N-2NSPI (NSEB) RIR 1 to 20 - Redacted 1 passage
L-6515b p. pp. 8-12
L-6515b Substation Equipment related to this line are the 4C-622 and 4C-621 breaker. Additionally, the switches 4C-622A, 4C-622B, 4C-621A, 4C-621B and 100C-604 are associated with this line. Metering is provided by a transducer at 4C, this...

AI summary The document details substation equipment and metering configurations for multiple lines, including breakers, switches, current transformers, transducers, and protection relays. These components are factored into line ratings for accurate electrical system management.

100485NSEB (NSPI) IR 1 to 20 - PDF 1 passage
Request IR-11:
Request IR-11: - In Matter M09508, NS Power's response to NSUARB IR-19, the utility provided a table listing - unplanned interruptions to transmission lines corridor caused by weather between 2015 and - November 2019. - a) Add data from De...

AI summary Request IR-11 asks NS Power to provide updated data on unplanned transmission line interruptions, including customer impact and outage details, and to explain how DLR technology can reduce such interruptions. It also seeks information on the consequences of trips and steps for grid restoration.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →