Topic/Matter Intersection

Topic:"Generator Interconnection" in M12508

Matter: Nova Scotia Power - CI C0080112 – HYD Big Falls Unit 6 Rotor Re-Insulation (U&U) - $1,025,626
2 passages 2 documents

Generator Interconnection across all matters →

N-1CI C0080112 - HYD Big Falls Unit 6 Rotor Re-Insulation U&U - Redacted 1 passage
REDACTED CI C0080112 Page 2 of 4 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 1
REDACTED CI C0080112 Page 2 of 4 REDACTED (CONFIDENTIAL INFORMATION REMOVED) These findings demonstrate that the generator cannot be safely or reliably returned to service without full refurbishment of the affected rotor poles.

AI summary The document states that the generator cannot be safely or reliably returned to service without full refurbishment of the affected rotor poles.

N-2NSPI (NSEB) RIR 1 to 7 - Redacted 1 passage
NSPI Responses to NSEB Information Requests
NSPI Responses to NSEB Information Requests NON-CONFIDENTIAL Request IR-3: The application notes that Big Falls Unit 6 was taken offline in May 2025 to investigate a potential oil leak: (a) What is the frequency of maintenance performed on...

AI summary NSPI responded to NSEB's Information Request IR-3 regarding maintenance on Big Falls Unit 6, which was taken offline in May 2025. Preventative maintenance is typically performed bi-annually, but due to operational issues and limited use, maintenance was not conducted at the usual interval. The last maintenance was Slip Ring and Brush Maintenance in March 2025, with supporting documentation provided.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →