Topic:"Generator Interconnection" in M12687

Matter: Nova Scotia Power Inc. - 2025 COMFIT Annual Report
1 passage 1 document

Generator Interconnection across all matters →

N-12025 Community Feed-In Triff Report 1 passage
3.0 INTERCONNECTION PROCESS For the purposes of interconnection, NS Power separates distribution projects into two categories: those less than 100 kW, which do not require the engagement of the Distribution Generator Interconnection Procedures, and those greater than 100 kW, which do require engagement of the Distribution Generator Interconnection Procedures. Appendix A provides details of: (1) committed distribution COMFIT projects greater than 100 kW that appear in the NS Power Combined T&D Advanced Stage Interconnection Request Queue; and (2) committed distribution COMFIT projects less than 100 kW. p. pp. 3-7
3.0 INTERCONNECTION PROCESS For the purposes of interconnection, NS Power separates distribution projects into two categories: those less than 100 kW, which do not require the engagement of the Distribution Generator Interconnection Proced...

AI summary NS Power categorizes distribution projects into two interconnection process categories: those under 100 kW (no formal procedures required) and those over 100 kW (requiring Distribution Generator Interconnection Procedures). Appendix A details COMFIT projects in both categories.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →