N-4NSPI (NSEB) RIR 1 to 9 1 passage
8 \ \ Medium industrial rate class excluded due to insufficient data during the AMI sample year (2024). p. p. 9
8 \ \ Medium industrial rate class excluded due to insufficient data during the AMI sample year (2024). 1 Request IR-7: 14 Interconnection Requests. 15 16 More generally, when a required network upgrade is identified, NS Power engages with...

AI summary The text discusses NS Power's process for handling interconnection requests, including customer engagement during network upgrades and the evaluation of least-cost solutions. It also references a request regarding the withdrawal of CNMP applications in 2025.

N-5NSPI (SBA) RIR 1 to 5 1 passage
1 Request IR-1:
(b) Yes, this refers to interconnection customers that, at the time of Report preparation, had not yet identified the program or option under which they were interconnecting. In accordance with the Interconnection Processes, interconnectio...

AI summary The text discusses interconnection customers who have not yet selected a program option under the CNMP. It also explains that CNMP is governed by the Electricity Act and Renewable Electricity Regulations, and that net metering customers using solar PV do not reliably reduce demand during peak hours, requiring NS Power to maintain firm generating capacity.

101871SBA (NSPI) IR-1 to IR-5 2 passages
Request IR-4:
Request IR-4: Refer to M12782, Exhibit N-1(i), the 2025 Report Appendix A, and the two tabs entitled "2025 CNMP Applications" and "2025 CNMP In Progress" and answer the following questions: - a) Please confirm that as of today only one pro...

AI summary Request IR-4 seeks clarification on battery storage projects in NS Power's 2025 CNMP applications, the status of Active Interconnected BES, impacts on DGIP timelines, the meaning of 'Applying Aggregation,' and feeder status relative to past problem feeders. Questions focus on project specifics, procedural impacts, and compliance with infrastructure planning.

Request IR-5:
Request IR-5: Refer to M12782, Exhibit N-1, the 2025 Report, page 13 of 13 at lines 11 -16, which states: The CNMP estimated contribution to 2025 RES and a RECs status update (i.e. number of opt-ins and annual REC volumes) is provided in A...

AI summary The text references M12782, Exhibit N-1, and the 2025 Report, discussing the exclusion of interconnection requests without CNMP applications, particularly for Class 2 applicants. It raises three questions about program options for Class 2 applicants, the meaning of 'consistent with prior reports,' and the impact of RES and RECs on peak demand and other customer classes.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →