Matter: North American Electric Reliability Corporation (NERC) - Third Quarter 2025  - Application for Approval of Reliability Standards
11 passages 1 document

Generator Interconnection across all matters →

N-1Application 11 passages
1. PRC-029-1; PRC-024-4 - Inverter-based Resource (IBR) Ride-through Reliability Standards p. p. 34
Planning and Operational Studies Requirements for all IBRs (completion: November 4, 2026). Reliability Standards PRC-024-4 and PRC-029-1 relate to Generator Ride-through and are part of Milestone 2. Reliability Standard PRC-029-1 establish...

AI summary The document outlines the requirements for Planning and Operational Studies for Inverter-based Resources (IBRs) under Reliability Standards PRC-024-4 and PRC-029-1. These standards focus on generator ride-through performance, ensuring IBRs maintain reliability during disturbances and defining criteria for synchronous generators and wind units.

4.1. Functional Entities: p. p. 34
4.1. Functional Entities: - 4.1.1. Generator Owners that apply protection listed in Sections 4.2.1 or 4.2.2. - 4.1.2. Transmission Owners that apply protection listed in Section 4.2.2. - 4.1.3. Transmission Owners (in the Quebec Interconne...

AI summary This section outlines the functional entities involved in applying protection measures, including Generator Owners, Transmission Owners, and Planning Coordinators, specifically within the Quebec Interconnection. These entities are responsible for implementing protections as detailed in various sections of the document.

B. Requirements and Measures p. pp. 34-57
- 3.1. The Generator Owner and Transmission Owner shall communicate the documented regulatory or equipment limitation, or the removal of a previously documented regulatory or equipment limitation, to its Planning Coordinator and Transmissi...

AI summary This section outlines requirements for Generator Owners and Transmission Owners to document and communicate equipment or regulatory limitations and protection settings. They must notify Planning Coordinators and Transmission Planners within 30 days of identifying or removing such limitations and provide protection settings within 60 days of a request.

Evaluating Protection Settings: p. p. 38
Evaluating Protection Settings: The voltage values in the Attachment 2 voltage boundaries are voltages at the high-side of the GSU/MPT. For resources with multiple stages of step up to reach interconnecting voltage, this is the high-side o...

AI summary The document outlines procedures for evaluating protection settings, focusing on voltage measurements at the high-side of the GSU/MPT. It emphasizes considering voltage differences, loading conditions, and transformer tap settings when using steady-state calculations or dynamic simulations.

Evaluating Protection Settings: p. p. 40
Evaluating Protection Settings: The voltage values in the Attachment 2A voltage boundaries are voltages at the high-side of the GSU/MPT. For resources with multiple stages of step up to reach interconnecting voltage, this is the high-side...

AI summary The document discusses evaluating protection settings for electrical systems, focusing on voltage values at the high-side of the GSU/MPT and conditions to consider when using steady state calculations or dynamic simulations for accurate evaluation.

Violation Severity Levels p. pp. 40-57
Violation Severity Levels Violation Severity Levels R # Lower VSL Moderate VSL High VSL Severe VSL R1. The Generator Owner failed to ensure the design capability of each applicable IBR to Ride-through in accordance with Attachment 1, excep...

AI summary The document outlines violation severity levels related to the design capability of Inverter-based Resources (IBR) in adhering to ride-through and performance requirements during voltage excursions. Specific violations are categorized under Lower, Moderate, High, and Severe VSL based on the Generator Owner's failure to ensure compliance with specified requirements.

Section 98 p. p. 40
- a. IBR, regardless of their energy resource, interconnecting via a dedicated VSC-HVDC transmission facility. - b. Other IBR or hybrid IBR consisting of photovoltaic (PV) and BESS. - 3. The applicable voltage for VSC-HVDC system with a de...

AI summary The text outlines technical specifications for IBR systems interconnecting via VSC-HVDC, including voltage bases, ride-through requirements, and permissible trip settings. It emphasizes compliance with defined voltage ranges and frequency zones.

E. Associated Documents p. p. 57
E. Associated Documents Implementation Plan Calculating Extreme Cold Weather Temperature EOP-012-3 Technical Rationale Generator Cold Weather CAP Extension and Constraint Process

AI summary The document references several associated documents, including an implementation plan, a method for calculating extreme cold weather temperature, a technical rationale document, and processes related to generator cold weather capacity extension and constraints.

Preamble p. p. 57
Generator Owners shall determine the applicability of a Generator Cold Weather Constraint declared under Requirements R2, R6, and R7 using the criteria as described below. The definition of a Generator Cold Weather Constraint is: "Any cond...

AI summary The document defines a Generator Cold Weather Constraint as a condition preventing a Generator Owner from implementing freeze protection measures on critical components, and outlines criteria for identifying such constraints under specific requirements.

Case-by-case Determinations of Generator Cold Weather Constraints p. p. 57
upon approval by the CEA will these circumstances constitute a valid Generator Cold Weather Constraint: 1. The implementation of a specific freeze protection measure will void an equipment warranty.

AI summary The text raises a question about whether a specific freeze protection measure that voids an equipment warranty can be considered a valid Generator Cold Weather Constraint upon approval by the CEA.

Any comments regarding this glossary should be reported to the NERC Help Desk. Select "Standards" from the "Service" drop-down menu and "Other" from the Standards Subcategory drop-down menu. p. p. 57
Any comments regarding this glossary should be reported to the NERC Help Desk. Select "Standards" from the "Service" drop-down menu and "Other" from the Standards Subcategory drop-down menu. Subject to Enforcement Generator Cold Weather Cr...

AI summary The document defines 'Generator Cold Weather Critical Component' and 'Generator Cold Weather Constraint' in the context of regulatory proceedings. These definitions are part of a project related to generator reliability and cold weather performance, with specific dates and regulatory references provided.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →