Topic:"Generator Interconnection" in M12768

Matter: Nova Scotia Power Inc. - Extra Large Industrial Active Demand Control Tariff (ELIADC) - 2025 Annual Report
2 passages 2 documents

Generator Interconnection across all matters →

N-2NSPI (BW) RIR 1 to 10 - Redacted 1 passage
Extra Large Industrial Active Demand Control (ELIADC) Tariff 2025 Annual Report (NSEB M12768) NSPI Responses to BW Information Requests
Extra Large Industrial Active Demand Control (ELIADC) Tariff 2025 Annual Report (NSEB M12768) NSPI Responses to BW Information Requests 1 Request IR-6: 2 3 Please refer to PDF page 4, "Off-Schedule Summary" and "Other Code Summary." 4 5 (a...

AI summary The document outlines NSPI's responses to BW Information Requests regarding the ELIADC Tariff 2025 Annual Report, including inquiries about cause codes, dispatch processes, and schedule deviations post-cyber event.

N-3NSPI (IG) RIR 1 to 15 - Redacted 1 passage
EXTRA LARGE INDUSTRIAL ACTIVE DEMAND CONTROL TARIFF Page 5 of 7 p. pp. 10-11
EXTRA LARGE INDUSTRIAL ACTIVE DEMAND CONTROL TARIFF Page 5 of 7 Schedule 1: Active Demand Control Energy Supply Protocol - (12) Subject to available generation or load, as the case may be, efforts will be made to reconcile variances in a t...

AI summary This section of the Extra Large Industrial Active Demand Control Tariff outlines the energy supply protocol, including procedures for reconciling variances, scheduling and operations team requirements, compliance with NS OATT and NS Market Rules, and the dispatch authority of NS Power and NSPSO.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →