Topic/Matter Intersection

Topic:"Generator Interconnection" in M13116

Matter: Northeast Power Coordinating Council (NPCC) - Third Quarter 2026 for Approval of Revised Regional Reliability Criteria
2 passages 1 document

Generator Interconnection across all matters →

N-1Application 2 passages
3.2 Correction of Abnormal Voltage Conditions p. p. 16
smission Operators should assist by using some or all of the control actions listed in Section 3.2.3.1 where effective and as available, in accordance with their respective voltage control procedures. - 3.2.3.3 If the steps in Sections 3.2...

AI summary The document outlines steps for Transmission Operators to correct abnormal voltage conditions, including modifying transactions, operating hydraulic units, rescheduling pumped hydro units, and requesting assistance from adjacent operators if necessary.

6.1 Generator Tripping at Frequency below the Curve in NERC PRC-006-NPCC Figure 2 p. p. 16
6.1 Generator Tripping at Frequency below the Curve in NERC PRC-006-NPCC Figure 2 If the frequency decays below the curve shown in NERC PRC-006-NPCC Figure 2, steps may be taken to protect generating equipment, including separation from th...

AI summary This section discusses generator tripping at frequencies below the curve in NERC PRC-006-NPCC Figure 2. It outlines measures such as isolating generators and manual load shedding to protect equipment and address low frequency issues lasting over 300 seconds.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →