Topic:"Generator Interconnection" in M12550

Matter: To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)
3 passages 3 documents

Generator Interconnection across all matters →

N-1RTU Work Order - Redacted 1 passage
Why do this project now?
Why do this project now? The inventory of RTU spare parts has become sparse. The RTUs being replaced by this project have been deemed obsolete, as discussed above. RTU installations require extensive time and effort (approximately 12 weeks...

AI summary This project aims to replace obsolete RTUs due to their obsolescence and increasing risk of failure. The project is considered in-service upon the first installation, with the final cost date set six months after the last unit is expected to be completed.

N-3Evidence - Midgard - Redacted 1 passage
Electrical Engineer / Site Inspector p. p. 57
Electrical Engineer / Site Inspector - Supervised construction / installation and commissioning of the 230 / 400 kV substations, represented the consultant engineer at site, responsible for safety at site, SAT, FAT, quality and progress of...

AI summary The individual supervised the construction and commissioning of 230/400 kV substations, participated in factory acceptance tests for transformers from multiple vendors, and conducted substation visits at various stages to ensure accuracy and evaluate equipment conditions.

100252Midgard (NSPI) IR 1 to 17 - PDF 1 passage
Request IR-1: p. p. 6
Request IR-1: - At Page 1 of 6 of the Application CI C0051815 RTU Replacements Program Phase 6 (Exhibit N-1), NS Power states: - This project provides for the replacement of fourteen RTUs in 2025 through 2027. The associated telecommunicat...

AI summary The document requests detailed information regarding the replacement of RTUs in Phase 1 and Phase 6 of the RTU Replacements Program, including IFC packages, as-built drawings, and variances between IFC and as-built conditions.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →