delivery. It describes how Nalcor and Emera can manage energy delivery and capacity within the system's operational limits and constraints.

N-21UARB APPROVAL SHEET Replace L6513/Upgrade Line Terminals 1 passage
Why do this project now? p. p. 21
Why do this project now? Completing the Project eliminated the system constraints that would be introduced if the Maritime Link Project were to be completed before this work was carried out. Additionally, completingthe Project increased th...

AI summary Completing the Project eliminated system constraints that would arise if the Maritime Link were completed first, increased power transfer capability from Onslow to Halifax by 80 MW, and reduced planned outages due to NPCC requirements on the Bulk Power System. Energy from the Maritime Link is being received by NS Power.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →